HomeMy WebLinkAboutCorrespondence P Pledger Kalkomey, Inc. 7020 Coyote Run
g Bryan,Texas 77808
979-731-8000, 979-731-1500(Fax)
K Consulting Engineers www.pkengineeiing.com
September 18, 2006
Ms . Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Site Plan 1
Curry Plumbing
PK Job No. 43306-291
Dear Mrs . George,
Enclosed please find the following for the referenced project :
• Site Plan Application including all of the Minimum
Submittal Requirements and a check in the amount of
$1000 .
• Fire Flow Report dated today.
Very Truly Yours,
Steve E. Duncan, P. E.
sed@pkengineering.corn
SED/j er
Enclosures
cc: Leon Williamson
Brenham • Bryan • Rosenberg
\\Snapl 21731\sharel\2006\43306-291 WILLIAMSON-Curry Plumbing\CS-Ol-site plan I doc
CITY OF COLLEGE STATION
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 25,2006
TO: Steve Duncan,via e-mail
FROM: Lindsay Boyer and Jason Schubert
SUBJECT: CURRY PLUMBING (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review
comments detailing items that need to be addressed. Please address the comments and submit the following
information for further staff review:
One (1) complete set of construction documents for the proposed development with the
revised site and landscaping plans attached
Easement Dedication Sheet and required documents (please allow 4 weeks to process).
Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance
of a building permit. If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional information, please call me
at 979.764.3570.
Attachments: Staff review comments
cc: Freddie Curry,via US Mail
Case file#06-00500206
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and`bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. Page 1 of 3
1JLO1
P Pled er KalkomeYInc 7020 Coyote Run
g � Bryan, Texas 77808 g.foq
979-731-8000,979-731-1500(Fa
K Consulting Engineers www.pkengineering.com
OL, .1
January 16, 2007
Ms . Lindsay Boyer
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re : Site Plan 2
Curry Plumbing
PK Job No. 43306-291
Dear Ms . Boyer,
Enclosed please find the following:
• One (1) revised set of drawings
• Two (2) Drainage & Detention Reports
An Easement Dedication Sheet will be submitted separately.
The following items are addressed:
PLANNING (Lindsay Boyer/Jason Schubert)
1 . Added
2 . Added
3 . Added
4 . Added
5 . Added, the back area has also been paved.
6. A chain link and wooden fence will both be installed
7 . Added
8 . Bicycle parking has been removed
9. Islands have been adjusted for 180 sf min
10 . Added
11 . The aisle was widened
12 . Added
LANDSCAPING/STREETSCAPING/BUFFER (Lindsay Boyer/Jason Schubert)
1 . Added
2 . Wooden fence added with double buffer, plantings were
not doubled.
3 . Added
4 . Added
5 . Changed
6. Added
Brenham • Bryan • Rosenberg
S:\2006\43306-291 Williamson-Curry Plumbing\CS-02-site plan 2.doc
Ms. Boyer
January 16, 2007
Page 2
7 . Added
8 . Note on Site Plan
9. Note on Site Plan
ENGINEERING (Josh Norton)
1 . Added
2 . Added
3 . A new hydrant is still shown, but in a revised
location
4 . Changed
5 . Added
6. Added
7 . Enclosed
8 . Storm sewer thru the PUE has been added. The
detention pond has been re-designed.
9. Added
10 . Added
GENERAL ELECTRICAL (Sam Weido)
1-7 OK
FIRE (Steve Smith)
1 . OK
2 . Added
3 . OK
4 . Added
ADDITIONAL CHANGES:
a. None
Very Truly Yours,
Steve E. uncan, P. E.
sed@pkengineering.com
SED/jer
Enclosure
cc: Leon Williamson
(14.
