Loading...
HomeMy WebLinkAboutStaff Report z DESIGN REVIEW BOARD EEK pESIGN DISTRICT WOLF PEN SRA AFF REPORT ben 8 2007 ort Date: Novemvemb 15 2007 Schubert, Staff Planner Rep pate: be Meeting ect Manager: Jason Sch Projschupert@cstx g°v For SP1 E-mail:j TS AT WOLF PEN CREEK(Sp mouth St intersection THE LOFTS Dr and Dartm Location: 614 Holleman Drive East, SW corner of Holleman building elevations, and Ruiz, IPS Group a site plan, Standards and Applicant: Natalie R Off-Street Parking action and discussion °7 2 development consisting o possible Section -Stye meet Ordinance Creek, a mixed-use Creek District. Item: Presentation, Develop Wolf pen Wolf Pen appeals to Unified The Lofts at W East in the plan, landscape 7 6, Buffers for Holleman Drive E royal of the site construction Section located at 614 H ends app that the meet Staff recommends with the conditiosite by Develop g. a4 acres, are mendationsre requested app approved Recommendations.. ecom the q City Standards Administrator minimum building elevations,report meet at the southwest plan, drainage rep feet plans and n►ent locate 9 100 square axed-use development private Engineering• proposing a m with associated The applicant is p development ouch Street as a Dartmouth Street that consists °f approximately rough to Dartmouth Item Summary: an Drive and a 264-unit multi-family development extended th Holle corner u e and use and Manuel Drive is to e of retaillrestauraa king garage Ordinance except two and p Development has the clubhouse ro ect. of the Unified D Design Reviewparking lots a part of the project. and for which the requires that p s aces mets all technical standards ng and Access, contiguous Board P This site plan' m O Se is C Dimensions of seven requirement would mals that the applicant 7 2 a maximum w within app First, UDO shall have proposing a number public right-of-way The applicant feels that this authority to grant. and is 15-feet of a p e island. retail uses within an 18 by 2 urban style plaza in front of the separated by proposed urban style p as an alternative (see attached letter). arking lot which requires a 6- detract for the prop Buffer Standards,proposed multi-family of tree well areas within the p, 7 6 F Minimum the prop osed a buffer O Section buffer yard between wall multi-family mal is for Up10-foot planted The applicant initially retaining The second aapnd t and a le family homes• water line. foot wooden the adjacent sing engineering staff required the p be development and t width but eng nate maintenance re d letter).nearby moved et the 10 foo See at yard that m ro erty line to allow adequate in width the proposed buffer yard is only moved closer to that p minir As a result, is not within the The subject property Issueslltems for Review: required. 1. Treatment of thearea minimum reservation area: tion area so therefore not dedication was re reservation 6 2. Exterior lighting: The applicant is proposing to use light fixtures currently utilized by Parks and Recreation Department in the Wolf Pen Creek District. 3. Solid waste: The applicant is proposing to have trash collected by custodial staff, placed in a compactor in the parking garage and then into 4 or 5 yard rolling containers. On collection days, staff would roll the containers out for pick up by Sanitation. 4. Relationship of buildings to site: The retail uses face the intersection of Holleman Dr. and Dartmouth St. The parking garage is at the rear toward the western property line and multi- family buildings are located throughout the site with four-story buildings located on the main site with two-story townhome-style units located south of Manuel Dr. 5. Relationship of buildings and site to adjoining area: The site is designed to orient towards the intersection of Holleman Dr. and Dartmouth St., which is a focal point of the WPC District. Retail driveway access will be from Holleman Dr. while the multi-family access will be from Manuel Dr. New sidewalks will be constructed along Holleman Dr. and Manuel Dr. while the sidewalk along Dartmouth St will be replaced. 6. Building design: In general, the buildings are a combination of brick and stucco material with stone base accents. 7. Miscellaneous structures and street hardware: A pedestrian plaza area composed of pavers and anchored by a water feature is proposed at the Holleman Dr. and Dartmouth St. intersection. Pavers will also be placed at back of curb along Holleman Dr. and Dartmouth St. with tree wells spaced roughly every 32-feet. Proposed improvements in the right-of-way will require approval of a Private Improvement in a Public Right-of-Way (PIP) permit. 8. Landscaping: Landscaping is provided in accordance with the Unified Development Ordinance. Additional trees are proposed in the right-of-way of Holleman Drive and Dartmouth Street and will require approval of a PIP permit to be installed. 