Loading...
HomeMy WebLinkAboutCorrespondence 10/19/06 16:28 FAX 979 776 2383 LAWYERS TITLE fj001 LAWYERS TITLE COMPANY OF BRAZOS COUNTY 1673 BRIARCREST DRIVE,SUITE 104B BRYAN,TEXAS 77802 PH: (979)779-1221 FAX:(979)776-2383 E-Mail: tins@ltc-bc.com FAX TRANSMITTAL DATE: Thursday, October 19,2006 TO: KEVIN FAX NO: 776-3805 FROM: TINA LONG LAWYERS TITLE COMPANY OF BRAZOS COUNTY 1673 BRIARCREST,SUITE 104E BRYAN,TEXAS 77802 FAX LINE: (979)776-2383 RE: OUR FILE NO: S28659 SELLER: Crescent Pointe,Ltd.,a Texas limited partnership BORROWER: Birdcat Partnership,LP LEGAL: CRESCENT POINTE #2, Block 2, Lot 5, 2.40 ACRES, Brazos County Property Address: Crescent Pointe Parkway,Bryan, TX 77802 PAGE 1 OF 5 MESSAGE: Warranty Deed with Vendor's Lien recorded in Volume 7525, Page 174 Jason Schubert- Re: Calling for CO for 1604 Crescent Point Pkwy(Capsher Tech) 1 Y{7Ti . J i;, tom. `'':1 �t- .,7 7 -- From: Jason Schubert To: Boyer, Lindsay; Boykin, James; Carer, Julie; ... Date: 1/2/2008 5:41:36 pm Subject: Re: Calling for CO for 1604 Crescent Point Pkwy (Capsher Tech) No for CO. The following items need to be completed: 1) Provide handicap sign and paint handicap spot and striping for 3rd handicap spot near the end of the parking lot. 2) Remove job trailer from fire lane and site. 3) Remove roll-off dumpster and port-o-potty from site. 4) Establish ground cover in all areas disturbed by construction activity. 5) Remove construction signs. 6) Remove construction material and debris from site. 7) Clean front sidewalk and street of dirt and debris. Jason Schubert Staff Planner Planning&Development Services City of College Station Phone: 979.764.3570 Fax: 979.764.3496 >>>Amber Carter 12/26/2007 12:53:41 pm >>> bp 06-3090 Any issues? Contact: Ja Cody Inc @ 774-5613 Thanks! TRANSMISSION VERIFICATION REPORT TIME : 01/02/2008 17: 53 NAME : FAX TEL SER.# : 000L5J596800 DATE,TIME 01/02 17:52 FAX NO./NAME 97745693 DURATION 00:00:19 PAGE(S) 01 RESULT OK MODE STANDARD ECM Jason Schubert Rs: Calling far COfor,1604 Crescent Point P CapsherTech) ,IN' � ) a Cody P = -77Y- 545'3 From: Jason Schubert To: Bayer, Lindsay; Boykin,James; Caler, Julie; ... Date: 1/2/2008,5:41:36 pm Subject: Re: Calling for CO for 1604 Crescent Point Pkwy(Capsh:Tech) —.... No-fol-CO,-the following.-items-need ta-be.completed.:--.-.... — . 1) Provide handicap sign and paint handicap spot and striping for 3rd handicap spot near the end of the parking lot. 2) Remove job trailer from fire lane and site. 3) Remove roll-off dumpster and port-o-potty from site. 4) Establish ground cover in all areas disturbed by construction activity. 5) Remove construction signs. 6) Remove construction material and debris from site. 7) Clean front sidewalk and street of dirt and debris. Jason Schubert Staff Planner Planning&Development Services City of College Station Phone:979.764.3570 Fax: 979.7643496 >>>Amber Carter 12/26/2007 12:53:41 pm»a bp 06-3090 Any issues? Contact: Ja Cody Inc ig 774-5613 Thanks! L° GAys-rio'cTst ,- : :u/'is / L >cyd •L c:mie Sreis6,1-N,6. k Lu L 6FF t, tJ-:=7"/ c,—F74,.14 � •dr) 0 10 Novembei 2006 qte467 IPlanning and Development Services 0 • The City of College Station 1101 Texas Avenue J College Station,TX 77840 Re: Capsher Technology Dear Staff, This letter is in response to the staff review comments dated October 30, 2006 STUDIO PLANNING INCORPORATED 1. As discussed in our meeting on Tuesday October 31 at 2:00, the portion of the 511 College'versity Drive Station, Texas 778240 Suite building facing the ROW has two design elements for every 45 feet of distance. Phone 979/260-2635 Fax 979/846-8224 Enclosed are the drawings presented at our meeting. www.arkitea.com ENGINEERING 1. The standard trench detail shown on drawing W1 (C4) will be used at the public lines. The trench detail shown on C5 will be used for the public lines. 2. Engineers estimate for the public water main is enclosed. 3. The double check valve and vault have been eliminated from the project. The isolation valve with the lockable lid is still included in the project. 4. Drawing Cl has been updated to locate the vault out of the PUE(now eliminated) 5. Sheet C4 is also Sheet W1 6. Understood. The following information is enclosed: • Seven complete sets of the revised construction documents (site construction drawings Cl, C2, C3, W1 (C4), C5, A1.2, A1.2, A1.3, MEP1) • Two copies of the revised site plan (drawings Cl, C2, A1.1, A1.3) • One copy of the landscape plan (A1.2) • One copy of the grading and erosion plan C2 (11x17) • Drawings from meeting (partial drawing of site and 3D model of building) Should you have any questions or require additional information, please feel free to contact me. Sincerely, Mike Record, AIA Associate Principal CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 30,2006 TO: Michael S. Record,The Arkitex Studio,Inc. FROM: Grant Wencel, Staff Planner SUBJECT: CAPSHER TECHNOLOGY(SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan OR One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 764-3570. Attachments: Staff review comments cc: Case file#06-00500217 Home of Texas A&M University LETTER OF TRANSMITTAL TO: City of College Station Site Plan Application FROM: Mike Record DATE: 9 October 2006 PROJECT: Capsher Technology PROJECT NO: 0604 The following items are hereby transmitted for your usage, review and/or action as noted. 111, the The following information is enclosed for the site plan review. ar ex Site Plan Application STUD IC)k,,,, c,„„;-,„i„;:„ application,Check in the amount of$1,000 for development, and infrastructure fees. CEDP 511 University Drive East Suite 201 Drainage report College Station, Texas 77840 Phone 979/260.2635 Fire Flow Report Fax 979/846-8224 www.arkltea.com 12 bound copies of the following drawings for site plan: Cl -Civil Grading Plan C2-Civil Utility Plan A1.1 -Site improvement plan 1 bound set of site construction documents: Cl -Civil Grading Plan C2 Civil Utility Plan C3 C4 C5 A1.1 -Site Improvement Plan A1.2-Landscape Plan A1.3 -Site improvement and Landscape details MEP-1 Mechanical Electrical site plan I loose copy of A1.2-Landscape plan 1 loose copy of A3.1 -Building elevations (has percentage of material listed) 1 exterior material color board Should you have any questions, please feel free to contact me. Sincerely, .7-1447 Michael S. Record,AIA Associate Principal CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 16,2006 TO: Michael S.Record,The Arkitex Studio, Inc. FROM: Grant Wencel SUBJECT: CAPSHER TECHNOLOGY(SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Case file#06-00500217 Home of Texas A&M University