CITY OF COLLEGE STATION
Planning c3'Development Services
1101 Texas Avenue, P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
January 22, 2007
TO: Steve Duncan,Pledger Kalkomey,Inc.,via email sed diipkengineering.com
FROM: Jason Schubert,Staff Planner
SUBJECT: CURRY PLUMBING(SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review
comments detailing items that need to be addressed. The next submittal will be the third and final review by
staff for this round of reviews. If all items have not been addressed on the next submittal, another $200
processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the
comments and submit the following information for further staff review:
One (1) complete set of construction documents for the proposed development with the
revised site and landscaping plans attached
If there are comments that you are not addressing with the revised site plan,please attach a letter explaining
the details. If you have any questions or need additional information,please call me at 764-3570.
Attachments: Staff review comments
cc: Case file#06-00500206
CITY OF COLLEGE Si i ION
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
February 1,2007
TO: Steve Duncan,Pledger Kalkomey,Inc.,via email sedgpkengineering.com
FROM: Jason Schubert,Staff Planner
SUBJECT: CURRY PLUMBING (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. It appears that all staff review comments have
been addressed. As a reminder, this site is located within Graham Road sanitary sewer impact fee area 92-01,
which is $232.04 per Land Use Equivalent (LUE). A 1-1/2 inch water meter for non-residential structures is
equivalent to 5 LUEs. The impact fee will be due at the time of building permit. Please submit the following
information for further staff review and approval:
Seven (7) complete sets of construction documents for the proposed development with the
revised site and landscaping plans attached (one set will be returned to you, please submit
additional copies if you want more than one approved set)
Two (2) revised site
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan,please attach a letter explaining
the details. If you have any questions or need additional information,please call me at 979.764.3570.
cc: /Freddy Curry,via fax 690.2270
Case file#06-00500206
P Pledger Kalkomey, Inc. 7020 Coyote Run
Bryan,Texas 77808
979-731-8000,979-731-1500(Fax)
K Consulting Engineers www.pkengineenng.com
February 8, 2007
Mr. Jason Schubert
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Site Plan
Curry Plumbing
PK Job No. 43306-291
Dear Mr. Schubert,
In response to your Memorandum of February 1, 2007, enclosed
please find the following:
1 . Seven (7) complete sets of construction documents for the
proposed development with the revised site and landscaping
plans attached.
2 . One (1) Original and two (2) copies to be stamped and
returned.
3 . Two (2) revised site plans
4 . One (1) landscaping plan
5 . One (1) 11x17 grading and erosion control plan
Very Truly Yours,
P5F -
Steve E. Duncan, P. E.
sed@pkengineering.com
SED/j er
Enclosures
Vta (°1r �—
Brenham • Bryan • Rosenberg
S:\2006\43306-291 Williamson-Curry Plumbing\CS-04-submit for stamping.doc
►`- 7020 Coyote Run
P Pledger I�alkomey, Inc. Bryan, Texas 77808
979-731-8000, 979-731-1500(Fax)
K Consulting Engineers www.pkengineering.com
January 29, 2007
Mr. Jason Schubert
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re : Site Plan 3
Curry Plumbing
PK Job No. 43306-291
Dear Mr. Schubert,
Enclosed please find the following:
• One (1) revised set of drawings
An Easement Dedication Sheet will be submitted separately.
The following items are addressed:
PLANNING (Jason Schubert)
1 . Changed
2 . Corrected
3. Revised
4 . Drawing revised, only the gate will not have the
wooden fence
5 . The fence was moved over
6. The building sizes were adjusted
7 . Revised
8 . Doubled
9. Thanks !
10 . Shrub identified
11 . Noted
?bks
Okf „,\o\
AnAV Brenham • Bryan • Rosenberg �� o,
S:\2006\43306-291 Williamson-Curry Plumbing\CS-03-site plan 3.doc ‘ f
Mr. Schubert
January 29, 2007
Page 2
ENGINEERING (Josh Norton)
WATER
1 . Water
a. Noted
b. Noted
c. Changed
2 . Drainage
a . Detail added
b. Details added
c. Angle added
d. Not necessary
3 . OK
ADDITIONAL CHANGES:
a. None
Very Truly Yours,
teve E. Duncan, P.E.
sed@pkengineering.com
SED/jer
Enclosure
cc: Leon Williamson