HomeMy WebLinkAboutStaff Review Staff Review Comments—No. 1
Bradley Estates—06-00500209
PLANNING
1. Please be advised that this preliminary plat will require a block length variance. The
maximum block length for a rural residential development is 1500'. Please provide the
appropriate documentation.
2. Please be aware that White Creek Road may need to be improved to a paved standard.
Please see Gary Arnold with Brazos County for more information.
3. Neither the County nor BTU has made comments regarding this project. Please be
aware that County or BTU comments may result in further comments from the City.
Reviewed by: Crissy Hard and Grant Wencel Date: October 9, 2006
BRAZOS COUNTY
1. Please allow more time for the County review comments.
Reviewed by: Gary Arnold Date: October 9, 2006
ENGINEERING COMMENTS NO. 1
1. Proof of fire flow will be required in order to Final Plat.
2. Determine Base Flood Elevation.
3. Provide Finished Floor Elevations on all Lots.
4. A 20'PUE is required on all interior lot lines and against unplatted property.
5. Provide necessary drainage easements along major drainage ways.
6. A 16' PUE is allowed along the ROW as long as there is at least a 16' PUE on the other
side of the street; otherwise, a 20' PUE is required. Is there a 16' PUE on the east side
of Whites Creek?
7. Provide volume and page numbers of all existing PUEs and drainage easements.
Reviewed by: Carol Cotter Date: October 5, 2006
GENERAL ELECTRICAL COMMENTS
1. No Comments, Outside CSU electric territory.
2. To discuss any of the above electrical comments, please contact Tony Michalsky at
979.764.3438 .
Reviewed by: Tony Michalsky Date: 10-3-06