HomeMy WebLinkAboutCorrespondence LETTER OF TRANSMITTAL
Adams
ENGINEERING DATE: 9-28-2006 I JOB NO: 2006.219
ATTN: Jennifer Prochazka
Engineers•Planners■ Landscape Architects•Scientists RE: Sam's Club Canopy Addition
500 Nolen Drive,Suite 550❑Southlake,Texas 76092
(817)329-6990 FAX(817)329-7671
CC:
TO: City of College Station- Planning Dept
1101 Texas Avenue
College Station TX 77842
•
PHONE: 979-764-3570
WE ARE SENDING YOU ❑ATTACHED ['UNDER SEPARATE COVER VIA:
❑Blueline Prints ❑Blackline Prints ❑Reproducible Plans ❑Specifications ❑Copy of Letter
Change Order ❑Diskette(s) ['Shop Drawings ❑Bid Documents ❑Invoice
Samples ❑As-builts ❑Punchlist ['Other
COPIES DESCRIPTION
12 Folded Copies of Site Plan
1 Check#4215 for$200.00
1 Site Plan Application
THESE ARE TRANSMITTED as checked below:
❑For Approval ['For your use EAs requested by:
or Review&Comment EFor Bidding ❑Return ASAP to:
❑Revise&Resubmit ['Rejected ❑Approved as Noted
REMARKS:
DELIVERED VIA: ❑U.S. Mail ❑Std Overnight ❑Priority Overnight ❑Hand Delivery ['Pick-up ❑Other
FROM: _4K--
1-a.
Corporate Office: Tyler, Texas Branch Offices: Southlake, Texas•Garland, Texas•San Diego, California
I '
(1*. '1144
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
TO: Travis Pruitt,Harrison French fax: 479-273-9436
FROM: Grant Wencel,Staff Planner
SUBJECT: SAM'S CLUB REMODEL (SP)
Staff reviewed the above-mentioned site plans/building plans as requested. The following page is a list of
staff review comments detailing items that need to be addressed. Please address the comments and submit
the following information for further staff review:
Two (2) revised site plans / building plans addressing modifications.
If there are comments that you are not addressing with the revised site plan,please attach a letter explaining
the details. If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Lee Morris,Applicant via fax # 817-329-7671
Case file# 06-00500210
Home of Texas A&M University
(*ff'111111
CITY OF COLLEGE STATION
Planning d Deae[opmeni Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 27,2006
TO: Lee Morris,Applicant via fax# 817-329-7671
FROM: Crissy Hart and Grant Wencel,Staff Planners
SUBJECT: SAM'S CLUB CANOPY ADDITION (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review
comments detailing items that need to be addressed. Please address the comments and submit the following
information for further staff review:
Seven (7) complete sets of construction documents for the proposed development with the
revised site and landscaping plans attached (one set will be returned to you, please submit
additional copies if you want more than one approved set)
Two (2) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
OR
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan,please attach a letter explaining
the details. If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc:
Case file#06-00500210
Home of Texas A&M University
LGrant Wencel -6338 SITE PLAN RESPO"'SE LETTER.pdf 1
•
Adams10410ENGINEERING
CIVIL • ENVI RONMENTAL ENGINEERS
November 20,2006
Crissy Hart and Grant Wencel
Staff Planners
City of College Station
Planning and Development Services
979-764-3570
RE: Vestibule Addition
Sam's aub#6338
1405 Earl Rudder Freeway, College Station,D(77840 Case File#06-00500210
Dear Ms. Hart and Mr.Wencel:
Please allow this letter to serve as a response to your review comments regarding the site plan for the above mentioned expansion:
Planning
Comment #1: Non-residential architectural standards will apply to this façade. Please see section 7.9.B2.and 7.9.E.1 of the UDO for
more information. You will see that a canopy and wall plane projection will count as architectural elements. Please indude additional
elements to completely fulfill the architectural element and roofline articulation requirements.
Refer to sheet A2
• Drawings have been revised to indicate addkbnal buildi ng elements to comply wkh the Non-Residential Budding
standards.
Comment #2: Please provide building elevations, and material and color samples of the changes to the front façade.
