Loading...
HomeMy WebLinkAboutStaff Comments CSTAFF REVIEW COMMENTS NOi Project: OAKLAND RIDGE (PP) -06-00500178 PLANNING 1. Please remove the"Condominiums"and"Future Commercial Tract"label on the respective lots. 2. Please label the detention pond a"Common Area." 3. In our conversation, I said that we would not need a mylar, but I was mistaken. Please provide a mylar with your last submittal. Reviewed by: Crissy Hard&Josh Norton Date: September 8,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 9 Staff Review Comments—No. 1 Oakland Ridge (PP)—06-00500178 PLANNING 1. Please remove `Master' from the title block as we do not have Master Preliminary Plats anymore. This would be considered a Preliminary Plat. 2. Please show the city limit lines on the vicinity map. 3. Please provide ownership information for the Las Palomas subdivision. 4. Provide a list of proposed land uses by phase on the plat. 5. Show all proposed easements as required by all appropriate entities. 6. Please give the future condominium and commercial tract a lot and block number. Reviewed by: Crissy Hartl and Jason Schubert Date: August 23,2006 BTU COMMENTS 1. Need to show a note granting a 20' electric easement or PUE centered on all interior lot lines. 2. Need to show a note granting a 20' PUE along outer perimeter of development. A 16' PUE along all public ROW is sufficient. 3. Need to show a note using the following language granting a "5' wide easement for anchors and guy wires necessary to help support overhead utility lines. Easement will extend 20' beyond any utility easement." 4. All existing electrical lines need to be shown on each plat. Also show the volume and page number of any electric line easements. 5. Please ask the developer to call BTU Line Design at 821-5770 at least 150 days before power is needed to begin the process for providing power to the area. Reviewed by: Randy Trimble Date: August 28,2006 ENGINEERING COMMENTS NO. 1 1. Please state the intent for each proposed utility on the preliminary plat. Specifically state provider and relative requirements. For example,Wellborn water for domestic and fire flow, pending fire flow report proving minimum CoCS fire flow standards. FYI - City of College Station — City Council granted this development permission to extended public sanitary sewer in the ETJ on July 27,2006. 2. The detention area should be platted as a common area and it should be noted that it will be maintained by a specific home owners association. Reviewed by: Josh Norton Date: August 25, 2006 BRAZOS COUNTY COMMENTS NO. 1 1. The following issues need to be addressed and may require variances: a. Lot size less than 1 acre b. Lot width less than 70-ft c. ROW width less then 70-ft d. Provide 10-ft PUE for side lot lines e. Alley width and ROW Reviewed by: Gary Arnold Date: August 25,2006 0 0 SANITATION COMMENTS 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: August 24,2006