Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project:DUCK HAVEN PH. 2 (FP) -06-00500202 PLANNING W The owners listed under the Certificate of Ownership and Dedication are not the same as those included with the Tax Certificates in all cases. Please reconcile. In addition, please add the lot and block next to the owners name under the certificate. $„" Please use only the common name of the plat, Duck Haven Phase II, in the Certificate of 0 Ownership and Dedication. )Please look at the required language for fp Certificate of Ownership and Dedication and the Notary Public's Certificates. - I U a C- : e ounty s erti icate as a line for the "Chairman" o sign. Should this be County Judge? 5. Please add a note to the plat that all adjacent rights-of-ways are to remain and are not included in this vacating plat. ,(i' The application states that the subdivision is 13.998 acres. The plat states that it is 21.430. V Please reconcile. Please provide ownership and legal description of properties adjacent to the subdivision (including property within Duck Haven). :. City limit lines should be included in vicinity map. r4 Please provide north arrow. M " ti •nvah.. Reviewed by:Jennifer Prochazka&Jason Schubert Date: September 25,2006 BRAZOS COUNTY 1. Plat still under review. Reviewed by: Gary Arnold Date: September 25,2006 STAFF REVIEW COMMENTS NO. 1 Project: DUCK HAVEN PH. 2 (FP) - 06-00500202 PLANNING 1. Please look at the required language for the Certificate of the Notary Public. 2. Please provide north arrow. 3. The construction documents and reports are still under review and may affect the plat. Reviewed by:Jennifer Prochazka&Jason Schubert Date: October 23, 2006 ENGINEERING 1. Extend the drainage easement being required on Phase 3 through Lots 12 and 13 in Phase 2. 2. Please make sure to denote the DE as a private drainage easement. Reviewed by: Carol Cotter Date: October 23,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2