Refer to Sheet A2
• Budding Elevatbns have been provided with material and cobr schedule. Samples to be provided wkh full budding
pemk set.
Comment #3: Please provide 9 tree wells with canopy trees along the front façade of the building as required per Section 7.9.E.3.b of
the UDO. Please adjust the site plan accordingly.
• Per a phone conversation will Crissy Hart on November 10thAdams Engineering discussed the issues bebw wkh
regards to instaAhg the 9 canopy trees abng the front façade of the budding. Mrs. Hart advised Adams Engineering
to submk revised plans abng wkh this latter identiyhg the fokuwing encumbrances:
1) The area between the canopy drive thru and the edge of budding where the trees are being requested s
approxinatey 100 feet h length. This areas filad wkh several unities hckiding a water meter,water Erre,
grease trap,sankary sewer claanouts, sankary sewer service Me,and underground telephone conduk.
2) h addkion to the utilities mentioned bebw there is a SAMS CLUB sign located 12'above finished grade
(approxinatey 24'from the West bldg corner) that the 9 canopy trees would have to avoid for vbbiiy purposes.
3) For purposes of tree growth and foundatbn purposes the trees must be list aked at hast 5 feet from the face of
budding.
Asa resuk of the kerns listed above Adams Engineering feeb the hstakatbn of the 9 canopy trees abng the façade
of the budding snot a practical option;however we are open tosuggestbns.
Grant Wencel -6338 SITE PLAN RESPONQE LETTER.pdf 2
Comment #4: Provide a general note on the plan that all roof and ground-mounted mechanical equipment shall be screened from view
or isolated so as not to be visible from any public right-of-way or residential district within 150'of the subject lot,measured from a point
five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance.
• Per a conversatbn between Grant Wencel and Travis Pruk (archlect) I was noted that the existing roof and ground
mounted equipment are not currently screened.Therefore, screening of the exstng equipment wil not be required;
however all new equipment shag not be vspble to the general pubic at the front of the budding.
Comment #5: The original site plan shows trees planted in most of the existing parking islands. Many of these trees do not exist
presently. Tree replacement in many of these islands would improve the esthetics of the large parking area,and is recommended.
• Per a conversation wdh Crssy Hart the comment was addressed wdh the proposed installation of the (8)Tam
Junipers and the(4)Bradford Pears shown on the site plan.
ENGNEERNG COMMENTS NO.2
Corn-hent #1: Please subrr>it development permit application and fees. The development permit fee in this case will be$800 due to
the fire hydrant relocation.
• The development pemnl application and required fees are included wlh this submdtaL
Comment #2: It appears when the Sam's was originally built a blanket easement was dedicated to cover all proposed utilities. Please
dedicate the appropriate easement for all existing utilities on the site. The easement dedicated application may be found on-line.
• The surveyors in the process of prep aring the legal descriptions for the propo sed water ine easements. I is Adams
Engineering's understanding that these water ine easements must be fled pro r to completion of construction and
will not hold up release of the buiding perml.
Comment #3: Please include BCS Unified Construction Details and a note making reference to these details on the site plan.
• A note has been provided on the ske plan referencing the BCS Unified Construction Details. These details have also
been ncluded n the chi construction documents.
Comment #4: It appears that the existing on-site water system is public(needs easement) and the existing on-site sanitary sewer
system is private (no easement needed)please verify.
• Correct. As stated in engleering comment#2...easements are currently being prepared for the water line.
Comment #5: Please illustrate existing and proposed sanitary sewer service lines. 8-in sanitary sewer service lines require a clean-out
every 100-ft and a.5%slope. Profile detail is not required.
• Existing and proposed saniary sewer hies are shown on the sle plan as wel as the construction documents.
According to the as-buil utility plan provided by the city,the existing sandary sewer hie was installed at 0A0%
slope. The actual slope of the existing SS hie is currently unknown and will be verified by the contractor in the field.
Due to the relocation of the line to avoid the canopy columns the 8"SS hie wM likely be sloped at approximately
035%.
Comment #6: Please submit an engineer's cost estimate for public infrastructure improvements.
