September 12,2006
TO: BCS Development Company,via fax 979.630.0348
FROM: Lindsay Boyer and Jason Schubert
SUBJECT: SOUTHERN TRACE PH. 2 (PP) - Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, September 18th, 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for October 5th, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Two (2) 24"x 36" copies of the revised preliminary plat;
Fifteen (15) 11"x 17" copies of the revised preliminary plat;
One (1) Mylar original of the revised preliminary plat;and,
One (1) copy of the digital file of the preliminary plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov;and
Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered
formally filed with the City of College Station. Please note that if all comments have not been addressed,your
project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be
placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following
web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dale Browne,McClure&Browne Engineering/Surveying via fax 979.693.2554
Case file#06-00500174
fir,.
iu
CITY OF COLLEGE STATION ,,,, �-
w; Planning d Development Services
1101 Texas Avenue,P.O Box
9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 28,2006
TO: BCS Development Company,via fax 979.630.0348
FROM: Jason Schubert,Staff Planner
SUBJECT: SOUTHERN TRACE PH. 2 (PP) -Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Tuesday, September 5, 10:00 a.m.,your project will be placed on the next available
Planning and Zoning Commission meeting scheduled for September 21, 7:00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
Two (2) 24"x 36" copies of the revised preliminary plat;
Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered
formally filed with the City of College Station. Please note that if all comments have not been addressed,your
project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be
placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following
web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dale Browne,McClure&Browne Engineering/Surveying via fax 979.693.2554
Case file#06-00500174
McC JRE & BROWNE ENGINEERI :/SURVEYING, INC.
iliii 1 1008 Woodcreek Drive.Suite 103 •College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net P \f��
q
1,\ co
TRANSMITTAL LETTER
TO: Ms. Lindsay Boyer DATE: September 18, 2006
Project Manager
City of College Station
P.O. Box 9960 RE: Southern Trace,
College Station, Texas 77842 Phase 2 (PP)
Phone: (979) 764-3570 PRJT No.: 1053-0007
Fax: (979) 764-3496
ATTACH. DESCRIPTION
2 each 24"x36" copies of the Revised Master Plan
15 each 11"x17" copies of the Revised Master Plan
1 each Response to Staff Review (, )
-
yy3o
lix / i (/ .$)
THESE ARE BEING SENT:
® At your request ❑ For yc ZOL--, Mail-0.11----'
0 Per our conversation
❑ For your signature 0 For ft, 0 Per contract
❑ For your approval 0 For review and comment 0 For your use
❑ For 0 At request of 0 Original will follow by mail
REMARKS:
One (1) Mylar original of the revised Preliminary Plat will be submitted when the plat has
been approved. One (1) copy of the digital file has been emailed to Sven Griffin.
If you have any questions or need any additional information, please e a ' •t hesitate to call.
Copy to: Signed: _NI,1 : i --
- i' Robertson, P.E.
Vi
F:11053-Randy French10007-Southern Trace\Correspondence\COCS-Boyer02-TLetter.wpd
Mc( URE & BROWNE ENGINEERI" /SURVEYING, INC.
I 1008 Woodcreek Drive,Suite 103•College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net
ii III
September 18, 2006
Lindsay Boyer& Jason Schubert
Planning & Development Services
City of College Station
Post Office Box 9960
College Station, TX 77842
Re.: Southern Trace, Phase Two (PP)
Staff Review Response No. 2
MBESI#: 1053-0007
Dear Lindsay & Jason:
Below are the summary of the revisions made per staff review comments.
PLANNING: (Reviewed by: Lindsay Boyer/Jason Schubert/ Date: Sept. 12, 2006)
COMMENT#1: Regarding the 20 foot buffer along the southern property edge, this is a
condition of the rezoning ordinance and must be met before this plat can
move forward. If it is your intention to remove this area from the buffer
requirement of the ordinance, a rezoning application should be submitted and
must be processed and approved by City Council before this plat can move
forward...
ACTION: The preliminary plat has been adjusted to provide a 20' buffer along this
property line.
ENGINEERING: (Reviewed by: Josh Norton; Date: Sept. 11, 2006)
COMMENT#1: FYI — there appears to be in two locations storm discharge points in Common
Area 2. Please verify that these storm drains are located within PUE or PDE if
the intent is for them to be public.
ACTION: Drainage easements have been added to the preliminary plat.
COMMENT#2: Also, what are the previously mentioned discharge points, discharging into?
The existing Common Area 2 is already experiencing extensive erosion
problems.
ACTION: Any erosion problems near the proposed outlets will be addressed in the
construction plans.
If you have any questions or additional comments, please do not hesitate to let me know.
Sincerely,
J4;L. `t•C ertson, P.E.
Southern Trace, Phase Two(PP) Page 1 of 1
City Comment Response Letter
& : Mc' URE & BROWNE ENGINEERP'1/SURVEYING, INC.
DlIll1008 Woodcreek Drive,Suite 103••College Station,Texas 77845
(979)693-3838••Fax:(979)693-2554••Email:McClureBrowne@Verizon.net4
. ----,00
September 1, 2006 ' . '
Mr. Jason Schubert
Planning & Development Services
City of College Station
Post Office Box 9960
College Station, TX 77842
Re.: Southern Trace, Phase Two (PP)
Staff Review Response
MBESI#: 1053-0007
Dear Jason:
Below is themmary of the revisions made per staff's comments.
PLA ING: (Reviewed by: Jason Schubert/Lindsay Boyer; Date: August 25, 2006)
:COMMENT#1: Provide vegetative buffer along all southern boundaries of the property,
including the shared property line with Wellborn Road Joint Venture. Roads
may stub-out into the buffer area.
