Loading...
HomeMy WebLinkAboutCorrespondence (*,1114111111114 «a CITY OF COI i FGE STATION Planning dr Development Service 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 25, 2006 TO: Parviz Vessali, Via fax 979.764.9601 FROM: Jennifer Reeves, Project Manager SUBJECT: GREENS PRAIRIE CENTER PH. 1 (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please wait on Engineering to complete the drainage report review prior to submitting the following items; Two (7) site plans One (2) landscaping plans One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Civil Development. Ltd. -Joe Schultz, P.E. 9791 64.7759 Case file#06-00500203 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will const lute a completely new review. Page 1 of 2 CITY OF COLLEGE STATIONVOW Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 /Fax 979.764.3496 MEMORANDUM December 20,2006 TO: Parviz Vessali, Via fax 979.764.9601 FROM: Jennifer Reeves, Project Manager SUBJECT: GREENS PRAIRIE CENTER PH. 1 (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. Please submit the following information for stamping: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If you have any questions or need additional information,please call me at 764-3570. cc: Civil Development. Ltd. -Joe Schultz, P.E. 979.164.77 Case file #06-00500203 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of I (Ql/I 'O 0/R193 * CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: June 11, 2008 To: Jason Schubert Development Services City of College Station From: Kent Laza, P.E. Civil Development, Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Revised Landscaping Plan Greens Prairie Center Phase 1 Detention Pond College Station, Texas Remarks: Accompanying this letter is the following document: Revised Landscaping Plan (24"x 36") 1 copy (11111111111111 CITY OF COLLEGE STATION June 20, 2008 First National Bank of Bryan 2307 S. Texas Ave. Bryan, Texas 77802 SUBJECT: Status of Lot 1, Block 1 Greens Prairie Center Phase 1 As requested, this correspondence will describe the status of the detention pond facility and landscaping associated with Lot 1, Block 1 Greens Prairie Center Phase 1. This lot is owned by Texas Hotel Management, LP and received an approved site plan, landscape plan, and development permit for construction in January 2007. The owner has completed the grading and infrastructure associated with the detention pond and has hydroseeded the site to establish groundcover. The City will continue to monitor the site to ensure groundcover is established and erosion of the pond does not occur. In addition, the City of College Station has received and accepted a bond for the required landscaping. Section 7.5.G of the Unified Development Ordinance allows a bond to provide an extension to the installation of the landscaping for four months from the date of the Certificate of Occupancy. There is not a structure on the lot that requires a building permit so a Certificate of Occupancy is not applicable. The bond was provided in the form of a check and has been deposited into a City account and therefore does not have an expiration. It is Staff's understanding that the bond was provided to allow the facility to be redesigned before installing the landscaping. Given these circumstances, Staff will proceed with the timeframe of the bond given in the ordinance but will also take into account progress in getting a redesigned facility approved. In any case, if ultimately not installed according to the approved landscape plan, the City will execute the bond. As for City requirements, the items as described above satisfy the owner's obligations for the development of the lot. It is Staff's understanding that this facility in part provides detention capacity to Lot 1, Block 2 of the subdivision owned by you. Since the requirements for Lot 1, Block 1 have been met, you may further develop Lot 1, Block 2 in accordance with the detention capacity provided and all other applicable development standards. I hope this information has been helpful, let me know if you have any further questions. Sincerely, Jas n Schubert, AICP Staff Planner Planning & Development Services pc: Parviz Vessali, agent for Texas Hotel Management, LP Matt Klunkert, Klunkert &Associates, Inc Case file #06-00500203 the heart of the Research Valley P.O.Box 9960 1101 TEXAS AVENUE COLLEGE STATION•TEXAS•77842 979.764.3510 www.cstx.aov E-mail Correspondence From: Carol Cotter Cc: Bob Cowell <Bcowell@cstx.gov> To: Jason Schubert<Jschubert@cstx.gov> Sent: 5/30/2008 11:22:52 AM Subject: Parviz Jason- I talked with Parviz today. They are currently constructing the approved detention pond for the Greens