HomeMy WebLinkAboutCorrespondence Grrffi1441
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 20, 2006
TO: DDH Investments, Inc., via fax 690.1041 L/
FROM: Carol Cotter, Graduate Civil Engineer
SUBJECT: Engineering Document Comments for Castlerock Ph. 1A Final Plat
Staff reviewed the above-mentioned engineering documents as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review and approval of the plans:
One (1) sets of revised construction documents.
If you have any questions or need additional information, please call me at
979.764.3570.
Attachments: Staff review comments
pc: Joe Schultz, P.E., Civil Development, Ltd., via fax 764.7759 y(
Case File No. 06-500192
1O' 1, 1 (41
,,D
* CIVIL DEVELOPMENT, Ltd.* 5
CIVIL ENGINEERING&DESIGN-BUILD SERVICES
TRANSMITTAL
Date: October 11, 2006
To: Carol Cotter
Development Services
City of College Station
From: Joe Schultz, P.E.�C
Civil Developmen , td.
P.O. Box 11929
College Station, Texas 77842
Phone: (979) 764-7743
Subject: Revised Drawings
Castlerock Subdivision
College Station, Texas
Remarks: Attached are 1 copy of the revised construction drawings, 1 copy of our
response to comments, 2 copies of the Engineer's estimate and 5 copies of a
TXDOT utility permit for the waterline construction in SH 40.
Let me know if you need anything else or have any questions.
Cirri1111111111
CITY OF COLLEGE STATION
Planning dr Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 20,2006
TO: DDH Investments Via fax 690.1041
FROM: Carol Cotter,Project Engineer
SUBJECT: CASTLEROCK PH.1A(FP) - Final Plat- Construction Documents
Staff reviewed the above-mentioned final plat construction documents as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
One (1) revised set of construction documents
If you have any questions or need additional information,please call me at 979.764.3570.
http://www.cstx.gov/home/index.asp?page=2481.
Attachments: Staff review comments
cc: Civil Development,Ltd-Joe Schultz,P.E.via fax 764.7759
Case file #06-00500192
•
\7-)
TRANSMISSION VERIFICATION REPORT
TIME : 09/20/2006 16:15
NAME :
FAX .
TEL .
SER.# : 000L5J596800
DATE,TIME 09/20 16: 15
FAX NO./NAME 96901041
DURATION 00:00:19
PAGE(S) 02
RESULT OK
MODE STANDARD
ECM
(114,4411141
CITY OFCOLLFZE 5TAT[orr ,,, •
Pl n g a p„e.r ;�
m.
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 20,2006
TO; DDH Investments Via fax 690.1041
FROM: Carol Cotter,Project Engineer
SUBJECT: CASTLEROCK PH.1A(FP) - Final Plat- Construction Documents
Staff reviewed the above-mentioned final plat construction documents as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
One (1) revised set of construction documents
If you have any questions or need additional information,please call me at 979.764.3570.
http://www.cstx.gov/home/index.asp?page=2481.
Attachments: Staff review comments
rr- (Th r I fi.v.pi rrt-now T..iA _Tna CrI,.,1 77 F t.i., F..74d 77CO
TRANSMISSION VERIFICATION REPORT
TIME : 09/20/2006 16:16
NAME :
FAX .
TEL .
SER.# : 000L5J596800
DATE,TIME 09/20 16:16
FAX NO./NAME 97647759
DURATION 00:00:21
PAGE(S) 02
RESULT OK
MODE STANDARD
ECM
(*-1,111111
C
F'X'X't)FOLi.EGF$TA,'I7QN
PLpmbw ti•Deee%pssent Services
1101 Texas Avenue,P.Q.Box 9960
College Station,Texas 77842
Phone 979-764.3570 / Fax 979.764.3496
MEMORANDUM
September 20,2006
TO: DDI-1 Investments Via fax 6901041
FROM Carol Cotter,Project Engineer
SUBJECT CASTLEROCK PH.1A(FP) - Final Plat- Construction Documents
Staff reviewed the above-mentioned final plat construction documents as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
One(1)revised set of construction documents
If you have any questions or need additional information,please call me at 979.764.3570.
http;//www.cstx,gov/home/index.asp?page-2481.
