Loading...
HomeMy WebLinkAboutCorrespondence CITY OF COLLEGE STATION Planning dr Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September8,2006 TO: Stewart Kling,Kling Engineering via fax 979.846.8252 FROM: Lindsay Boyer,Staff Planner SUBJECT: CRESCENT POINTE PH 2-5 (PP-AMENDING) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. One (1) Mylar original of the revised preliminary plat;and, One (1) copy of the digital file of the preliminary plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: John Hamilton, Crescent Pointe Holdings via fax 979.846.0783 Jane Kee,IPS Group,via email jane@ipsgroup.us Case file#06-00500179 NOTE: Any changes made to the plane',that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plant.Any additional changes on these plans that hate not been pointed out to the City,will constitute a completely nem retiew. 1 of 2 CITY OF Col T FGE STATION Planning d Development Senrica 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 25,2006 TO: Stewart Kling,Kling Engineering via fax 979.846.8252 FROM: Lindsay Boyer,Staff Planner SUBJECT: CRESCENT POINTE PH 2 (FP-REPLAT)- Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Wednesday, August 30th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, September 7th, 7:00 p.m.in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36"copies of the revised final plat; Fifteen (15) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov;and Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled fora Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: John Hamilton, Crescent Pointe Holdings via fax 979.846.0783 V Jane Kee,IPS Group,via email jane@ipsgroup.us z� Case file#06-00500179 KLING ENGINEERING £t SURVEYING J6 �i l� Consulting Engineers • Land Surveyors `-��,f�� 4101 Texas Avenue, Suite A G `1 P.O. Box 42344 IC�� Bryan,Texas 77802 Tel.979/846-6212 Bryan,Texas 77805 Fax 979/846-8252 TO: City of College Station - Development Services DATE: August 30, 2006 PROJECT NO.: PROJECT NAME: Crescent Pointe Subdivision Prelim Plat, Final Plat Ph3, Final & Replat Ph2 ATTENTION: Bridgette George REFERENCE: WE TRANSMIT: THE FOLLOWING: FOR: ❑ Under Separate Cover 0 Prints /Your Review&Approval / Enclosed 0 Copies 0 Your Review Et Comment /Originals /Your Review&Distribution VIA: / Plat 0 Your Review, Revision Er Return ❑ Mail 0 Field Notes 0 Your Signature Et Return ✓ Messenger 0 Plans ✓Your File and/or Use ❑ Federal Express 0 Report 0 For Filing at the Courthouse ❑ Lone Star Overnight 0 Estimate ❑ UPS 0 Cut Sheets 0 As Requested By: ❑ Special Courier 0 Computer Printout 0 Please Acknowledge Receipt of O Picked Up By Your Office 0 File Enclosures 0 Contract 0 Please Return Enclosures To 0 Other- Invoice 0 Copies Of This Letter Of Transmittal Sent To: NO. DESCRIPTION 2 Preliminary Plat (24"x36") Copies ur_, 1 Preliminary Plat (24"x36") Mylar-- 15 Preliminary Plat (11"x17") Copies U., If Enclosures Are Not As Noted Please Notify Us At Once. 2 Final Plat& Replat Phase 2 (24"x36") Copies 1 Final Plat & Replat Phase 2 (24"x36") Mylar 15 Final Plat & Replat Phase 2 (11"x17") Copies cr., { 1 Final Plat Phase 3 (24"x36") Mylar Signed: Fred Paine .E. 1 Response Letter I: 1'i..ING ENGINEERING & SURVEYIiNG Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Post Office Box 4234 Bryan, Texas 77802 Bryan, Texas 77805 Telephone 979/846-6212 Fax 979/846-8252 B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Memo: August 30, 2006 To: City of College Station, Development Services c/o Lindsey Boyer From: Fred Paine, P.E. Re: Crescent Point . i inary Plat, Final Plat & Replat Phase 2, & Final Plat Phase 3 The following is in response to the August 25, 2006 City of College Station review: Preliminary Plat Planning 1. No metes & bounds on preliminary plat. Lot lines check & all lots close. Electrical Issues to be addressed by Owner/Developer Final Plat & Replat Phase 2 Planning 1. Metes & bounds were revised as needed 2. Block 1 Lot lines added 3. Acknowledged Final Plat Phase 3 1. Acknowledged Page 1 of 2 Lindsay Boyer - Fwd: Crescent Pointe From: Lindsay Boyer To: fred@klingeng.com; jane@ipsgroup.us; John Hamilton; stewart@klingeng.com Date: 8/15/2006 4:01 PM Subject: Fwd: Crescent Pointe CC: Josh Norton; Molly Hitchcock Fred, In my email dated August 3rd, I asked that a new application be filed and fees be paid for the Preliminary Plat. I am including that text as an attachment, for your reference. These are changes to an already approved preliminary plat and we consider this to be a new project. We needed the fee, application and copies in our office by Monday August 7th, so that everything could remain on schedule. Because these were not provided, the