September 25, 2006
TO: Parviz Vessali, Via fax 979.764.9601
FROM: Jennifer Reeves, Project Manager
SUBJECT: GREENS PRAIRIE CENTER PH. 1 (SP) -Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please wait on Engineering to
complete the drainage report review prior to submitting the following items;
Two (7) site plans
One (2) landscaping plans
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please call me at
979.764.3570.
Attachments: Staff review comments
cc: Civil Development. Ltd. -Joe Schultz, P.E. 9791 64.7759
Case file#06-00500203
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the
City,will const lute a completely new review. Page 1 of 2
CITY OF COLLEGE STATIONVOW
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 /Fax 979.764.3496
MEMORANDUM
December 20,2006
TO: Parviz Vessali, Via fax 979.764.9601
FROM: Jennifer Reeves, Project Manager
SUBJECT: GREENS PRAIRIE CENTER PH. 1 (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. Please submit the following information
for stamping:
Seven (7) complete sets of construction documents for the proposed development
with the revised site and landscaping plans attached (one set will be returned to you,
please submit additional copies if you want more than one approved set)
Two (2) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If you have any questions or need additional information,please call me at 764-3570.
cc: Civil Development. Ltd. -Joe Schultz, P.E. 979.164.77
Case file #06-00500203
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. 1 of I
(Ql/I 'O
0/R193
* CIVIL DEVELOPMENT, Ltd.*
CIVIL ENGINEERING&DESIGN-BUILD SERVICES
TRANSMITTAL
Date: June 11, 2008
To: Jason Schubert
Development Services
City of College Station
From: Kent Laza, P.E.
Civil Development, Ltd.
P.O. Box 11929
College Station, Texas 77842
Phone: (979) 764-7743
Subject: Revised Landscaping Plan
Greens Prairie Center Phase 1 Detention Pond
College Station, Texas
Remarks:
Accompanying this letter is the following document:
Revised Landscaping Plan (24"x 36") 1 copy
(11111111111111
CITY OF COLLEGE STATION
June 20, 2008
First National Bank of Bryan
2307 S. Texas Ave.
Bryan, Texas 77802
SUBJECT: Status of Lot 1, Block 1 Greens Prairie Center Phase 1
As requested, this correspondence will describe the status of the detention pond facility and
landscaping associated with Lot 1, Block 1 Greens Prairie Center Phase 1. This lot is owned by
Texas Hotel Management, LP and received an approved site plan, landscape plan, and
development permit for construction in January 2007.
The owner has completed the grading and infrastructure associated with the detention pond and
has hydroseeded the site to establish groundcover. The City will continue to monitor the site to
ensure groundcover is established and erosion of the pond does not occur. In addition, the City
of College Station has received and accepted a bond for the required landscaping. Section
7.5.G of the Unified Development Ordinance allows a bond to provide an extension to the
installation of the landscaping for four months from the date of the Certificate of Occupancy.
There is not a structure on the lot that requires a building permit so a Certificate of Occupancy is
not applicable. The bond was provided in the form of a check and has been deposited into a
City account and therefore does not have an expiration. It is Staff's understanding that the bond
was provided to allow the facility to be redesigned before installing the landscaping. Given
these circumstances, Staff will proceed with the timeframe of the bond given in the ordinance
but will also take into account progress in getting a redesigned facility approved. In any case, if
ultimately not installed according to the approved landscape plan, the City will execute the bond.
As for City requirements, the items as described above satisfy the owner's obligations for the
development of the lot. It is Staff's understanding that this facility in part provides detention
capacity to Lot 1, Block 2 of the subdivision owned by you. Since the requirements for Lot 1,
Block 1 have been met, you may further develop Lot 1, Block 2 in accordance with the detention
capacity provided and all other applicable development standards. I hope this information has
been helpful, let me know if you have any further questions.
Sincerely,
Jas n Schubert, AICP
Staff Planner
Planning & Development Services
pc: Parviz Vessali, agent for Texas Hotel Management, LP
Matt Klunkert, Klunkert &Associates, Inc
Case file #06-00500203
the heart of the Research Valley
P.O.Box 9960
1101 TEXAS AVENUE
COLLEGE STATION•TEXAS•77842
979.764.3510
www.cstx.aov
E-mail Correspondence
From: Carol Cotter
Cc: Bob Cowell <Bcowell@cstx.gov>
To: Jason Schubert<Jschubert@cstx.gov>
Sent: 5/30/2008 11:22:52 AM
Subject: Parviz
Jason-
I talked with Parviz today. They are currently constructing the approved detention pond for the Greens
Prairie Center Area. They will be turning in revised plans to make the pond more of an amenity. But,
they need to get a temporary CO on the current pond when completed to satisfy contractual obligations.