Prairie Center Area. They will be turning in revised plans to make the pond more of an amenity. But, they need to get a temporary CO on the current pond when completed to satisfy contractual obligations. They would like to bond out of the landscaping since they will be revising the pond and don't want to end up destroying what they put in. Please email him and copy Joe Schultz regarding how to go about bonding out of landscaping. I believe he would prefer the check method, but wants to know the particulars as far as what needs to be turned in to satisfy this requirement. Thanks! Carol From: Jason Schubert To: parvizvessali@yahoo.com CC: Cotter, Carol; joe@cdlbcs.com Date: 5/30/2008 1:45 PM Subject: landscape bond Parviz, I wanted to follow up on your conversation with Carol earlier today regarding the detention site in Greens Prairie Center. You may bond out of the landscaping to get a temp CO. The bond (which can be done with a check) is to be in the amount of 150% of the landscape bid. A copy of the bid is to be provided with the bond that itemizes the different components (i.e. trees, sod, irrigation). As a FYI, I looked at the approved landscape plan and it appears the calculations were off and much more landscaping was provided than required. I hope this helps, let me know if you have any questions. Thanks, Jason Jason Schubert, AICP Staff Planner Planning & Development Services City of College Station tel: 979.764.3570 fax: 979.764.3496 www.cstx.gov From: "Kent Laza" <KLaza@CDLBCS.com> To: <Jschubert@cstx.gov> Date: 6/2/2008 2:09 PM Subject: Revised Landscaping Plan Attachments: 06-C210-LAN DSCAPE.pdf Jason, Attached is a revised Landscaping Plan of the Greens Prairie Center Detention Pond with fewer trees, but I think the points are still within the requirements. Please look it over and let me know what you think. I'm in the process of trying to get a bid for the work. If I am unable to get a bid today, are there other options for establishing an adequate bond amount? Thank you for your help. Kent Laza, P.E. Project Manager Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Tx. 77840 979-764-7743 office 979-220-1957 cell 979-764-7759 fax klaza@cdlbcs_com From: Jason Schubert To: Klunkert, Matt Date: 6/18/2008 1:30 PM Subject: Re: Detention Pond Arrington Road and Greens Prairie Intersection Completion Letter- Hotel Managemen Matt, I start working on this but it will be a few days before I can get it formalized. Jason Jason Schubert, AICP Staff Planner Planning & Development Services City of College Station tel: 979.764.3570 fax: 979.764.3496 www.cstx.gov >>> "Matt Klunkert" < klunkertassociates@verizon.net > 6/18/2008 11:03 am >>> Mr. Jason Schubert Staff Planner Planning and Development Services City of College Station Dear Jason, 1. Thanks for discussing the above matter with me this morning. As we discussed this morning my client, FIRST NATIONAL BANK OF BRYAN, would like to have a letter from the City of College Station stating that the detention pond constructed by Hotel Management (Owner contact Parviz Vessali, engineering firm -Civil Development, Ltd.) meets with the city's approval and has been accepted. Also what the conditions are regarding the "Bonding Around" for the landscaping & lawn irrigation work are. (ie. Time frames that the bond is good for, when the city requires the landscaping to be completed by, etc.) 2. As we discussed also it is our understanding that with the City's approval and acceptance of this detention pond, that my client, FIRST NATIONAL BANK OF BRYAN, would be able to develop the remainder of their property that is across Arrington Road; legal description Lot 1, Block 2, City of College Station, Brazos County, Texas -Greens Prairie Center Phase I, Vol. 7574, Page 76 - 5.802 acres. Please also refer to this property in your letter to me, as well as if our understanding of item#2 above is correct. Also please address the letter to, FIRST NATIONAL BANK OF BRYAN, 2307 S. Texas Ave., Bryan, Texas 77802, and we would prefer that it be on the City of College Station's letterhead. Please send the original letter to me at the address below. Thank you for your time and efforts in this matter. Should you have any questions please give me a call. Sincerely, Matt Klunkert, CCM R President KLUNKERT &ASSOCIATES, INC. Consulting * Construction Program Management 1722 Broadmoor, Suite 102 Bryan, Texas 77802 979-731-8584, fax 979-731-8579 From: Jason Schubert To: Klunkert, Matt CC: parvizvessali@yahoo.com Date: 6/20/2008 3:44 PM Subject: Greens Prairie Center detention pond Attachments: Letter.pdf Matt, I have attached a copy of the letter you requested on behalf of First