HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: GREENS PRAIRIE CENTER PH. 1 (SP)—06-00500203
PLANNING
1. No comment
2. The Drainage report is still under engineering review.
Reviewed by: Jennifer Reeves/Grant Wencel Date: September 25, 2006
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as
per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
GENERAL ELECTRICAL COMMENTS
1. No Comments, Outside CSU Electric service territory.
2. To discuss any of the above electrical comments,please contact Tony Michalsky at
979.764.3438 .
Reviewed by:Tony Michalsky Date: 9-20-06
FIRE
1. No comments
Reviewed by: Steve Smith Date: 09/20/06
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. Page 2 of 2