They would like to bond out of the landscaping since they will be revising the pond and don't want to end
up destroying what they put in. Please email him and copy Joe Schultz regarding how to go about
bonding out of landscaping. I believe he would prefer the check method, but wants to know the
particulars as far as what needs to be turned in to satisfy this requirement. Thanks!
Carol
From: Jason Schubert
To: parvizvessali@yahoo.com
CC: Cotter, Carol; joe@cdlbcs.com
Date: 5/30/2008 1:45 PM
Subject: landscape bond
Parviz,
I wanted to follow up on your conversation with Carol earlier today regarding the detention site in Greens
Prairie Center. You may bond out of the landscaping to get a temp CO. The bond (which can be done
with a check) is to be in the amount of 150% of the landscape bid. A copy of the bid is to be provided
with the bond that itemizes the different components (i.e. trees, sod, irrigation). As a FYI, I looked at the
approved landscape plan and it appears the calculations were off and much more landscaping was
provided than required. I hope this helps, let me know if you have any questions.
Thanks,
Jason
Jason Schubert, AICP
Staff Planner
Planning & Development Services
City of College Station
tel: 979.764.3570
fax: 979.764.3496
www.cstx.gov
From: "Kent Laza" <KLaza@CDLBCS.com>
To: <Jschubert@cstx.gov>
Date: 6/2/2008 2:09 PM
Subject: Revised Landscaping Plan
Attachments: 06-C210-LAN DSCAPE.pdf
Jason,
Attached is a revised Landscaping Plan of the Greens Prairie Center Detention Pond with fewer trees, but
I think the points are still within the requirements. Please look it over and let me know what you think. I'm
in the process of trying to get a bid for the work. If I am unable to get a bid today, are there other options
for establishing an adequate bond amount? Thank you for your help.
Kent Laza, P.E.
Project Manager
Civil Development, Ltd.
2033 Harvey Mitchell Parkway South
College Station, Tx. 77840
979-764-7743 office
979-220-1957 cell
979-764-7759 fax
klaza@cdlbcs_com
From: Jason Schubert
To: Klunkert, Matt
Date: 6/18/2008 1:30 PM
Subject: Re: Detention Pond Arrington Road and Greens Prairie Intersection Completion Letter- Hotel
Managemen
Matt, I start working on this but it will be a few days before I can get it formalized.
Jason
Jason Schubert, AICP
Staff Planner
Planning & Development Services
City of College Station
tel: 979.764.3570
fax: 979.764.3496
www.cstx.gov
>>> "Matt Klunkert" < klunkertassociates@verizon.net > 6/18/2008 11:03 am >>>
Mr. Jason Schubert
Staff Planner
Planning and Development Services
City of College Station
Dear Jason,
1. Thanks for discussing the above matter with me this morning. As we discussed this morning my client,
FIRST NATIONAL BANK OF BRYAN, would like to have a letter from the City of College Station stating
that the detention pond constructed by Hotel Management (Owner contact Parviz Vessali, engineering
firm -Civil Development, Ltd.) meets with the city's approval and has been accepted. Also what the
conditions are regarding the "Bonding Around" for the landscaping & lawn irrigation work are. (ie. Time
frames that the bond is good for, when the city requires the landscaping to be completed by, etc.)
2. As we discussed also it is our understanding that with the City's approval and acceptance of this
detention pond, that my client, FIRST NATIONAL BANK OF BRYAN, would be able to develop the
remainder of their property that is across Arrington Road; legal description Lot 1, Block 2, City of College
Station, Brazos County, Texas -Greens Prairie Center Phase I, Vol. 7574, Page 76 - 5.802 acres.
Please also refer to this property in your letter to me, as well as if our understanding of item#2 above is
correct. Also please address the letter to, FIRST NATIONAL BANK OF BRYAN, 2307 S. Texas Ave.,
Bryan, Texas 77802, and we would prefer that it be on the City of College Station's letterhead.
Please send the original letter to me at the address below.
Thank you for your time and efforts in this matter. Should you have any questions please give me a call.
Sincerely,
Matt Klunkert, CCM R
President
KLUNKERT &ASSOCIATES, INC.
Consulting * Construction Program Management
1722 Broadmoor, Suite 102
Bryan, Texas 77802
979-731-8584, fax 979-731-8579
From: Jason Schubert
To: Klunkert, Matt
CC: parvizvessali@yahoo.com
Date: 6/20/2008 3:44 PM
Subject: Greens Prairie Center detention pond
Attachments: Letter.pdf
Matt,
I have attached a copy of the letter you requested on behalf of First National Bank and have put the
original in the mail to you. I have also copied Parviz to make sure everyone is on the same page. Let me
know if you have any questions.
