Loading...
HomeMy WebLinkAboutDevelopment Permit Otv DEVELOPMENT PERMIT PERMIT NO. 07-05 (A) CITY OF COLLEGE STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA Planning v Development Servicer RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: lvC/ri Shy . Graham Corner Plaza SH 6 Feeder south of Graham Road Block 1, Lot 3 DRAINAGE BASIN: 1.04 acres Lick Creek DATE OF ISSUE: March 20, 2007 VALID FOR 12 MONTHS OWNER: CONTRACTOR: Drs. Ken and Roxane Spence 2700 Earl Rudder Frwy S, Suite 1900 College Station, Texas 77845 TYPE OF DEVELOPMENT: Clearing and Grading Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit.The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. Clearing and Grading Permit Only The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. VZ6/07 /Administrator/Re resentative Date 40,644.. (10 3 ko io-7 Owner/Agent/Contractor Date DEVELOPMENT PERMIT PERMIT NO. 07-97 CITY OF COLLEGE STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA Planning u'Development Semmes RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Graham Corner Plaza SH 6 Feeder south of Graham Road Block 1, Lot 3, 1.04 acres DRAINAGE BASIN: (Aggieland Dental) Lick Creek DATE OF ISSUE: December 20, 2007 VALID FOR 12 MONTHS OWNER: CONTRACTOR: Drs. Ken and Roxane Spence 2700 Earl Rudder Frwy S, Suite 1900 College Station, Texas 77845 TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit.The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. Full Development Permit The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. /2126707 dministrator/Representati fe Date 1,0-.1 /2)0/ Owner/Agent/Contractor Date