HomeMy WebLinkAboutStaff Report 2/19/2010
Tonight's Meeting
❑ How we got here
o What is a Preservation Study
o What is the Process for the Study
o What is a Designation Report
o What are Preservation Standards
❑ What is a Preservation Overlay
OAKWOOD
PRESERVATION STUDY
December 15,2009
How we got here Preservation Study
o Grassroots movement o Examination of the historic integrity of a place or
o Enabling Ordinance area
o Historic Resource Survey o Evaluates the age,style,and history of structures
o Comprehensive Plan ❑Outlines the types of requirements that would assist
in preserving the historic integrity
o City Council direction
o Designation Report
o Preservation Standards
Preservation Study Process Preservation Study Process
❑ Council direction ❑ September 2009—Initial Meeting with
o Spring 2009—Contract was executed neighborhood
o Historic Research 0 Results of the research
o Designation Report
o Preservation Standards t7 Began discussions of how preservation standards could
be drafted based on the research of the study area
o Training
o Summer 2009-Consultant began research on properties o November 2009—Second meeting with
a Building permit data neighborhood
o Windshield survey D Provided information about standards that could be
a Carnegie Library used to protect and preserve contributing structures
o Fire insurance Maps
1
2/19/2010
Preservation Study Process Designation Report
o Next Steps: o Catalogs the historical,cultural,and architectural
significance of a place or area
▪Meet with neighborhood to discuss standards for non-
contributing structures,additions,and new construction o Lists the architectural,archaeological,paleontological,
cultural,economic,social,ethnic,political,or historical
a Develop list of required items for historic preservation characteristics of a place or area
D Get feedback on non-required items for historic D Describes the historical,cultural,and architectural
preservation significance of the structures and sites
a Provide draft Preservation Standards 0 Identifies contributing and non-contributing resources
a Complete study D Describes the boundaries of the study
0 Determine the period of significance
Preservation Standards
o Recommendations
Contributing and Non-contributing o Guide to how to protect a historic place or area.
o Help to identify the different requirements that
could be put in place to guide exterior construction
activity in a historic place or area in order to
protect the historic importance of the structure
o Non-regulatory as part of the STUDY
What happens after a study is complete?
o Provide the documentation to the property owners Historic Preservation Overlay
in the area and the community
o Recommendations of the Preservation Study can be
adopted through a Historic Preservation Overlay
Rezoning
2
2/19/2010
Historic Preservation Overlay What is required to rezone my property
o Type of zoning district that can be placed over a o An Historic Preservation Overlay rezoning application
property to promote historic preservation completed in full
o An inventory and survey of structures to be included in the
o Places additional standards for exterior construction on rezoning
a structure and site o A current photograph of each property and its
o Standards based on the Preservation Standards or the improvements
Secretary of Interior's Standards for Rehabilitation a A designation report
IDRequires review by Historic Preservation Officer and to 0 Signatures of the property owners
the Landmark Commission o If there is an historic place or area that cannot obtain
the signatures of all of the property owners in an
o Demolition delay historic area,the City Council may be petitioned to
o Penalties for demolition by neglect initiate the rezoning on an area
What is the process to rezone? What is the impact?
o Application or Council Initiation o Ordinary Maintenance
o Review by Staff a No review
o Notice to property owners o Routine Maintenance
o Public Hearings a Review by Historic Preservation Officer
o Can be forwarded to Landmark Commission
o Landmark Commission
a Planning and Zoning Commission o Major renovations
o City Council o Review by Landmark Commission
o Demolition Delay
What is the status of the rezoning
o Currently not processing Ikramer@cstx.gov
o Need following information: Av
o Current photographs of properties 979-764-3570
a Completed Designation Report
o Signatures of property owners
o Preservation Standards
o Boundary of rezoning
3
2/19/2010
, .,;://,' �\ /
/4/. 1\/
.i ,-r / '
'/ r \ ' Y f 1 .
i? "< '
4
Other -�-
0 Exterior Lighting
W z Color -�- ® '
c, Style ---
W
< > Accessory Structures -®-
°
41`( (3 Windows & Doors
mPrimary Materials< U
Z Q
J Porches & Stoops ---
DForm
---'
LU
F. 0 U ewa s
Driv y -�-
0 Landscape &Walkways ---
oc =
Site Feature Protection
UMaterial Protection � a
z
Protection from Demo.0 I ,
lime U
Fencing
I- (.9 z Building Materials ' '
4tt LU C) , ..
oC Off Street Parking � s
Landscape Maint.
CSC W I-- ,
LLJTree Preservation
I--- Ce
Garage Location
LU ,�
o
o
L9V Max. Lot Coverage ' �
Cl"" Z m Building Height rIrlapolim ,, 4 _..
ao
H 0
Min. Lot Size
L) LLJ
Z Min.Side SetbackLU LU #' oN
- '
Max, Front SetbackMM o
W �� N
air^ r ��
O oMin.Front Setback '
, i 2Z Mc'
ce (.9 tv„, ›. ..,
/� d —CI
0... • O T. O E
N C t,/ ♦i N y H 3 v
m N Z Z i s O 6 o
0v)