National Bank and have put the original in the mail to you. I have also copied Parviz to make sure everyone is on the same page. Let me know if you have any questions. Thanks, Jason Jason Schubert, AICP Staff Planner Planning & Development Services City of College Station tel: 979.764.3570 fax: 979.764.3496 www.cstx.gov From: "Matt Klunkert" <klunkertassociates@verizon.net> To: "'Jason Schubert"' <Jschubert@cstx.gov> Date: 6/23/2008 8:43 AM Subject: RE: Greens Prairie Center detention pond Dear Jason, Thank you for sending the letter. I have passed in on to the Owners and their attorney for their review and comments. I will let you know if they have any concerns. Thank you again for your assistance in this matter. Sincerely, Matt Klunkert, CCM R President KLUNKERT&ASSOCIATES, INC. Consulting * Construction Program Management 979-731-8584, fax 979-731-8579 (I- College The City of Station, Texas Embracing the Past, Explo thig the Future. P.O.Box 9960 • 1101 Texas Avenue • College Station,TX 77842 • (979)764-3500 www.ci.college-statio a.tx.us John Rose 4215 Walnut Hill Lane Dallas, Texas 75229-6345 Dear Sirs, Attached you will find a copy of the required information for the project discussed on 4- 26-04 with the City of College Station Planning Department. • Flow chart for Master Plan—Preliminary Plat—Final Plat processes • Current list of Planning&Zoning commission members and City Council (please take note that local elections will be held May 15) • Final Plat of the Alam Addition If any further information is needed please contact Molly Hitchcock at 979-764-3570. Sincerely, Susan Stanley CSR Development Services cc: Veronica Morgan Home of Texas A&M University Bridgette George -Greens Prairie/SH6 Retail Center From: "Veronica Morgan"<v@mitchellandmorgan.com> To: "'Bridgette George'<BGEORGE@cstx.gov>,"'Spencer Thompson"<Sthompson@cstx.gov> Date: 4/22/2004 6:59 AM Subject: Greens Prairie/SH6 Retail Center Bridgette, The drawing I dropped off with Spencer last night shows the ultimate buildout of this property. The developer at this time is looking to plat and develop the hatched area that is 6.4 acres. He will build Lakeway with a subsequent phase. He was somewhat reluctant to show the ultimate buildout because he wasn't sure how it really may develop (i.e. hotels/retail/office/etc.) but I told him to show it so that we can see how much development is left to support the cost of construction of Lakeway. We know access issues will be of concern and we will need to work with you guys as well as TxDOT on those. We are currently looking at the ramp relocations to see where those may be located. Hope the drawing helps. Let me know if you guys need anything else to make your review easier. I do have the Greens Prairie Road widening plans that are adjacent to this property and the raised median goes the whole way from SH6 to Lakeway as the first median opening. V Veronica Morgan Mitchell & Morgan, LLP 511 University Drive Suite 204 College Station, Texas 77840 CONFIDENTIALITY NOTE: This e-mail and any files transmitted with it contain privileged and confidential information and are intended solely for the use of the individual or entity to which they are addressed. If you are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, you are hereby notified that any dissemination or copying of this e-mail or any of its attachment(s) is strictly prohibited. If you have received this e-mail in error, please immediately notify the sending individual or entity by e-mail and permanently delete the original e-mail and attachment(s) from your computer system. DISCLAIMER: This data is authorized "AS IS"without any warranty as to its performance,accuracy, freedom from error, or as to any results generated through its use, including without limitation, any implied warranties of merchantability or fitness for a particular purpose. You assume the entire risk as to the results and performance of this data. CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: June 6, 2008 To: Jason Schubert Development Services City of College Station n From: Kent Laza, P.E. C•i Civil Development, Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Bond for Landscaping of Detention Pond Greens Prairie Center Phase 1 College Station, Texas Remarks: Accompanying this letter are the following documents: Revised Landscaping Plan 1 copy Proposal for Landscaping Installation 1 copy Check for 150% of the Proposal ($25,785.15 * 1.5 = $38,677.73) (Please note that establishment of grass is not included in the Landscaping Proposal. That work has been performed as part of the detention pond construction.) .1tif\ csuid t ,(m ."?3 trn 1 &I 1)-- l cE /, t.,