Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 2 Project: CRESCENT POINTE PH 2-5 (PP-AMENDING) -06-00500179 PLANNING 1. Calls still do not close. Sven Griffin,Mapping Coordinator has identified the following problems: • On page 4 of 9: clarify C11 call • On page 5 of 9: missing call between S07D25'56"E-418.43' &S45D38'16"E-295.78 • On page 6 of 9: scale is incorrect and several calls are missing around the boundary and internally or need clarification. Please contact him at 764-3570 if you have any additional question. Reviewed by: Lindsay Boyer,Staff Planner Date: September 6, 2006 NOTE: Any changes made to the plan.,that hare not been requested by the City of College Station,must be explained in your next transmittal letter and`bubbled"on your plane.Any additional changes on these plans that hate not been pointed out to the City,will constitute a completely new retiem. 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: CRESCENT POINT PH 2 (PP-REVISED) - 06-00500179 PLANNING 1. Metes and bounds do not close on all of the areas except Lot 3R (Block 2),Lot 1R(Block 3),and Lots 2, 3,7,and Common Area A (Block 3). Reviewed by: Lindsay Boyer/Josh Norton Date: August 25,2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido(a,cstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 8-23-06 Sanitation Comments 1. Sanitation is ok with this Project. Reviewed by: Wally Urrutia Date: August 24,2006