project could not be distributed outside the department for review as a new project. As it stands now, the preliminary could not be distributed until the next deadline on August 21st if it makes that deadline, and by the time we received verification from all the other departments who all have 5 working days to return any comments to us, the agenda will have already been set and reviewed for September 7th meeting. In addition, all of the items were due to us by 10 am on August 7th, which was not met for the items that were turned into us. I am available Thursday afternoon if there are any outstanding questions, or to discuss timelines. I understand the time sensitivity associated with this project, and I do apologize if I was unclear in my previous email as to what was required to remain on schedule. Thanks, Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station,Texas 77840 (979) 764-3570/ (979) 764-3496 Fax Iboyer@ cstx.gov www.cst X.gov >>> "Fred Paine" <fred@klingeng.com> 8/15/2006 12:31:17 PM >>> Lindsay, We would like to set up a meeting with you at your earliest possible availability regarding the recent comments for the Preliminary Plat, Final &Replat(previously submitted as an Amending Plat) Phase 2. Specifically, our August 01 submittal of the Preliminary Plat should allow it to be scheduled for September 07 with no other applications or fees. As this was the third submittal, we were still operating under the January 2006 application and fees. If the Preliminary Plat is not scheduled for the September 07 meeting, please explain. Thanks, Fred Paine, P.E. KLING ENGINEERING &SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Telephone 979/846-6212 file://C:\Documents and Settings\lboyer.CSTX\Local Settings\Temp\GW}00001.HTM 8/17/2006 Page 2 of 2 Fax 979/846-8252 Original Message From: Lindsay Boyer To:janena.ipsgroup.us ; John Hamilton ; fredklingeng.com ; stewarte.klingeng.com Cc: Josh Norton ; Molly Hitchcock Sent: Monday, August 14, 2006 4:01 PM Subject: Crescent Pointe Stewart, Fred, Jane, and John, Josh and I were reviewing the Crescent Pointe plats today and came across a few items that must be addressed before any of the items can move forward. 1) We did not receive an application, fees, or the required 13 copies of the preliminary plat on Monday in order to schedule the preliminary for the September 7 P&Z Meeting. Because the copies were not provided, they were not distributed out for review and only Planning and Engineering review was completed. 2) We also did not receive the fee difference between the amending plat and a replat for Phase 2. An additional $300 is required. I am attaching the comments for all three projects (Amended Preliminary, Ph 2 Final Plat-Replat, and Ph 3 Minor Plat). Please see the comments for number of copies to be provided and dates for those plats. Let me know if you have any additional questions. Thanks- Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station, Texas 77840 (979) 764-3570/ (979) 764-3496 Fax lboyerftcstx.gov www.Csbc.gov College Station. Heart of the Research Valley. file://C:\Documents and Settings\lboyer.CSTX\Local Settings\Temp\GW}00001.HTM 8/17/2006 Page 1 of 2 Lindsay Boyer - Crescent Pointe From: Lindsay Boyer To: fred@klingeng.com; jane@ipsgroup.us; John Hamilton; Natalie Ruiz; stewart@klingeng.com Date: 8/3/2006 4:40 PM Subject: Crescent Pointe CC: Bridgette George; Carol Cotter; Josh Norton Stewart, Fred, Jane, and John, These are the very preliminary comments regarding the items submitted from Crescent Pointe.They will be included in the formal comments you will receive on August 14th, however some of them affect the timing of the plats approval by p&z because of the preliminary plat, so we wanted to get them to you before I left on vacation. Please be aware that this is NOT a complete review and further comments from electrical, etc will be provided on August 14th. Revised Preliminary Plat • We need an application, fees, and copies by Monday for this to make the Sept 7 consent agenda. • All drainage facilities should be noted as Common Area - Private Drainage Facilities. The subdivision regulations do not allow the platting of unbuildable lots. Additionally anything labeled as a lot will require access and the extension of public infrastructure to the lot. Please identify all common areas by letter, A, B, C, etc. Please be consistent in the naming of the drainage facilities throughout the plans, as well as any applicable notes, and construction documents. • Note 9 should reflect "Common Area - Private Drainage Facilities shall be maintained by the Crescent Pointe Property Owners Association." • All changes reflected