Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: GREENS PRAIRIE CENTER PH. 1 (SP)—06-00500203 PLANNING 1. No comment 2. The Drainage report is still under engineering review. Reviewed by: Jennifer Reeves/Grant Wencel Date: September 25, 2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION GENERAL ELECTRICAL COMMENTS 1. No Comments, Outside CSU Electric service territory. 2. To discuss any of the above electrical comments,please contact Tony Michalsky at 979.764.3438 . Reviewed by:Tony Michalsky Date: 9-20-06 FIRE 1. No comments Reviewed by: Steve Smith Date: 09/20/06 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2