HomeMy WebLinkAboutStaff Comments 1 Planning & Development Services
(" 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
CITY OF COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 30, 2007
TO: Kerr Surveying, LLC, via fax: 979.691.8904
FROM: Jennifer Prochazka, AICP, Senior Planner
SUBJECT: SOUTH HAMPTON PH.4 (FP-Amending) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. When all comments have been
addressed please submit the following information:
One (1) 24"x36" copy of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
mtrevino@cstx.gov.
Upon receipt of the required documents your project will be considered formally filed with the
City of College Station.
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dan & Kim Augsburger, via fax: 866.642.8115
Richard & Dalina Davenport, via email: r-davenport@tamu.edu
Case file #07-00500259
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 2
STAFF REVIEW COMMENTS NO. 1
Project: SOUTH HAMPTON PH.4 (FP-REPLAT) - 07-00500259
PLANNING
1. Please re-title the plat to "Final Plat of Lots 9R & 10R, Block 7 South Hampton Phase 4,
being an Amending Plat of Lots 9 & 10, Block 7 South Hampton Phase 4."
2. Please amend the Surveyor's certificate to include "State of Texas, County of Brazos" in
the header.
3. Add a general note that the property is zoned PDD, Planned Development District.
4. Please add the actual owners into the title block (reads "John Edward Doe").
5. Remove setback lines from the Original Plat.
6. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made aware of
will constitute a completely new review.
Reviewed by: Jennifer Prochazka & Matt Robinson Date: October 24, 2007
ENGINEERING
1. No Comments.
Reviewed by: Carol Cotter Date: October 24, 2007
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: October 23, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. The total cost of any relocation of electric facilities will be made at the developer's
expense.
GENERAL ELECTRICAL COMMENTS
1. To discuss any of the above electrical comments please contact Brent Read at
979.764.5026.
Reviewed by: Gilbert Martinez / Brent Read Date: 10/24/07
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 2