Thanks,
Jason
Jason Schubert, AICP
Staff Planner
Planning & Development Services
City of College Station
tel: 979.764.3570
fax: 979.764.3496
www.cstx.gov
From: "Matt Klunkert" <klunkertassociates@verizon.net>
To: "'Jason Schubert"' <Jschubert@cstx.gov>
Date: 6/23/2008 8:43 AM
Subject: RE: Greens Prairie Center detention pond
Dear Jason,
Thank you for sending the letter. I have passed in on to the Owners and their attorney for their review
and comments. I will let you know if they have any concerns.
Thank you again for your assistance in this matter.
Sincerely,
Matt Klunkert, CCM R
President
KLUNKERT&ASSOCIATES, INC.
Consulting * Construction Program Management
979-731-8584, fax 979-731-8579
(I- College
The City of
Station, Texas
Embracing the Past, Explo thig the Future.
P.O.Box 9960 • 1101 Texas Avenue • College Station,TX 77842 • (979)764-3500
www.ci.college-statio a.tx.us
John Rose
4215 Walnut Hill Lane
Dallas, Texas 75229-6345
Dear Sirs,
Attached you will find a copy of the required information for the project discussed on 4-
26-04 with the City of College Station Planning Department.
• Flow chart for Master Plan—Preliminary Plat—Final Plat processes
• Current list of Planning&Zoning commission members and City Council (please
take note that local elections will be held May 15)
• Final Plat of the Alam Addition
If any further information is needed please contact Molly Hitchcock at 979-764-3570.
Sincerely,
Susan Stanley
CSR Development Services
cc: Veronica Morgan
Home of Texas A&M University
Bridgette George -Greens Prairie/SH6 Retail Center
From: "Veronica Morgan"<v@mitchellandmorgan.com>
To: "'Bridgette George'<BGEORGE@cstx.gov>,"'Spencer Thompson"<Sthompson@cstx.gov>
Date: 4/22/2004 6:59 AM
Subject: Greens Prairie/SH6 Retail Center
Bridgette,
The drawing I dropped off with Spencer last night shows the ultimate buildout of this property. The developer at this time
is looking to plat and develop the hatched area that is 6.4 acres. He will build Lakeway with a subsequent phase. He was
somewhat reluctant to show the ultimate buildout because he wasn't sure how it really may develop (i.e.
hotels/retail/office/etc.) but I told him to show it so that we can see how much development is left to support the cost of
construction of Lakeway. We know access issues will be of concern and we will need to work with you guys as well as
TxDOT on those. We are currently looking at the ramp relocations to see where those may be located. Hope the drawing
helps. Let me know if you guys need anything else to make your review easier. I do have the Greens Prairie Road
widening plans that are adjacent to this property and the raised median goes the whole way from SH6 to Lakeway as the
first median opening.
V
Veronica Morgan
Mitchell & Morgan, LLP
511 University Drive Suite 204
College Station, Texas
77840
CONFIDENTIALITY NOTE: This e-mail and any files transmitted with it contain privileged and confidential information and
are intended solely for the use of the individual or entity to which they are addressed. If you are not the intended recipient
or the person responsible for delivering the e-mail to the intended recipient, you are hereby notified that any dissemination
or copying of this e-mail or any of its attachment(s) is strictly prohibited. If you have received this e-mail in error, please
immediately notify the sending individual or entity by e-mail and permanently delete the original e-mail and attachment(s)
from your computer system.
DISCLAIMER: This data is authorized "AS IS"without any warranty as to its
performance,accuracy, freedom from error, or as to any results generated
through its use, including without limitation, any implied warranties of
merchantability or fitness for a particular purpose. You assume the entire
risk as to the results and performance of this data.
CIVIL DEVELOPMENT, Ltd.*
CIVIL ENGINEERING&DESIGN-BUILD SERVICES
TRANSMITTAL
Date: June 6, 2008
To: Jason Schubert
Development Services
City of College Station n
From: Kent Laza, P.E. C•i
Civil Development, Ltd.
P.O. Box 11929
College Station, Texas 77842
Phone: (979) 764-7743
Subject: Bond for Landscaping of Detention Pond
Greens Prairie Center Phase 1
College Station, Texas
Remarks:
Accompanying this letter are the following documents:
Revised Landscaping Plan 1 copy
Proposal for Landscaping Installation 1 copy
Check for 150% of the Proposal ($25,785.15 * 1.5 = $38,677.73)
(Please note that establishment of grass is not included in the Landscaping Proposal. That
work has been performed as part of the detention pond construction.)