Loading...
HomeMy WebLinkAboutCorrespondence McC- '1RE & BROWNE ENGINEERIY-1SURVEYING, INC. 1008 Woodcreek Drive,Suite 103•College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net September 18, 2006 Ms. Jennifer Reeves, Project Manager Planning & Development Services City of College Station Post Office Box 9960 College Station, TX 77842 Re.: EDELWEISS BUSINESS CENTER (FP) ��e -4 9 ( c._0s, Staff Review Response No. 1 MBESI#: 1000-0080 Dear Jennifer: Below are the summary of the revisions made per staff review comments. PLANNING: (Reviewed by: Jennifer Reeves/Carol Cotter; Date: August 31, 2006) COMMENT#1: Due to fire lane and sanitation routes, the access easement along the northwest property boundary will need to be extended across the 11.5' gap to Lot 9-R. Shared access will also need to be granted between Lot 7R and Lot 8RR for the same reasons. ACTION: This is beyond the limits of this plat and this property owner. Please see attached Joint Access Agreement. COMMENT#2: Show locations of existing water and sewer service lines to the existing lots. Provide private service easements over these lines or note that they are to be relocated and indicate where. / ACTION: The drawing has been revised per this comment. / COMMENT#3: The Vacating Plat on the final version of the document needs to have building and pavement footprints and utility line information removed. ACTION: The drawing has been revised per this comment. ./COMMENT#4: Vacating dissolves current lot designations. Renumber Lots to 8R & 9. ACTION: The drawing has been revised per this comment. /COMMENT#5: Change title to Vacating & Final Plat. ACTION: The drawing has been revised per this comment. COMMENT#6: Please show how the setbacks are being met with the new lot configuration. Particularly the rear setback on Lot 8-RR. ACTION: Please see attached Existing Conditions document. .,COMMENT#7: (FYI) Please be aware that this is considered one building plot for parking and access. ACTION: Duly noted. EDELWEISS BUSINESS CENTER(FP) Page 1 of 2 Staff Review Comments Letter C (kr'111111111 CITY OF COi.i FGE STATION Planning dr Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 11,2006 TO: Jeff McDowell,Southwood West,Via Fax 846.1100 h- e- fAse;,Q8 Tw;(Q I U n • c. FROM: Jennifer Reeves,Project Manager SUBJECT: EDELWEISS BUSINESS CENTER (FP) - Final Plat Staff reviewed the above-mentioned final pl staff review comments detailing items that need to and the following information submitted by Mon. will be placed on the next available Planning and . -r 5, 2006 at 7:00 p.m.in the City Hall Council Cha Two (2) 24"x36"copies of th- Fifteen (15) 11"x17"copies of One (1)Mylar original of the r: One (1) copy of the digital to sgriffm@cstx.gov and awelsh(�,'9 Upon receipt of the required documents for th e considered formally filed with the City of Colleg )t been addressed your project will not be schedul _ _- . . . meeting. Your project may be placed on a future agen.. • e . 1 e revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Mike McClure,McClure&Brown Engineering/Surveying,Inc.via fax 693.2554 Case file#06-00500186 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 TRANSMISSION VERIFICATION REPORT TIME : 09/11/2006 16: 44 NAME : FAX . TEL . SER. # : 000L5J596800 DATE,TIME 09/11 16: 43 FAX NO./NAME 96932554 DURATION 00:00:26 PAGE(S) 02 RESULT OK MODE STANDARD ECM (1111:*,"114 7" �Z C Or COLLEGE STATION R•,9!!Inµ . .. .,,,r ,rmR Pbuthing cO,Development Semite, -,-;gin• .. 1101 Texas Avenue,P.O.Box 9960�F4 College Station,Texas 77842 Phone 979.764-3570 /Fax 979.764.3496 MEMORANDUM September 11,2006 TO: Jeff McDowell,Southwood West,Via Fax 846-1100 FROM: Jennifer Reeves,Project Manager SUBJECT: EDELWEISS BUSINESS CENTER(FP)-Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed-If all comments have been addressed and the following information submitted by Monday September 18, 2006 by 10:00 am your project will be placed on the next available Planning and Zoning Commission meeting scheduled for October 5, 2006 at 7:00 p.m.in the City Hall.Council Chambers, 1101 Texas Avenue. Two (2)24"x36"copies of the revised final plat; Fifteen (15) 11"x17' copies of the revised final plat; One (1)Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or c-mail to sgriffm@cstx.gov and awelsh@cstx.gov,