Loading...
HomeMy WebLinkAboutCorrespondence Gr. CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 16, 2006 TO: Rabon Metcalf, via email rmengineer@verizon.net FROM: Jennifer Reeves (for Lindsay Boyer), Project Manager SUBJECT: CREEK MEADOW (PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, November 20th by 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for December 7th at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. $200 processing fee for the next round of three reviews; and One (1) 24" x 36" copy of the revised Preliminary Plat. One (1) 24" x 36" set of Mylar's of the revised Preliminary Plat. Sixteen(16) 11" x 17" copies of the revised Preliminary Plat. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Creek Meadow Partners do Todd Carnes, via fax 979.693.7839 Case file #06-00500220 Home of Texas A&M University TRANSMISSION VERIFICATION REPORT TIME : 11/16/2006 16:45 NAME : FAX . TEL . SER.# : 000L53596800 DATE,TIME 11/16 16:45 FAX NO./NAME 96937839 DURATION 00:00:23 PAGE(S) 02 RESULT OK MODE STANDARD ECM 4r,115.4 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 16, 2006 TO: Rabon Metcalf, via email rmengineer@averizon.net FROM: Jennifer Reeves (for Lindsay Boyer), Project Manager SUBJECT: CREEK MEADOW(PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed_ Please address the comments and submit the following information by Monday, November 20th by 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for December 7th at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. $200 processing fee for the next round of three reviews; and One (1) 24" x 36" copy of the revised Preliminary Plat_ CITY OF COLLEGE STATION Planning dr Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 23,2006 TO: Rabon Metcalf,via email rmengineer@verizon.net FROM: Lindsay Boyer,Staff Planner SUBJECT: CREEK MEADOW(PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 30th, 10:00 a.m.,your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 16th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x 36" copy of the revised Preliminary Plat;and Sixteen (16) 11"x 17" copies of the revised Preliminary Plat. Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed,your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Creek Meadow Partners c/o Todd Carnes,via fax 979.693.7839 Case file#06-00500220 Home of Texas A&M University 4' z ® \ RABON M ETCALF ENGINEERING ---"'"'"'"'" 4"u'rw0000etksizo (979)690-0329 - Ho caS POST OFFICE BOX 9253 ''`' COLLEGE STATION,TEXAS (979)690-0329 FAX (979)219-4174 - CELL EMAIL: rmengineer o@juno.com aft 911A° • November 6,2006 Carol Cotter,E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station,TX 77842 Cc: Lindsey Boyer StaffPlanner RE: Creek Meadows: Preliminary Plat—rd Submission RME No.202-0273 Dear Carol: Please find attached the following information for the above referenced project: ®42- > One(1)copy of revised Preliminary Plat(24"x36"size);OY-- V ➢ Sixteen(16)copies of revised Preliminary Plat(11"x17"size); ' f ➢ One(1)copy of responses to Staff Review Comments No. 2; Please do not hesitate to call if you have any questions. Sincerely, ..sss.-Warp° Rabon A. Metcalf, P.E. rabonC.rmengineer.com CD1-202-0286-L03 Page- 1 of 1 Page 1 of 1 Rabon A. Metcalf, P.E. From: Lindsay Boyer[Lboyer@cstx.gov] Sent: Monday, November 06,2006 8:00 AM To: rmengineer@verizon.net Cc: Carol Cotter Subject: Creek Meadows Rabon, I do not have comments from Carol yet, but I wanted to give you a heads up on my only comment. Looking at the block length,there is still a problem with the southwest side of Greens Prairie Trail with a block length of 1880.Additionally, is there any possible way to get another connection on Royder Road,or to move the one you did place down to meet the block length?I know there is a creek running through there and a proposed retention facility.These will need variances if not addressed,so let me know how you and Todd want to proceed.I will be finishing the staff report this morning. Depending on Carol's comments, I don't see any reason why this won't make the meeting on the 16th. I'll either need revised drawings by Thursday at 10, or a request for a variance by Wednesday at 5. Also,you can remove the block length on the southeast end of the property(1625'and 945'). Block lengths are only measured along ROW,so these will not count against you as it is still contiguous land.Also, please remove the block length along Greens Prairie Trail that is 1670'.This was agreed upon during the facilitation meeting. Please call me if you have any questions. Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station,Texas 77840 (979) 764-3570/(979) 764-3496 Fax iboyer@cstx.gov vvviiw.cstx.gov College Station. Heart of the Research Valley. 