HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: CASTLEROCK(PP-REVISED)-06-00500167 PLANNING 1. The metes and bounds do not close. Please contact Sven Griffin, at 764-3570. Reviewed by: Jennifer Reeves Date: August 10, 2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. If applicable the following easements will be required. 4. Due to a 6 — 9 month delay in transformers, any changes or modifications to the plat need to be relayed to College Station Utilities as soon as possible. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to bread(a�cstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments, please contact Brent Read at 979-764-5026. Reviewed by: Brent Read Date: August 10, 2006 FIRE 1. no comments Reviewed by: Steve Smith Date: 08/14/2006 Sanitation Comments 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: August 10, 2006