Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: DOVE CROSSING PH. 3&4 (FP) -06-00500190 PLANNING 1. Metes and bounds do not close.Please contact Sven Griffin with any questions regarding plat closure. 2. The construction documents and reports are still under review and may affect the plat. 3. Add note to plat that Common Areas will be maintained by HOA. If detention ponds are not to be dedicated as Common Areas then also note maintenance responsibility. Reviewed by: Lindsay Boyer,Staff Planner Date: September 7,2006 ENGINEERING 1. Please be aware that with a combined Development Permit for Phases 3 and 4, a single letter of acceptance will be issued for both phases. (One phase will not be accepted without the other.) 2. Oversize participation requires that construction cannot begin until the OP agreement has been approved by City Council. 3. As submitted,your OP request is greater than 30%. 4. Show existing easements with associated volume and page numbers. 5. Off-site easements are required for utilities. Submit easement dedication sheet and associated documents. Reviewed by: Carol Cotter Date: September 11,2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 2. The following easements will be required. - A 15'PUE from back of Lots 21 &22 Block 2 to Dove Hollow Lane. - A 20'PUE from Alexandria Ave through Lots 1 — 13 Block 11 and continuing through Lots 1 —6 Block 13. Half of this 20'will encroach into the alley. - A 15'PUE from back of Lots 2& 3 Block 18. - A 5'PUE in Lot 5 between Lots 5& 6 Block 11 for street light. - A 5'PUE in Lot 10 between Lots 10& 11 Block 11 for street light. - A 5'PUE in Lot 6 between Lots 5& 6 Block 13 for street light. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer,developer to furnish and install conduit as shown on electrical layout. 6. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes& secondary pedestals provided by the city). 7. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido(alcstx.gov 8. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314. NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 Reviewed by: Sam Weido Date: 9-8-06 Sanitation Comments 1. Need to show a temporary turn-around at south-end of Dove Hollow Ln. Reviewed by:Wally Urrutia Date: September 7, 2006 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3