11/8/2006 V . ENGINEERING COMMENTS NO. 2 XPlease revise HOA Note # 5 to "Maintenance of the sanitary sewer system will be the City of College Station once the system is accepted by the City of College tation'. G Common Area W needs a PUE designation to cover long side services. G The common area in Barker Loop needs a PUE designation to cover long side services. 7-rhe common area in Buffalo Creek Loop needs a PUE designation to cover long side services and sewer main. Water and sewer mains crossing the Creek Meadow Blvd median between Wild Horse Creek and Silver Brook require PUEs. plc., 6. Utility line sizes and fire hydrant locations are considered preliminary and will be determined by appropriate studies at time of Final Plat. Make sure that each lot is within 500'from a fire hydrant. Remove PUE designation from private alleys where there is no public infrastructure. Reviewed by: Carol Cotter Date: November 6, 2006 (*.ffill11114 CITY OF COLLEGE STA'T'ION Planning 6 Development Service 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 23,2006 TO: Rabon Metcalf,via email rmengineer@verizon.net FROM: Lindsay Boyer,Staff Planner SUBJECT: CREEK MEADOW(PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 30th, 10:00 a.m.,your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 16th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x 36" copy of the revised Preliminary Plat; and Sixteen (16) 11"x 17" copies of the revised Preliminary Plat. Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed,your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Creek Meadow Partners c/o Todd Carnes,via fax 979.693.7839 Case file#06-00500220 Home of Texas A&M University (11/1/2006) Carol Cotter- RE: Creek Meadows -County Variances Page 1 w From: "Rabon A. Metcalf, P.E." <rmengineer@verizon.net> To: "'Carol Cotter"' <Ccotter@cstx.gov> Date: 11/1/2006 3:51 PM Subject: RE: Creek Meadows- County Variances CC: <garnold@co.brazos.tx.us> Carol, I spoke with Gary and he said that we were set to go with him. Though the agenda did not specifically mention this the letter that I sent was apart of the back-up for the variance request and was in the Commissioner's packet. Let me know if we need to do anything on the City side, but again Gary said we were fine from a county stand-point. Rabon A. Metcalf, P.E. Rabon Metcalf Engineering P.O. Box 9253 College Station, TX 77842 Off: (979)690-0329 Fx: (979) 690-0329 Mb: (979)219-4174 Original Message From: Carol Cotter[mailto:Ccotter@cstx.gov] Sent: Wednesday, November 01, 2006 9:14 AM To: P.E. Rabon A. Metcalf Subject: Re: Creek Meadows - County Variances I don't see the variance listed on the agenda for private utilities, etc. in the ROW. >>> "Rabon A. Metcalf, P.E." <rmengineer@verizon.net> 10/31/2006 10:06 AM >>> The requested variances were approved today at Commissioner's Court. Lindsey, when will the P&Z commissioners get their packet? Thanks, Rabon A. Metcalf, P.E. Rabon Metcalf Engineering P.O. Box 9253 College Station, TX 77842 Off: (979)690-0329 Fx: (979)690-0329 (11/1/2006) Carol Cotter- RE: Creek Meadows -County VariancesPage 2 Mb: (979)219-4174 College Station. Heart of the Research Valley. (11/1/2006) Carol Cotter- Creek Meadows- County Variances Page 1 From: "Rabon A. Metcalf, P.E." <rmengineer@verizon.net> To: "Carrol Cotter EIT" <Ccotter@cstx.gov>, "'Lindsay Boyer' <Lboyer@cstx.gov> Date: 10/31/2006 10:07 AM Subject: Creek Meadows - County Variances Attachments: CD1-202-0286-LO1.pdf; 20061031-Agenda.pdf CC: <toddcarnes@tconline.net>, "Pat Baker" <Bexcol@hughes.net> The requested variances were approved today at Commissioner's Court. Lindsey, when will the P&Z commissioners get their packet? Thanks, Rabon A. Metcalf, P.E. Rabon Metcalf Engineering P.O. Box 9253 College Station, TX 77842 Off: (979) 690-0329 Fx: (979) 690-0329 Mb: (979)219-4174 , RABON M ETCALF ENGINEERING POST OFFICE BOX 9253 �. (979)690-0329 - Home COLLEGE STATION,TEXAS 77842 (979)690-0329 - FAX \ (979)219-4174 - CELL \ EMAIL: s.men in eer g u no.com October 26, 2006 Gary Arnold Brazos County Road & Bridge 2617 Hwy 21 West Bryan, Texas 77803 RE: Creek Meadows, College Station E.T.J., Brazos County, TX County Variance Request RME No. 202-0286 Gary Arnold: Based on various meetings and discussions the following variances to the Brazos County Subdivision & Development Regulations are being requested for the above referenced project. These variances are being requested since sanitary sewer has been approved, and there sewer service area (CCN) has been expanded to include this subdivision, by the City of College Station-City Council and therefore the property can be