9. Signage: The applicant is still developing the sign package and intends to request consideration of the signage for the site at a later time. Item Background: The subject property received a Conditional Use Permit from the City Council on February 8th, which allows multi-family on the first floor with the condition that at least 9,000 square feet of retail/restaurant use be provided. This site plan is in compliance with the Concept Plan that was approved with the Conditional Use Permit at Council. The subject property received a 9-foot height variance from the Zoning Board of Adjustment on April 3rd. The request was necessary due to the height of the parking garage in relation to the adjacent single family lots along Crest Street. The building permit submitted for parking garage is within the height restrictions allowed through the variance. The subject property received an Administrative Adjustment on November 81h of 1.5 feet for the front setback along Dartmouth St. so that the proposed buildings meet setback requirements. Attachments: 1. Application 2. Appeal Request Letters 3. Site Plan 4. Building Elevations 5. Material samples (available at the meeting) DESIGN REVIEW BOARD WOLF PEN CREEK DESIGN DISTRICT STAFF REPORT Project Manager: Jason Schubert, AICP, Staff Planner Report Date: May 16, 2008 E-mail:jschubert@cstx.gov Meeting Date: May 23, 2008 For THE LOFTS AT WOLF PEN CREEK (SDSP) Location: 614 Holleman Drive East, SW corner of Holleman Dr and Dartmouth St intersection Applicant: Natalie Ruiz, IPS Group Item: Presentation, possible action and discussion on a revised site plan, landscape plan and building elevations for The Lofts at Wolf Pen Creek, a mixed-use development consisting of 8.34 acres, located at 614 Holleman Drive East in the Wolf Pen Creek District. Administrator Recommendations: Staff recommends approval of the site plan, landscape plan, and building elevations. Item Summary: The applicant is proposing revisions to this mixed-use development located at the southwest corner of Holleman Drive and Dartmouth Street. The project was considered by the Design Review Board on November 15, 2007 and received approval with the condition that the construction and other engineering documents be approved. As you recall, the project consists of approximately 9,000 square feet of retail/restaurant use and a 264-unit multi-family development with associated private clubhouse and parking garage. Manuel Drive is being extended through to Dartmouth Street as a part of the project. The site plan and landscape plan meet all technical standards of the Unified Development Ordinance. The applicant has provided a letter describing the revisions to the building elevations. Those items and the other site revisions are detailed below and are for the Design Review Board's consideration: Issues/Items for Review: 1. Relationship of buildings to site: The orientation of the buildings remain the same with retail uses facing the intersection of Holleman Dr. and Dartmouth St., the parking garage at the rear toward the western property line and multi-family buildings located throughout the site with four-story buildings located on the main site and with two-story townhome-style units located south of Manuel Dr. The retaining wall that bisected the main buildings of the site is now proposed north of Manuel Dr. with a 4-foot wrought iron fence on top of it. 2. Building design: In general, the buildings are a combination of brick, stucco, and fiber cement siding materials. The elevations for the main corner (Building 3) and the townhome- style units south of Manuel Dr. (Buildings 8 & 9) remain the same as previously considered. As described in the letter, the brick veneer on the remaining buildings has been replaced with stucco on the elevations facing Holleman Dr., Dartmouth St., and Manuel Dr. For the other elevations, the brick veneer and stucco has been replaced with fiber cement siding. In addition, the garage was originally steel construction with stucco panels on the exterior but is now proposed as concrete construction painted the stucco color. 3 3. Miscellaneous structures and street hardware: A pedestrian plaza area with a water feature is proposed at the Holleman Dr. and Dartmouth St. intersection. The plaza and commercial parking area along Holleman Dr. is now proposed with stamped and colored concrete instead of pavers. As a reminder, the additional improvements shown in the right-of-way are not required for the site plan but are shown for illustration and will require a Private Improvement in a Public Right-of-Way (PIP) permit to be installed. Item Background: The subject property received a Conditional Use Permit from the City Council on February 8, 2007, which allows multi-family on the first floor with the condition that at least 9,000 square feet of retail/restaurant use be provided. This site plan is in compliance with the Concept Plan that was approved with the Conditional Use Permit at Council. The subject property received a 9-foot height variance from the Zoning Board of Adjustment on April 3, 2007. The request was necessary due to the height of the parking garage in relation to the adjacent single family lots along Crest St. The building permit submitted for the parking garage is within the height restrictions allowed through the variance. The subject property received an Administrative Adjustment on November 8, 2007 of 1.5 feet for the front setback along Dartmouth St. so that the proposed buildings meet setback requirements. A waiver and an appeal were granted by the Design Review Board when this item was initially considered on November 15, 2007. A waiver to UDO Section 7.2.0 Dimensions and Access was granted to eliminate the requirement to have double landscape islands for the parking along Holleman Dr. so as not to detract from the proposed urban style plaza in front of the retail uses. An appeal to UDO Section 7.6.F Minimum Buffer Standards was granted to allow a 6-foot buffer yard width as an alternative to the required 10-foot width. The applicant had initially proposed a 10-foot buffer yard but engineering staff required the proposed retaining wall to be moved closer to that property line to allow adequate maintenance area for the nearby water line. Attachments: 1. Application 