Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLT.FGE STATION Planning d'Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM November 20, 2007 TO: Greg Taggart, MDG via mdgcstx@yahoo.com FROM: Crissy Hartl, Staff Planner SUBJECT: GATEWAY PARK SEC II (PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, December 3, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for December 20, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24" x 36" copy of the revised Preliminary Plat; and Nineteen (19) 11" x 17" copies of the revised Preliminary Plat. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. Please note that a Mylar original of the revised preliminary plat will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Highway 30 Partnership, Owner, 4400 Carter Creek, Suite 105, Bryan, TX 77802 Case file #07-00500291 STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY PARK SEC II (PP) - 07-00500291 PLANNING 1. Our GIS staff has indicated that the metes and bounds of the plat do not close. Please revise accordingly. 2. Please add the label "NOT FOR RECORD" in 1/2" letters in the title block of the plat. 3. Update the date of submittal to November 2007. 4. Per Section 8-J.2 Blocks of the Subdivision Regulations, block length shall not exceed 800' in length. A street may be projected to break the block or a variance may be requested. Please provide a variance request to be considered by the Commission. 5. Per Section 8-1.2.1 Easements, a 20' PUE (or 10' from each side of the abutting properties) is required at the rear of all lots. Please provide the easement or submit the appropriate variance documentation for the Commission's review. 6. Per Section 8-M.1 Sidewalks, sidewalks shall be required on both sides of all streets having a ROW of greater than 60'. Please provide the sidewalks or submit the appropriate variance documentation for the Commission's review. Reviewed by: Crissy Hartl Date: November 20, 2007 ENGINEERING COMMENTS NO. 1 1. Show limits of floodplain and flood way per the effective FIRM and the current City of Bryan study for Carter's Creek. We will be reviewing to the most conservative data until the COB study is approved by FEMA. Lot 2 does not appear to be a viable lot since almost totally in floodway or easements. This should be common area, greenway (private or dedicated to public), or part of Lot 1. 2. Show extension of water line from SH30, perpendicular through proposed Lot 1. 3. Cross access required with lot to the north. Reviewed by: Carol Cotter Date: November 19, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. Transformer lead time is approximately 42 weeks. Load information and site plan are needed as soon as possible to eliminate any possible delays in construction or completion of the project. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: sweido@cstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 11-20-07 FIRE COMMENTS 1. No comments Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: 11/16/07 SANITATION COMMENTS 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: November 13, 2007