developed in a typical residential/urban fashion. These variances are more specifically identified as follows: ❖ Minimum lot width of 45 feet. For cul-de-sac lots, located around the perimeter of the bulb, the measurement will be taken along the building setback line which is typical to the CoCS Subdivision Regulations; ❖ Minimum right-of-way width of 50 feet for residential local streets, 60 feet for collector streets, and 100 feet for boulevard entrance streets. These right-of-way widths are typical to the CoCS Subdivision Regulations and 2006 B/CS Unified Design Guidelines & Standards; ❖ Block lengths of 1500 feet and 2000 feet for cul-de-sac streets which is typical to the CoCS Subdivision Regulations; ❖ Streets to be constructed with curb and gutter type section. These street widths and pavement design standards will be in accordance with the CoCS Subdivision Regulations and 2006 B/CS Unified Design Guidelines & Standards as dictated by right-of-way width (i.e. 50' ROW's call for a 27' wide street); ❖ No encasing/sleeving of non-pressure utilities being gravity storm drains and gravity sanitary sewer and their associated leads, services, and laterals when crossing under a county road. All other utilities (water, water services, phone, cable, gas, and electric) will be sleeved under the county road; ❖ Placement of 10 foot wide side yard PUE's as requested by the private utility companies (gas, phone, cable, electric) and where required for public water and sanitary sewer. Where these side yard PUE's are not requested none will be platted. We currently are Filename:CD 1-202-0286-L01 Page- 1 of 2 Creek Meadow Subdivision Rabon Metcalf Engineering Brazos County Variance Request October 26,2006 waiting for responses from these private utility companies for placement of side yard PUE's; ❖ Building setbacks as follows in Table #1: TABLE#1 Single-Family Multi-Family Setback (ft) (ft) Front 20 16 Street Side 15 15 Side 5 5 Rear 20 20 Items that will be located in county right-of-way, which will be maintained by the HOA, are listed below. The recorded deed restrictions, illustrating maintenance responsibility by the HOA, will be provided prior to filing of any Final Plat document. ❖ All improvements behind the back of curb; ••• Storm Sewer System; ••• Retention/Detention Facilities; ••• Green belts,pedestrian access ways, and other common areas; ••• Sidewalks; ❖ Street lights; ❖ Alleys; ❖ Cluster mailboxes and individual mailboxes. Individual mail boxes will only be located on local streets and not on collector streets; Thank you for your consideration in these matters. Sincerely, Todd Carnes Managing Partner Filename:CD 1-202-0286-L01 Page-2 of 2 Page 1 of 1 Lindsay Boyer - Re: Creek Meadow Development From: Jennifer Prochazka To: Cathy Berry Date: 12/7/2006 2:38:45 PM Subject: Re: Creek Meadow Development CC: Lindsay Boyer Good afternoon, I will forward your email to the Project Manager, Lindsay Boyer. Please let me know if you have any questions. Thanks! Jennifer Prochazka, AICP Senior Planner Dept. of Planning & Development Services City of College Station tel.: 979.764.3570 fax: 979.764.3496 www.cstx.gov >>> "Cathy Berry" <caberry@cox-internet.com> 12/7/2006 2:35 PM >>> I would like to express my complete opposition to the new development planned for Wellborn community. I understand development is necessary, my husband is a home builder. However, a high density development planned for a rural area such as Wellborn does not seem wise. Do we have the infrastructure in place to accommodate all of this? I am sure that we do not. The puny little sewer line being installed seems grossly inadequate. Will Wellborn water be able to supply all of the new needs and maintain water quality and pressure for those of us already here? What about the traffic on Wellborn Road,Greens Prairie Road and Greens Prairie Trail? Do the highways presently there seem adequate to you for the amount of traffic they will have to carry in the near future? What about the safety of the residents already living in this area?We enjoy the rural life. Would you want duplexes and student housing near your home? I am fairly sure you wouldn't . We live in a rural community to get away from that. I am sure changes to the development that insure that it is NOT high density would be beneficial and would preserve the rural community we enjoy. Out of town investors care nothing about the quality of life we enjoy. I hope that you do and will consider that as you study this development. I also ask that you not accept the prelimary plat tonight before you consider input from the community. Sincerely, Cathy Berry Woodlake Estates file://C:\Documents and Settings\lboyer.CSTX\Local