Attachments: Staff review comments
r+a .. T,o c,i„a+, n R •. c yr t 77K0
CITY OF COI T FGE STATION
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 12,2006
TO: DDH Investments Via fax 690.1041
FROM: Jennifer Reeves,Project Manager
SUBJECT: CASTLEROCK PH.1A(FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been addressed and
the following information submitted by Monday September 18, 2006 by 10:00 a.m., your project will
be placed on the next available Planning and Zoning Commission meeting scheduled for October 5,
2006 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24"x36" copies of the revised final plat;
Fifteen (15) 11"x17" copies of the revised final plat;
Parkland Dedication must be submitted prior to the filing of the final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have not
been addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Your project may be placed on a future agenda once all the revisions have been made and the
appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff
report can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Civil Development,Ltd-Joe Schultz,P.E.via fax 764.7759
Case file#06-00500192
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 1
TRANSMISSION VERIFICATION REPORT
TIME : 09/12/2006 07:14
NAME :
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 09/12 07:14
FAX NO./NAME 96901041
DURATION 00:00:35
PAGE(S) 03
RESULT OK
MODE STANDARD
ECM
• 3. i.‘4.!!!!rt t « CITY OF COLLEGE STATION itsf i." R l''
.?7m �" i
,a!:;,,q. Fr,,,,, Planning el.Development Semites
1101 Texas Avenue,P.O.Box 9960
College Station,Texas 77842
Phone 979.764.3570/Fax 979.764.3496
MEMORANDUM
September 12,2006
TO: DOH Investments Via fax 690.1041
FROM: Jennifer Reeves,Project Manager
SUBJECT: CASTLEROCK pf-L .(FP) -Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been addressed and
the following information submitted by Monday September 18, 2006 by 10:00 a.m.,your project will
be placed on the next available Planning and Zoning Commission meeting scheduled for October 5,
2006 at 7:00 p.m. in the City Hall.Council Chambers, 1101 Texas Avenue.
Two (2) 24"x36"copies of the revised final plat;
Fifteen (15) 11"x17"copies of the revised final plat;
Parkland Dedication must be submitted prior to the filing of the final plat;
One(1)Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
TRANSMISSION VERIFICATION REPORT
TIME : 09/12/2006 07: 16
NAME :
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 09/12 07: 15
FAX NO./NAME 97647759
DURATION 00: 00:33
PAGE KS) 03
RESULT OK
MODE STANDARD
ECM
Grffill1141
CITY Or COLLEGE STAT ONl. . :
Planning Development
orvices
1101 Texas Avenue,P.O.Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 12,2006
TO: DDH Investments Via fax 690.1041
FROM: Jennifer Reeves,Project Manager
SU'BJEC'T': CASTLEROCK PH.1A(FP)- Final Plat
•
-----,
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been addressed and
the following information submitted by Monday September 18, 2006 by 10:00 a.m.,your project will
be placed on the next available Planning and Zoning Commission meeting scheduled for October 5,
2006 at 7:00 p.m.in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2)24"x36" copies of the revised final plat;
Fifteen(15) 11"x17"copies of the revised final plat;
Parkland Dedication must be submitted prior to the filing of the Final plat;
One (1)Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
___ _.. 1 ,
Castlerock Subdivision, Phase 1A
Response to Engineering Comments No. 2 (dated 9/19/2006)
1. Why are the street intersections/connections with Castlerock Parkway not shown in the profiles?
(Stone Shadow Trail, Rock Bend Drive, Rolling Stone Drive)
Response: The plans have been changed to include these intersections.
2. How will you insure that the drainage will not undercut the roadbed on Stone Shadow Trail,
Rock Bend Drive, Rolling Stone Drive, and south end of Rocky Creek Trail?