ACTION: A note marking the vegetative buffer along the south property line has been
added to the plat. The owner of the Wellborn Road Joint Venture tract does
not wish to have the buffer along the shared property line. He is to write a
'COMMENT
letter indicating this. A copy will be provided to the City.
#2: Several lots do not meet minimum lot size requirements for R-1. Specifically,
Block 6, Lots 4, 5, 6, 9, 10 and Block 9, Lot 6. Lots 6 & 7 on Block 7 need
further clarification of lot width at the building setback line...
ACTION: This property is to conform to UDO Article 8, Section 8.3 (cluster
development) which allows for smaller widths. A note to this effect has been
added to the drawing.
Ai
�OMMENT#3: Provide P.U.E.'s in accordance with the subdivision regulations, Section 8-I.
M+AACTION: The drawing has been revised per this comment.
R%' , 1
I
' COMMENT#4: Provide the block length for McFarland Drive for block length verification.
ACTION: The drawing has been revised per this comment.
''COMMENT#5: Identify maintenance responsibility for the Private Access Easements.
ACTION: See General Note #4.
COMMENT#6: FYI: Sanitation has verified that trash pickup will be from the front of the lots.
ACTION: Duly noted.
`-'COMMENT#7: Jeanne Drive connection to SH 40 will require a TxDOT driveway permit.
ACTION: Duly noted.
Southern Trace,Phase Two(PP) Pagc 1 of 3
City Comment Response Letter
0
TxDOT: (Reviewed by: Karl Nelson; Date: August 28, 2006)
COMMENT#1: Access driveways to SH 40 must meet TxDOT's current "Regulations for
Access Driveways to State Highways."...
ACTION: Duly noted.
ENGINEERING: (Reviewed by: Josh Norton; Date: August 25, 2006)
C MfQ ENT#1: Please extend the Wellborn Rd ROW through SW corner of the development.
L ACTION: The drawing has been revised per this comment.
‘,.,C-01VIMENT#2: Please extend a 30-ft PUE through the SW corner of the development for
future extension of the existing utilities.
ACTION: The drawing has been revised per this comment.
101c?1MENT#3: The water main stubbed out at Southern Breeze Dr should be extended
parallel to SH 40 via this subdivision & the intersection of Jeanne Dr & SH 40.
ACTION: The drawing has been revised per this comment.
MENT#4: The turn around on McLaren Dr. should be 50-ft ROW and 27 ft pavement
widths. The turn around should have a 50 ft turning radius.
ACTION: The lane widths have been increased to 27'. The turning radius on the
pavement is 40'with a 50'ROW to match a typical residential cul-de-sac.
COMMENT#5: Please provide PUE along southern property line.
�, V ACTION: The drawing has been revised per this comment.
C MENT#6: Please provide PUE between the rear lot lines of Block 8.
ACTION: The drawing has been revised per this comment.
COMMENT#7: Please provide PUE between the rear lot lines of Block 7.
ACTION: The drawing has been revised per this comment.
CMMENTlease submit TxDOT permit for Jeanne Drive connection to SH 40.
ACTION: permit application will be submitted with the final plat.
CO ENT#9: It appears that the sanitary sewer manhole located in the elbow of McLister
✓- Drive needs a PUE.
ACTION: The drawing has been revised per this comment.
C ENT#10: It appears that the proposed sanitary sewer main extension across McFarland
Drive and to the southern property line needs a PUE.
ACTION: The drawing has been revised per this comment.
COMMENT#11: FYI – it appears that the 8" sanitary sewer main through Common Area 2 does
not exist, please label as proposed.
ACTION: The sanitary sewer has been re-routed to Southern Way Drive.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION:
COMMENT#1: Developer provides temporary blanket easement for construction purposes.
ACTION: Duly noted.
Southern Trace, Phase Two(PP) Page 2 of 3
City Comment Response Letter
r‘ r
COMMENT#2: Developer provides easements for electric infrastructure as installed for
electric lines (including street lights.)
ACTION: Duly noted.
GENERAL ELECTRICAL COMMENTS: (Reviewed by: Gilbert Martinez; Date: August 24, 2006)
COMMENT#1: Developer installs conduit per city specs and design.
ACTION: Duly noted.
COMMENT#2: City will provide drawings for conduit installation.
ACTION: Duly noted.
COMMENT#3: Developer provides 30' of rigid or LMC conduit for riser poles. City installs
riser.
ACTION: Duly noted.
COMMENT#4: Developer to intercept existing conduit at designated transformers and extend
as required.
ACTION: Duly noted.
COMMENT#5: If conduit does not exist at designated transformer, developer to finish and
install conduit as shown on electrical layout.
ACTION: Duly noted.
COMMENT#6: Developer installs pull boxes & secondary pedestals as per city specs and
design. (Pull boxes & secondary pedestals provided by the city.)
ACTION: Duly noted.
COMMENT#7: Developer provides digital AutoCAD 2000 or later version of plan and/or site
plan email to gmartinez@cstx.gov.
ACTION: Duly noted.
COMMENT#8: Developer provides load data for project.
ACTION: Duly noted.
COMMENT#9: To discuss any electrical comments, please contact Gilbert Martinez.
ACTION: Duly noted.
SANITATION: (Reviewed by: Wally Urrutia; Date: August 24, 2006)
COMMENT#1: Sanitation is ok with this project.
ACTION: Duly noted.
If you have any questions or additional comments, please do not hesitate to let me know.
Sincerely,
/ )..
L
J=� -ry . R b on, P.E.
i
Southern Trace, Phase Two(PP) Page 3 of 3
City Comment Response Letter