HomeMy WebLinkAboutstaff review STAFF REVIEW COMMENTS NO. 1
Project:Westerheim Custom Homes—06-00500200
PLANNING
1. Except for Site Notes,place all other Sheet C1.1 notes on a separate sheet.
2. Place the bicycle rack and curb and pavement details on Sheet C1.1. The remaining details of
Sheet C2.1 are not necessary for review.
3. Provide the total site area in the Title Block
4. Label the State Farm Office Building as existing.
5. Remove building setback lines from the adjacent State Farm property.
6. Building setback lines are measured from the property line regardless of the presence of
easements. As such,remove Site Note #5 and relocate the front building setback from 59'to 25'
and the rear building setback from 20'to 15'.
7. Relocate or alter the building so that the southwest corner of the building is not encroaching into
the 7.5'side building setback.
8. Calculate the square footage of the parking end island. Only the portion on the subject property
may be counted toward the 180 square foot requirement.
9. Remove Site Note #9 regarding the bicycle rack. The rack must be placed entire on the subject
property and located in relation as per Unified Development Ordinance (UDO) Section 7.9.B.5.
10. Provide color building elevations, material list and samples with the percentage of colors and
materials used.
11. Please verify that the fire lane meets the minimum standard of 20'in width.
Reviewed by:Jason Schubert Date: September 18,2006
LANDSCAPING/STREETSCAPING/BUFFER
1. In order for the 3 water oak trees to meet the buffer yard canopy tree requirement, they must be
at least 2"in caliper.
2. All plantings that are used to meet the buffer yard requirement must be placed on the subject
property.
3. As per Section 7.5.A of the Unified Development Ordinance (UDO), dwarf species are not
allowed in the required buffer area.
4. In the Landscape Schedule,group buffer yard and non-buffer yard plantings together.
Reviewed by:Jason Schubert Date: September 18,2006
ENGINEERING COMMENTS NO. 1
1. The detention pond direct discharge into the rear drainage easement will not work. The rear
drainage easement does not function as it was originally intended and all drainage is
ultimately discharged onto the mobile home park. Would it not be more appropriate in this
case to design the site and roof drains to discharge toward the front or west side of the
property. I believe you designed Lot 8C similar to what I am describing.
Reviewed by:Josh Norton Date: September 18,2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. P.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer to intercept existing conduit at designated transformers and extend as required.
4. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
5. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
grnartinezQcstx.gov
6. Developer provides load data for project. (Available service voltage is 208/120 3 phase)
7. To discuss any of the above electrical comments,please contact Gilbert Martinez at
979.764.6255
Reviewed by: Gilbert Martinez Date: September 13, 2006
SANITATION COMMENTS
1. Sanitation is ok with this project.
2. They should be able to utilize a 90 gallon roll-out garbage container for their solid waste
disposal.
Reviewed by:Wally Urrutia Date: September 13,2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and`bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review. F
STAFF REVIEW COMMENTS NO. 1
Project:Westerheim Custom Homes—08-00500200
PLANNING
4< Except for Site Notes,place all other Sheet C1.1 notes on a separate sheet.( t-Y .1 EXCF�TiotJ)
II2 Place the bicycle rack and curb and pavement details on Sheet C1.1. The remaining details of
Sheet C2.1 are not necessary for review.
�Provide the total site area in the Title Block
Label the State Farm Office Building as existing.
i Remove building setback lines from the adjacent State Fa m property.
6. Building setback lines are measured from the property line regardless of the presence of
easements. As such,remove Site Note#5 and relocate the front building setback from 59'to 25'
d the rear building setback from 20'to 15'. CtgCoK.i c'1 — SE-E. Pc.-44(0V
,..and
or alter the building so that the southwest corner of the building is not encroaching into
the 7.5'side building setback.
v Calculate the square footage of the parking end island Only the portion on the subject property
may be counted toward the 180 square foot requirerment.
Remove Site Note#9 regarding the bicycle rack. The rack must be placed entire on the subject
property and located in relation as per Unified Development Ordinance(UDO)Section 7.9.B.5. L f:£c.cc 1 OP�
10. Provide color building elevations, material list and samples with the percentage of colors and
materials used (P t v t DE.AC, )t t-DP--tz-)
d.l i'lease verify that the fire lane meets the minimum standard of 20'in width.
Reviewed by:Jason Schubert Date:September 18,2006
LANDSCAPING/STREETSCAPING/BUFFER
In order for the 3 water oak trees to meet the buffer yard canopy tree requirement,they must be
/t least 2"in caliper.
All plantings that are used to meet the buffer yard requirement must be placed on the subject
property.
014 As per Section 7.5.A of the Unified Development Ordinance (UDO), dwarf species are not
oe„allowed in the required buffer area.
the Landscape Schedule,group buffer yard and non-buffer yard plantings together.
Reviewed by:Jason Schubert Date:September 18,2006
ENGINEERING COMMENTS NO.1
(J1. The detention pond direct discharge into the rear drainage easement will not work. The rear
drainage easement does not function as it was originally intended and all drainage is
ultimately discharged onto the mobile home park. Would it not be more appropriate in this
case to design the site and roof drains to discharge toward the front or west side of the
property. I believe you designed Lot 8C similar to what I am describing_
C5cE P\?A-trlP�Cx-£
Reviewed by:Josh Norton Date:September 18,2006
NOTA Any changes made to the plans,that hove not been requested by the City of Cosege Station.must be explained
In your nag transmittal letter and ambled on your plans.Any additional changes on Mese plans that have not
been pointed out to the Cily,WI constitute a completely new sewew.
•
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer to intercept existing conduit at designated transformers and extend as required.
4. If conduit does not exist at designated transformer,developer to furnish and install conduit
as shown on electrical layout.
5. Developer provides digital AutoCAD 2000 or later version of plat and/oz site plan email to
gnnaritnez(cstx.gov
6. Developer provides load data for project (Available service voltage is 208/120 3 phase)
7. To discuss any of the above electrical comments,please contact Gilbert Martinez at
979.764.6255
Reviewed by:Gilbert Martinez Date:September 13,2006
SANITATION COMMENTS
1. Sanitation is ok with this project.
2. They should be able to utilize a 90 gallon roll-out garbage container for their solid waste
disposal.
Reviewed by:Wally Urrutia Date:September 13,2006
•
NOTE: My changes made to the p1ens,that have not been requested by the Cully of College Station,must be explained
in your next transmittal letter and'bubbled"on your plans.Any aria/Banat changes on these plans that have not
been pointed out to nue City,w oansdtute a completely new review.
STAFF REVIEW COMMENTS NO. 2
Project:Westerheim Custom Homes -06-00500200
PLANNING
1. Place wheelstop on standard parking space next to the handicap space.
2. If"New Walk"in front of the porch is curbed,please illustrate as such.
3. Remove hatching and calculation for end island area. Landscaping directly in front of parking
spaces is not considered as end island.
Reviewed by: Jason Schubert Date: October 2,2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. 2 of 2