2. Applicant Letter Describing Revisions 3. Site Plan 4. Landscape Plan 5. Hardscape Plan 6. Building Elevations 7. Color and Material Samples (available at the meeting) 4 DESIGN REVIEW BOARD WOLF PEN CREEK DESIGN DISTRICT STAFF REPORT Project Manager: Jason Schubert, AICP, Staff Planner Report Date: July 24, 2008 E-mail:jschubert@cstx.gov Meeting Date: August 1, 2008 For THE LOFTS AT WOLF PEN CREEK (SDSP) Location: 614 Holleman Drive East, SW corner of Holleman Dr and Dartmouth St intersection Applicant: Natalie Ruiz, IPS Group Item: Presentation, possible action and discussion on colors and patterns for stamped and colored concrete and building materials for The Lofts at Wolf Pen Creek, a mixed-use development consisting of 8.34 acres, located at 614 Holleman Drive East in the Wolf Pen Creek District. Administrator Recommendations: Staff recommends approval of the proposed items. Item Summary: The applicant is providing the specific colors and patterns of the stamped and colored concrete as requested by the Design Review Board at the May 23rd meeting. The applicant is also proposing stainless steel materials for Building 3, the main building facing the intersection of Holleman Dr and Darthmouth St. As you recall, the project consists of approximately 9,000 square feet of retail/restaurant use and a 264-unit multi-family development with associated private clubhouse and parking garage. Manuel Dr is being extended through to Dartmouth St as a part of the project. The project was first considered by the DRB on November 15, 2007 and received approval with the condition that the construction be approved by engineering. Site and building revisions, as described in the Item Background below, were approved at the May 23rd DRB meeting with the requirement that the colors and patterns of the stamped and colored concrete be approved by the DRB. The proposed items are detailed below and are for the Design Review Board's consideration: Issues/Items for Review: 1. Building design: Stainless steel material is proposed on Building 3. The material was not available for the November 15th DRB meeting so the applicant proposed to bring it forward as part of the sign package at a future date. The material is no longer part of the sign package and is proposed as part of the building façade. The proposed stainless steel mesh serves as an accent directly above the retail glazing while the proposed stainless steel wire cloth serves as the guardrail for the balcony area above the retail uses. The stainless steel material is within the 20% material percentage maximum allowed for a façade by the Non- Residential Architecture Standards and therefore meets the technical standards of the Unified Development Ordinance. A color elevation of Building 3 is within your packet and the material samples will be available at the meeting. 2. Miscellaneous structures and street hardware: A pedestrian plaza area with a water feature is proposed near the Holleman Dr. and Dartmouth St. intersection. The hardscape 11 on the site including the plaza and commercial parking area along Holleman Dr was approved with stamped and colored concrete instead of pavers at the May 23rd DRB. The applicant is proposing the specific colors and patterns to be used. A color hardscape plan is within your packet and color samples sheets will be available at the meeting. Item Background: The subject property received a Conditional Use Permit from the City Council on February 8, 2007, which allows multi-family on the first floor with the condition that at least 9,000 square feet of retail/restaurant use be provided. The site plan complies with the Concept Plan that was approved with the Conditional Use Permit at Council. The subject property received a 9-foot height variance from the Zoning Board of Adjustment on April 3, 2007. The request was necessary due to the height of the parking garage in relation to the adjacent single family lots along Crest St. The subject property received an Administrative Adjustment on November 8, 2007 of 1.5 feet for the front setback along Dartmouth St. for the proposed buildings meet setback requirements. The DRB initially considered the project at the November 15, 2007 meeting. The site plan, landscape plan and building elevations were approved by DRB with the condition that the construction documents be finalized and approved by engineering. As part of the approval, a waiver and an appeal were granted by DRB and the sign package would come forward at a future meeting. The waiver to UDO Section 7.2.0 Dimensions and Access was granted to eliminate the requirement to have double landscape islands for the parking along Holleman Dr so as not to detract from the urban style plaza. The appeal to UDO Section 7.6.F Minimum Buffer Standards was granted to allow a 6-foot buffer yard width as an alternative to the required 10-foot width due to engineering staff requiring the retaining wall to be moved closer to that property line to allow adequate maintenance area for the nearby water line. To finalize the infrastructure, the applicant brought forward other site and building revisions to the DRB at the May 23, 2008 meeting. The building elevations were revised to add pitched roofs and change the brick, stucco, and siding material percentages of all buildings except for Buildings 3, 8, and 9 which were to remain the same. The parking garage changed from steel construction with stucco panels to concrete construction. The retaining wall in the center of the site was also moved to just north of Manual Dr and stamped and colored concrete was proposed