• An OPC for the relocation of the FH is included wdh the submdtaL
LGrant Wencel -6338 SITE PLAN RESPOtoes LETTER.pdf 3
We trust these revisions have adequately addressed any civil and planning-related concerns you may have regarding this project. If
you have any questions, please don't hesitate to call. Thank you.
Respectfully Submitted,
ADAMS CONSULTNG ENGINEERS, NC.
Lee Morris, P.E.
Project Manager
CITY OF COLLEGE STATION
Planning d Development Service
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 6, 2006
TO: Lee Morris,Applicant via fax# 817.329.7671
FROM: Crissy Hart and Grant Wencel, Staff Planners
SUBJECT: SAM'S CLUB CANOPY ADDITION (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review
comments detailing items that need to be addressed. The next submittal will be the third and final review by
staff for this round of reviews. If all items have not been addressed on the next submittal, another $200
processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the
comments and submit the following information for further staff review:
Seven (7) complete sets of construction documents for the proposed development with the
revised site and landscaping plans attached (one set will be returned to you, please submit
additional copies if you want more than one approved set)
Two (2) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
OR
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan,please attach a letter explaining
the details. If you have any questions or need additional information,please call me at 764-3570.
Attachments: Staff review comments
cc: Sams Club East#6338, 1301 SE 10th Street,Bentonville,AR 72716
Harrison French Architecture, 809 Southwest A, Suite 201,Bentonville,AR 72716
Case file #06-00500210
Home of Texas A&M University
11111
tldf
lot CITY OF COLLEGE STATION ry '
u Planning d Development Services q
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
MEMORANDUM
October 6, 2006
TO: Lee Morris, Applicant via fax#817.329.7671
FROM: Crissy Hartl and Grant Wencel, Staff Planner
SUBJECT: SAM'S CLUB CANOPY ADDITION (SP)-Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
One (1) revised site and landscaping plan.
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and necessary documents are required prior to the
issuance of a building permit. If there are comments that you are not addressing with the revised site
plan, please attach a letter explaining the details. If you have any questions or need additional
information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Sams Club East#6338, 1301 SE 10th Street, Bentonville, AR 72716
Harrison French Architecture, 809 Southwest A, Suite 201, Bentonville, AR 72716
Case file#06-00500210
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review. P.
LETTER OF TRANSMITTAL
Adams
ENGINEERING DATE: 10-26-2006 I JOB NO: 2006.219
ATTN: Grant Wencel
Engineers• Planners• Landscape Architects•Scientists RE: Sam's Club#6338 Canopy Addition
500 Nolen Drive, Suite 550❑Southlake,Texas 76092 Site Plan Resubmittal
(817)329-6990 FAX(817) 329-7671
CC:
TO: Grant Wencel
City of College Station-Planning Dept
1101 Texas Avenue
College Station, TX 77842
PHONE: 979-764-3570
WE ARE SENDING YOU ®ATTACHED EUNDER SEPARATE COVER VIA:
❑Blueline Prints ®Blackline Prints ❑Reproducible Plans Specifications ❑Copy of Letter
❑Change Order ❑Diskette(s) ['Shop Drawings ❑Bid Documents ['Invoice
❑Samples ❑As-builts ❑Punchlist ❑Other
COPIES DESCRIPTION
1 Site Plan Resubmittal
THESE ARE TRANSMITTED as checked below:
['For Approval ['For your use ❑As requested by:
®For Review&Comment ❑For Bidding ['Return ASAP to:
❑Revise&Resubmit Rejected [Approved as Noted
REMARKS: Grant, attached is the resubmittal of our site plan for the Sam's Club#6338 canopy addition. Landscaping
comments have been addressed on the site plan. Thanks and have a good day.
r4
DELIVERED VIA: ❑U.S. Mail ®Std Overnight ❑Priority Overnight ['Hand Delivery ❑Pick-up ❑Other
�1 1 Ja
FROM: 4 S t-UPJ / '-‘ 71:
Corporate Office: Tyler, Texas Branch Offices: Southlake, Texas•Garland, Texas•San Diego, California ` 0