on the Ph 2 and Ph 3 as result of the following comments should be reflected on the Preliminary Plat. • There is a 20 foot private drainage easement located on Block 2, Lot 8 of Phase 5. Please verify your intent as this was not what was previously discussed. • Please provide a note describing the maintenance responsibility for any plat that has a private drainage easement on it. • For the staff, would it be possible to provide a set of 11 x 17 sheets showing each phase of the preliminary shaded, ie, a sheet showing Phase 2 shaded, another sheet showing Phase 3 shaded, etc? It would greatly help us identify phasing while processing the plat. Thanks! Amending Plat • This plat includes the resubdivision of previously platted property (Block 1, Lots 1 and 2 which are now shown as Lots 1, 2, 3, and 4 should be noted as Lots 1, 2R, 3R, and Common Area - Private Drainage Facility), as well as the subdivision of previously unplatted property (Block 2 Lot 5A which should be identified as Common Area - Private Drainage Facility), therefore this plat is a Final Plat of Common Areas X, Y, and Z (please identify common areas by a letter), and a Replat of Block 1, Lots 1 and 2, Block 2, Lots 1, 3, 5, and 9, and Block 3, Lots 1, 5, and Park. • Please remove note 7 • Amend note 8 to identify that the Common Areas - Drainage Facilities will be maintained by the Crescent Pointe Property Owners Association. • The changes must be approved to the Preliminary Plat before the Final Plat and Replay can go forward. • The drainage facility that was located on Block 2, Lot 3 is no longer on the plat. It appears to have been changed on the Preliminary as well, but please verify that the intent is to relocate this facility. • Please provide Volume and Page number for the PUE located on proposed Block 2, Lot 4, Phase 4. • Please correctly identify the 20 foot public drainage easement located on the Park property on Block 3. file://C:\Documents and Settings\lboyer.CSTX\Local Settings\Temp\GW}00002.HTM 8/17/2006 Page 2 of 2 • Please tie the plat to a College Station monument. • Correct the Metes and Bounds in Page 6, they do not properly reflect the lot and common area names that are now included in this plat. • Please verify that coversheet reflects correct names. • There is a 20 foot private drainage easement located on Block 2, Lot 8 of Phase 5. Please verify your intent as this was not what was previously discussed. • Please provide a note describing the maintenance responsibility for any lot that has a private drainage easement on it. Final Plat- Phase 3 • Provide metes and bounds and tie plat to a College Station monument. • Please rename lots to reflect Common Area - Private Drainage Facility. • Correct note 5 to reflect Common Area-Private Drainage Facility shown on this final plat will be maintained by the Crescent Pointe POA. • Remove notes 4 and 6. • This will be processed as a Minor Plat. Please let me or Josh know if you have any questions. The biggest issue at this point is getting the Preliminary Plat application and copies into our office by Monday at 10 so that everything can stay on schedule, everything else seems to be just notation issues that just need to be corrected. I will be out next week, but back on the 14th. Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station, Texas 77840 (979) 764-3570/ (979) 764-3496 Fax Iboyer(acstx.gov www.cstx.gov file://C:\Documents and Settings\lboyer.CSTX\Local Settings\Temp\GW)00002.HTM 8/17/2006 0(01/2/ KLING ENGINEERING & SURVEYING ( (�/n Consulting Engineers• Land Surveyors � a1 " 10 4101 Texas Avenue, Suite A Email: stewart@klingeng.com P.O. Box 42'4/ Bryan, Texas 77802 Tel. 979/846-6212 Bryan, Texas 77805 Fax 979/846-8252 TO: City of College Station DATE: August 21, 2006 PROJECT NO.: PROJECT NAME: Preliminary Plat- Crescent Pointe ATTENTION: Lindsay Boyer REFERENCE: WE TRANSMIT: THE FOLLOWING: FOR: ❑ Under Separate Cover ❑ Prints /Your Review&Approval f Enclosed f Copies ❑ Your Review& Comment ❑ Originals ❑Your Review& Distribution VIA: ❑ Plat ❑Your Review, Revision & Return O Mail ❑ Field Notes ❑ Your Signature & Return d Messenger 0 Plans ❑ Your File and/or Use ❑ Federal Express ❑ Report ❑ Lone Star Overnight ❑ Estimate ❑ As Requested By: ❑ UPS El Cut Sheets ❑ Special Courier ❑ Computer Printout ❑ Please Acknowledge Receipt of ❑ Picked Up By Your Office ❑ File Enclosures ❑ Contract ❑ Please Return Enclosures To f Other-Application/Fee ❑ Copies Of This Letter Of Transmittal Sent To: NO. DESCRIPTION 13 Preliminary Plat (revised per Aug. 14 comments) 1 Application and $400.00 filing fee If Enclosures Are Not As Noted Please Notify Us At Once. Signed: S. M. Kling