HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: CASTLEROCK(PP-REVISED)-06-00500167
PLANNING
1. The metes and bounds do not close. Please contact Sven Griffin, at 764-3570.
Reviewed by: Jennifer Reeves Date: August 10, 2006
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric
lines (including street lights).
3. If applicable the following easements will be required.
4. Due to a 6 — 9 month delay in transformers, any changes or modifications to the plat
need to be relayed to College Station Utilities as soon as possible.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and install
conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes & secondary pedestals as per city specs and
design.(pull boxes & secondary pedestals provided by the city).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan
email to bread(a�cstx.gov
9. Developer provides load data for project.
10. To discuss any of the above electrical comments, please contact Brent Read at
979-764-5026.
Reviewed by: Brent Read Date: August 10, 2006
FIRE
1. no comments
Reviewed by: Steve Smith Date: 08/14/2006
Sanitation Comments
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 10, 2006