to replace the brick pavers on the site. These revisions were approved by DRB with the condition that the specific colors and patterns of the stamped and colored concrete be approved by the DRB. The sign package will come forward for approval at a future time. Attachments: 1. Application 2. Elevations for Building 3 3. Landscape (hardscape) Plan 4. Color and Material Samples (available at the meeting) 12 THE LOFTS, WOLF PEN CREEK Design Review Board—Site Plan Application Requested Waiver—Parking Lot Standards UDO Requirement: According to Section 7.2.C.7 of the UDO, double landscaped islands are required along the retail parking area parallel to Holleman Drive because the parking row is within 15' of the right-of-way. The parking lot is currently setback 13.65' from the right-of-way. If the parking lot was shifted back approximately 1.35', double islands would not be required, a variance would not be necessary. Intent of Regulation: The intent of the UDO regulation was to minimize the impact of the parking lot from the street. If parking lots were placed closer to the street than 15', double islands are required to help soften the impact of the parking lot. Requested Waiver: Allow the parking row to remain approximately 13.65' from the right-of- way and allow the tree wells to meet the intent of the double island requirement. Background: The Lofts is a luxury student housing development with first floor retail space anchored in the heart of Wolf Pen Creek. The overall vision for this development is very urban with the focus on outdoor plaza space and building architecture versus suburban parking lots. Ideally,parking lots would not be visible from the intersection. However, in order for the first floor retail businesses to be successful, parking must be readily available. The challenge to our landscape architect is to design a parking lot that does not detract from the urban, pedestrian- friendly environment. Our landscape architect has developed an inviting, walkable and prominent sense of place within the outdoor plaza area. To minimize the impact of the retail parking lot, he has continued the use of pavers and tree wells throughout the lot so that it blends with the plaza. Similar designs have been successful in more urban areas such as Dallas. Due to the unique design, a waiver to the current parking standards is necessary because the City's current code was written for typical suburban parking lots. Justification: The following elements justify the request: • The pedestrian area between the parking lot and the retail businesses is very limited. If the waiver is not granted, the entire parking lot must be shifted toward the main building removing critical pedestrian space and potentially forcing pedestrians into the parking lot. • The typical circulation aisle between parking rows is 23' in width. Due to the size of the building,the Fire Department requires a 26' circulation aisle for their ladder truck resulting in a wider parking lot than originally proposed. • The at grade tree wells are placed approximately every 4 spaces along the exterior parking row in addition to the parking row next to the building. The number and location of tree wells, coupled with the unique parking surface of pavers, minimizes the impact of the parking lot from the street and meets the intent of the UDO requirement. Natalie Ruiz,AICP, IPS GroupifforAdo Group November 8,2007 r+�.. ri4r,r: , ,,.,r:. 10 THE LOFTS, WOLF PEN CREEK Design Review Board—Site Plan Application Requested Waiver—Buffer Yard Requirementsds UDO Requirement: According to Section 7.6.E of the UDO,regarding the placement of "structures"within a buffer yard area. Staff has determined that the proposed retaining wall is a"structure"and is not permitted within the buffer yard area. Intent of Regulation: The intent of the UDO regulation was to provide an adequate buffer between different land uses to minimize the impact of the developing use. Requested Waiver: Allow the proposed retaining wall to be located within 6' of the rear property line within the 10' buffer area. Justification: The following elements justify the request: • The original site plan submittal met the buffer yard requirements and showed the retaining wall approximately 10' from the rear property line. However,at the request of the Engineering Department,we shifted the location of the retaining wall to provide adequate area to maintain utility lines in the area. • The proposed buffer yard measured from the property line to the parking area is approximately 18' in width. • The required fence and plantings will be installed along the rear of the single family homes at their current elevation. Our landscape architect has selected plant materials specifically for this location and he has determined that 6' of planting space is more than adequate. Background: Our original design incorporated the entire 10' buffer area. However,the City's Engineering Department requested that we move the wall so that maintenance of utilities in this area will be much easier and safer. In addition to the 10' buffer yard,there are additional neighborhood protection standards within the UDO that combine to ensure that incompatible. The height of the garage is limited based on the height of the adjacent single family homes along Crest. The 6' buffer area between the wall and the property line will contain the required privacy fence and plantings. The total buffer yard overall distance from the property line to the parking lot exceeds the minimum of 10'. rui3rouPe Rz,IPS r111,4010 ty Group mber 8,2007 t' 11