Settings\Temp\GW}00002.HTM 12/7/2006 • CreekN'teo(IMPF tatRABON M ETCALF ENGINEERING -_-^`""•' -P (979)690-0329 - Home OST OFFICE 9253 (979)690-0329 - FAX COLLEGE STATION,TEXAS 77842 (979)219-4174 - CELL EMAIL: rmengineer@juno.com October 26, 2006 Gary Arnold Brazos County Road & Bridge 2617 Hwy 21 West Bryan, Texas 77803 RE: Creek Meadows, College Station E.T.J.,Brazos County,TX County Variance Request RME No. 202-0286 Gary Arnold: Based on various meetings and discussions the following variances to the Brazos County Subdivision & Development Regulations are being requested for the above referenced project. These variances are being requested since sanitary sewer has been approved, and there sewer service area (CCN) has been expanded to include this subdivision, by the City of College Station-City Council and therefore the property can be developed in a typical residential/urban fashion. These variances are more specifically identified as follows: ❖ Minimum lot width of 45 feet. For cul-de-sac lots, located around the perimeter of the bulb, the measurement will be taken along the building setback line which is typical to the CoCS Subdivision Regulations; ❖ Minimum right-of-way width of 50 feet for residential local streets, 60 feet for collector streets, and 100 feet for boulevard entrance streets. These right-of-way widths are typical to the CoCS Subdivision Regulations and 2006 B/CS Unified Design Guidelines & Standards; ❖ Block lengths of 1500 feet and 2000 feet for cul-de-sac streets which is typical to the CoCS Subdivision Regulations; ❖ Streets to be constructed with curb and gutter type section. These street widths and pavement design standards will be in accordance with the CoCS Subdivision Regulations and 2006 B/CS Unified Design Guidelines & Standards as dictated by right-of-way width (i.e. 50' ROW's call for a 27' wide street); ❖ No encasing/sleeving of non-pressure utilities being gravity storm drains and gravity sanitary sewer and their associated leads, services, and laterals when crossing under a county road. All other utilities (water, water services,phone, cable, gas, and electric)will be sleeved under the county road; ❖ Placement of 10 foot wide side yard PUE's as requested by the private utility companies (gas, phone, cable, electric) and where required for public water and sanitary sewer. Where these side yard PUE's are not requested none will be platted. We currently are Filename:CD1-202-0286-L01 Page- 1 of 2 Creek Meadow Subdivision Rabon Metcalf Engineering Brazos County Variance Request October 26,2006 waiting for responses from these private utility companies for placement of side yard PUE's; ❖ Building setbacks as follows in Table#1: TABLE#1 Single-Family Multi-Family Setback (ft) (ft) Front 20 16 Street Side 15 15 Side 5 5 Rear 20 20 Items that will be located in county right-of-way, which will be maintained by the HOA, are listed below. The recorded deed restrictions, illustrating maintenance responsibility by the HOA, will be provided prior to filing of any Final Plat document. ❖ All improvements behind the back of curb; ••• Storm Sewer System; ••• Retention/Detention Facilities; ❖ Green belts,pedestrian access ways, and other common areas; ••• Sidewalks; ❖ Street lights; ❖ Alleys; ❖ Cluster mailboxes and individual mailboxes. Individual mail boxes will only be located on local streets and not on collector streets; Thank you for your consideration in these matters. Sincerely, Todd Carnes Managing Partner Filename: CD1-202-0286-L01 Page-2 of 2 Page 1 of 1 Carol Cotter - Creek Meadows From: Carol Cotter To: RABON METCALF Date: 12/6/2006 10:56 AM Subject: Creek Meadows Rabon- Additional comments on construction documents. --Include BCS Unified Details. --Revise plans to show new street crossing Please call if you have any questions. Carol CO t \ J; -e r_ 5 3 r/) 7 ' i1111 I\n\C file://C:\Documents and Settings\ccotter.CSTX\Local Settings\Temp\XPgrpwise\4576A1CFCity o... 12/6/2006 Page 1 of 1 Jennifer Reeves - Fwd: Creek Meadows - Preliminary Plat From: Molly Hitchcock To: Bridgette George; Carol Cotter; jflo; Ken Fogle; Lance Simms; Lisa Lindgren Date: 11/16/2006 4:09 PM Subject: Fwd: Creek Meadows - Preliminary Plat >>> "Rabon A. Metcalf, P.E." <rmengineer@verizon.net> 11/16/06 4:07 PM >>> Molly, Per our phone discussion, Todd Carnes has authorized me to withdraw our agenda item for this evening's P&Z meeting. Do not hesitate to call should you have any questions. Rabon A. Metcalf, P.E. Rabon Metcalf Engineering P.O. Box 9253 College Station, TX 77842 Off: (979) 690-0329 Fx: (979) 690-0329 Mb: (979) 219-4174 file://C:\Documents and Settings\jreeves\Local Settings\Temp\GW}00001.HTM 11/16/2006