Response: Each of the locations cited above are places where water runs onto the street from
vacant land adjacent to it. These streets will eventually be extended when future phases of the
subdivision are built. While no one can guarantee that problems will not occur, undercutting of
the new streets is not likely because there is no place for water to flow under the street that
would cause erosion problems. The ends of the street will be backfilled with spoils from the
excavation and sloped gently upward to existing ground to facilitate drainage into the gutters. If
unforeseen problems occur prior to the extension of the streets, remedial measures will be taken
at that time to insure the integrity of the roadway and subgrade.
3. Indicate limits of structural backfill on Storm Pipe 2P3.
Response: The plans have been changed accordingly.
4. Please insure that where there is a change in pipe diameter, the soffit of smaller upstream pipe
shall at least match the soffit of the larger pipe.
Response: We did not see a location where the soffits did not match. If there is a specific
location where this occurs,please advise us do it can be corrected.
5. What is happening at the outlet of Pipe 5P4? What is the grading from roadway to drainage
channel 2?
Response: The plans have been changed to show how the contours accommodate the small flow
coming from the gutter. The intent is to provide a path for water from the gutter to flow down
the channel bank into the larger ditch without causing significant erosion. The large channel
and the small channel will both be removed when the street is extended with Phase 2 of the
subdivision. They will be replaced by inlets and storm drain pipes.
6. Provide protection from erosion on drainage channel over sanitary sewer line where cover is
proposed at 2' (S-1).
Response: The plans have been changed accordingly
7. Provide cross-section of drainage channels. Do you have enough rip-rap at outfall to Channel
No. 1 to reduce the velocity to acceptable range for seeded grass surface treatment?
Response: A cross-section of the channel has been added to the page. Additional rip-rap has
been added as well. The temporary channel will be privately maintained until the street is
extended with future phases of the subdivision. If excessive erosion begins to occur, measures
will be taken by the owner to mitigate the problem.
8. The storm collection system will be considered private south of where street pavement ends.
Response: That is our understanding as well.
9. Please confirm that the TXU gas line is not high pressure. If it is high pressure show
approximate depth. (W-1)
Response: The line is not high pressure. It is the same 6"poly line that serves the C'astlegate
Suhdivsion.
Castlerock Subdivision, Phase 1A— Final Plat
Response to Staff Review Comments No. 1 (dated 9/12/2006)
Planning
Noted.
,_/2. Vicinity map has been corrected.
/3. All utility easements have been labeled on the plat.
/4. All "Greenbelt" or `Buffer Area" labels have been changed to read "Common Area"
so that Note 10 makes sense.
Engineering
1. The CLOMR floodplain has been added to this map, and it is almost identical to the
FEMA FIRM line in this area.
2. The Conservation Easement was developed as a part of the Corps of Engineers
(COE) permitting process for the Crowley Tract and SH 40. All of the state and
federal agencies were involved in this process and the COE permit was approved
with regional detention at the downstream portion of the Crowley Tract, with the
runoff from the developed portions of the Crowley Tract and Castlegate flowing
through the Conservation Easement to the regional detention pond. The issue of
discharging into the Conservation Easement has already been resolved with the COE
permit, the granting of the Conservation Easement, and the dedication of the property
to the City of College Station by Tim Crowley, which specifically gives the upstream
landowners the right to allow their storm water to flow across the Conservation
Easement.
3. Permits will be submitted.
4. A blanket easement application will be submitted for the entire tract.
5. Noted.
,/Electrical
1. The application for the blanket easement will be provided.
2. Noted.
3. Easements have been added per the master plan file for electrical sent by Brent Read.
Some of the requested easements will be added in future phases, but will be covered
under the blanket easement for this phase.
Are
1. There are 30 lots in this phase.
Sanitation
1. Rocky Creek Trail can serve as a turnaround, making a temporary turnaround
Aft
unnecessary.