HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: CULPEPPER PLAZA ADDITION (FP) -06-00500183
PLANNING
1. What is your intent for Lot 14? Rather than call it a lot, please label Lot 14 as a Common Area to be
maintained by a Property Owners Association.
2. Please provide a copy of the cross-access and parking agreement for the entire shopping center.
3. Please be aware that the proposed lot line between Lot 14 and the drive-thru for Burger King and the lot
line between Lot 4 and Souper Salad will create a setback encroachment. This means that the structures
will need to be removed before the final plat is approved or the lot line will need to be relocated, where
appropriate. Please adjust accordingly.
Reviewed by: Crissy Hard Date: August 28, 2006
ENGINEERING COMMENTS NO. 1
1. The area on the plat labeled as Zone X should be labeled as Zone AE. Please change Note 3 accordingly.
2. Please label the hatched area on the plat as Floodway. Please change Note 3 accordingly.
3. Please remove notation of future easement abandonment. This re-plat should only reflect existing
conditions.
4. Lot 14 does not have public water and sanitary sewer,please address.
Reviewed by: Josh Norton Date: August 28,2006
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines If applicable the
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on
electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
sweido@cstx.gov
9. Developer provides load data for project.
10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314.
Reviewed by: Sam Weido Date: 8-23-06
SANITATION COMMENTS
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 24,2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 2
STAFF REVIEW COMMENTS NO. 1
Project CULPEPPER PLAZA ADDITION (H-')-06-00500183
PLANNING
1. What is your intent for Lot 14? Rather than call it a lot, please label Lot 14 as a Common Area to be
maintained by a Property Owners Association.
2. Please provide a copy of the cross-access and parking agreement for the entire shopping center.
3_ Please be aware that the proposed lot line between Lot 14 and the drive-tbru for Burger King and the lot
line between Lot 4 and Souper Salad will create a setback encroachment. This means that the structures
will need to be removed before the final plat is approved or the lot line will need to be relocated,where
appropriate. Please adjust accordingly.
Reviewed by: Crissy Hard Date: August 28,2006
ENGINEERING COMMENTS NO.1
1. The area on the plat labeled as Zone X should be labeled as Zone AE. Please change Note 3 accordingly.
2. Please label the hatched area on the plat as k1oodway. Please change Note 3 accordingly.
3. Please remove notation of future easement abandonment. This re-plat should only reflect existing
conditions.
4. Lot 14 does not have public water and sanitary sewer,please address.
Reviewed by: Josh Norton Date: August 28,2006
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines If applicable the
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation_
3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on
electrical layout.
6. Developer pours transformer pads) per city specs and design.
7. Developer installs pull,boxes as per city specs and design.(pull boxes provided by the city).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
sv,r&iiloCte,s_tx4sa
9. Developer provides load data for project.
10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314_
Reviewed by:Sam Weido Date; 8-23-06
SANITATION COMMENTS
1. Sanitation is ok with this project
Reviewed by: Wally Urrutia Date: August 24,2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed oout
to the City,will constitute a completely new review.
gh576:)C
CCJecrrtiv 1012 .�.fr.e—+
SOP for PAC Meeting
o Platted Property
o Zoning/Land Use—Existing and Proposed
?
o Drainage Report L Lz: Mr: i3A R JL sl"'`'�y
o n 9 to
o Fire Flow Report
o Label Fire Lane
o Hydrant Location
o Bldg Type, Square Feet, Sprinkled
o Water/Sewer Demands
o Storm Sewer—Junction Boxes
o Watere—_Sae, " fit- ucc.fz-
❑ Sewer ;•=t.
— ;t. 44 r�
❑ Meters (Domestic and Irrigation)—Size, Location, w/in Easement
o Label Existing Easement
o Label Existing Mains
o Thoroughfares
o Easement Abandonment ---'7 nzcej
o TxDOT Permits—Access, Utility ,7
o Utility Master Plan 0 DC
a '""''
o Impact Fee (LOA&
K- &,), S, , ..c@7
CAL
-c- t Z
K/61 CaufP g 1 S
V 7NI - Ce
� t, - wpNr'
DSgWitiftrrg* (17 "
Q- icK st,c5Ci - dwvqr -Gofv51- (LLf
9`(/ JD 94, f Mpw4/ Ctj,saci �
M .Nd J D 7 - ( (-7c c117Pte(MPOwing8 Y
A NAY& V12'( '/t11 Utas
— C g Z 1444 L ( C3F S — Co (3Tk M 6 ,)
Culpepper Plaza Addition Final Plat
This item is for consideration of a Final Plat and Replat for the
Culpepper Plaza Addition located on Texas Avenue between
Harvey Road and Dominik Drive. The owner is subdividing
the 4 existing lots into 6 lots for a redevelopment project that
will include revitalizing the existing shopping center and the
development of a new structure for a department store. The
property will continue to have access from all of the existing
driveways off of Texas Avenue, George Bush Drive East and
Dominik Drive and will not be provided additional access
points from the Texas Avenue widening project.
The Land Use Plan designates this area as Redevelopment
and Floodplain and Streams. In April of this year, the Council
approved the Redevelopment District Overlay in addition to
the existing C-1 General Commercial zoning for this property.
The RDD overlay is intended to facilitate the redevelopment of
commercial centers through flexible standards.
The Thoroughfare Plan identifies George Bush Drive east as a
minor arterial and Harvey Road and Texas Avenue as major
arterials. Portions of Dominik Drive are also identified as
minor arterial, but the segment that bounds the subject
property is not classified.
This Final Plat - Replat for the Culpepper Plaza Addition is in
compliance with the Comprehensive Plan and meets all
minimum standards of the Subdivision Regulations; therefore,
staff recommends approval.
The Commission has final authority over the final plat and