Loading...
HomeMy WebLinkAboutCorrespondence CITY OF COI I FGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 12,2006 TO: Ron Lagrone,MM&R Development,LLP via fax 979.690.9532 FROM: Lindsay Boyer,Staff Planner SUBJECT: LAKESIDE VILLAGE (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, September 18th , 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, October 5th , 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36"copies of the revised final plat; Fifteen (15) 11"x17"copies of the revised final plat; Parkland Dedication in the amount of$31,136 must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffm@cstx.gov and awelsh@cstx.gov. Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning&Zoning Commission meeting.Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: CSC Engineering and Environmental Consultants, Inc,via email csc@txcyber.com Case file#06-00500196 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 2 AUG-17-2007 FRI 04:43 PM FAX NO, P. 01 yip';,rF.". ."M Public Works +t/�rl` " i.1�R��'1• Administration °s ❑ Engineering Facility Maintenance ❑ Fleet Cm1' OF COLLEGESTATION n ,Ss trcjet at ainage ❑ Traffic Signals 2,i3C2AL0-11_9b-a0,_,P,—) e.u/Alk -p Sves (c.tupny name) This 14AX is being sent to you from: _ This fax contains „.,.„2, pages including the cover sheet, please call if you didn't receive all the information_ Adclitiortal Comments; City of College Station Public Works Department P.U. Box 9960 2613 S, Texas''Avenue College Station,TX 77840 (979)764-3690 FAX: (979) 764-3489 LAGRONE CONSTRUCTION COMPANY August 10, 2007 To: Debra Grace Dear Debra, I have enclosed: Mylar of final plat Lakeside Village Phase I and 2. Please note , phase I is private. Current tax certificate. Check in the amount of$31,136 for parkland dedication fee. Please let me know if you need anything else in order to get the plat recorded. Sincerely, M.M.&R. Development,L.L.P. i Ron Lagrone 4603 Caddie Ct.,College Station,TX 77845 Ph(979)690-0182/Fax(979)690-9532 Page 1 of 1 Carol Cotter - Re: Lakeside Village From: Carol Cotter To: Melissa Karnei Date: 12/18/2006 10:57 AM Subject: Re: Lakeside Village How are you dedicating this PUE? It was not shown on the Final Plat that went to P&Z. Are you wanting to add it to the mylar before filing? >>> "Melissa Karnei" <mkarnei@txcyber.com> 12/18/2006 10:38 AM >>> Carol, Attached is the PDF of C-6 with the additional P.U.E. indicated in red. If this is not right or changes need to be made to the P.U.E. in order for the construction drawings to be approved, please let us know what kind of changes we are needing to make. Thank you, Melissa Karnei mkarnei(a txcyber.com CSC Engineering & Environmental Consultants, Inc. 3407 Tabor Road Bryan, Texas 77808 (979) 778-2810 Fax: (979)778-0820 file://C:\Documents and Settings\ccotter.CSTX\Local Settings\Temp\XPgrpwise\45867424City o... 12/18/2006 Page 1 of 1 Carol Cotter - Lakeside Village .,.,.y. ,:�,9�,. .f�.:��6.'6.�PFA' �$^'{•,. F^h�F9.. Wim,,; '. .. ..•� ..,rte.. ... ..n.. From: Carol Cotter To: Rick Conlin Date: 12/18/2006 9:14 AM Subject: Lakeside Village CC: Bridgette George Rick- You are still showing the waterline outside the PUE between Sta 6+60 and Sta 7+00 on Sheet C-6. Water line needs to be 5.5' inside the PUE. Are you planning to dedicate additional PUE, or adjust the line? All other comments have been addressed. Carol file://C:\Documents and Settings\ccotter.CSTX\Local Settings\Temp\XPgrpwise\45865BDECity ... 12/18/2006 r CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM December 14, 2006 TO: Ron Lagrone, MM&R Development, via fax 690.9532 FROM: Carol Cotter SUBJECT: Engineering Document Comments for Lakeside Village Final Plat Staff reviewed the above-mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) sets of revised construction documents; Two (2) copies of Engineer's Cost Estimate; One (1) copy of the NOI. If you have any questions or need additional information, please call 764.3570 at 979.764.3570. Attachments: Staff review comments pc: CSC Engineering & Environmental Consultants, Inc., via fax 778.0820 Case File No. 06-196 TRANSMISSION VERIFICATION REPORT TIME : 11/30/2006 16: 51 NAME : FAX . TEL . SER.# : 000L5J596800 DATE,TIME 11/30 16:50 FAX NO. /NAME 96909532 DURATION 00:00:39 PAGES} 02 RESULT OK MODE STANDARD ECM I .EQotu All-pNnl..n..„_Nhr,enturr,u;:....snoC.._Z7Y C....,.f..,........yL...t..,..Y�.......,'FSTATION m -sQBBIMmPwn_ tg....�,.....Ekoo.. .Servd•n.iCss gofufielti��•`�r_:R(�l�+i�°—•. 1.101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM- ADDENDUM November 30,2006 TO: Ron Lagrone,MM&R Development,LLP via fax 979.690.9532 FROM: Carol Cotter,Graduate Livia Engineer SUBJECT: LAKESIDE VILLAGE (FP) - Final Plat Staff reviewed the construction documents for above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please submit the following information for review; One (1) revised set of construction plans; Addendum to Drainage Report. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Engineering Comments No.3 cc: CSC Engineering and Environmental Consultants,Inc,via email cscctxcyber.eom- C'��p ftp n nn6nn19f, (0.1"111114111 Crryor COLLEGE STATION Planning 6Development Services 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM- ADDENDUM November 30,2006 TO: Ron Lagrone,MM&R Development,LLP via fax 979.690.9532 FROM: Carol Cotter,Graduate Civil Engineer SUBJECT: LAKESIDE VILLAGE (FP) - Final Plat Staff reviewed the construction documents for above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please submit the following information for review; One (1) revised set of construction plans; Addendum to Drainage Report. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Engineering Comments No.3 cc: CSC Engineering and Environmental Consultants,Inc,via email csc@txcyber.com Case file#06-00500196