HomeMy WebLinkAboutCorrespondence From: Charles McLemore
To: Alan Gibbs
Date: 8/15/2006 10:55:31 AM
Subject: Fwd: Re: Tauber Street ROW
FYI
>>> Carla Robinson 08/15/06 10:48 AM >>>
Terry- Here is the revised ordinance. As I understand it, Radakor is going to install the new sewer line
and dedicate an easement to the city as part of the EDA. This abandonment is not related to the new
sewer installation. If the ordinance is okay, I'll accept the changes and esign it. Thanks. Carla
Carla A. Robinson
Senior Assistant City Attorney
City of College Station
Phone: (979) 764-3507
Fax: (979) 764-3481
This e-mail and/or attachment is for the sole use of the intended recipient(s) and may contain confidential
and/or legally privileged information. Any unauthorized review, use, disclosure or distribution is
prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all
electronic and paper copies of the original message and any attachments. Thank You.
>>> Terry Childers 08/14/06 2:04 PM >>>
I was correct in saying we have no utility infrastructure in the ROW abandonment. So we need to adjust
the ordinance to reflect that.
Terry Childers
Interim Assistant City Manager
City of College Station
P. O. Box 9960
College Station, Texas 77842
(979) 764-3510
tchilderscstx.gov
From: Cheryl Turney
To: Alan Gibbs
Date: 11/22/2006 8:43:42 AM
Subject: Re: Fwd: Bidding for Tauber Street Sanitary Sewer Project
Alan, will you give me a call regarding this ASAP.
Cheryl
x3557
>>>Alan Gibbs 11/1/2006 11:57 AM >>>
That is my understanding in talking with David Coleman. As you know, there is also a Development
Agreement that defines this as well.
Alan Gibbs, P.E.
City of College Station
Sr. Asst. City Engineer, Public Works
>>> Cheryl Turney 11/1/2006 10:15:36 AM >>>
oops...just saw Bruckners response. i'll call him. please just confirm that this project is between
developer and contractor, but that we are conducting the bidding on it....like we did with the sanitary sewer
in indian lakes???
C
>>> "Jay Bruckner" <jbbinklevbarfield.com> 10/30/2006 9:37 AM >>>
Cheryl,
I am the project engineer for this sanitary sewer that is going to be constructed on Tauber Street. I
received this email from Alan Gibbs and just wanted to check with you to verify what things are necessary,
other than the bid tabulation/engineer's estimate, to conduct the bid?
Jay Bruckner
713-869-3433
>>> "Alan Gibbs" <Agibbs@cstx.gov> 10/30/2006 9:09 AM >>>
Jay,
You left a voicemail regarding how this sanitary will be bid. I have
cc'd several City staff on this email. Cheryl Turney in our Purchasing
Division is probably best to direct you in the specifics of this
process. In general, it is planned to be a public bid conducted by the
City-you will need to supply Purchasing associated bid documents-
City will advertise and conduct the bid -City will let you know which
is the lowest responsible bidder-the developer awards the bid -upon
acceptance of construction and necessary documentation, the City
reimburses the developer in accordance with the agreement.
Alan Gibbs, P.E.
City of College Station
Sr. Asst. City Engineer, Public Works
From: Alan Gibbs
To: Childers, Terry; Coleman, David; McDonald, Edward; Mosley, Bob
Date: 11/3/2006 9:19:18 AM
Subject: Fwd: Factory- Prelim Sanitary
Fyi -to keep everyone in the loop, these are my latest comments on the resubmitted sanitary plans.
Alan Gibbs, P.E.
City of College Station
Sr. Asst. City Engineer, Public Works (7/1) to(.2.1(tii'i
>>>Alan Gibbs 11/3/2006 9:15 AM >>> T7/14-'
Jay, T (—
I
—I have received your re-submittal Wednesday and have the following comments (using the previous
numbering):
1. Fyi, Dale O'Reilly noted the DP fee is in the mail.
2. The offsite easement dedication is unresolved.
9. Construction sequence: It is not clear that the line bewteen MH#1 and#2 can be constructed while
leaving the existing line in service. It would appear the proposed line is directly horizontally aligned on top
of the existing line. Note that the existing line is unreinforced concrete and the compaction as well the
construction at MH#2 may necessitate taking the existing line out. Place a note on the plans that pumping
will likely be required by the contractor during construction.
10. Clarify the clearance between the proposed sanitary and the existing storm at Sta. 130+40. See
McClure and Browne's attachment regarding the storm sewer near Cherry street. Revise plans
accordingly.
11. Provide a minimum of a 10 ft separation from any structures to a public line. There is a proposed line
scaling 3-4 ft from the proposed gargage structure locating manhole#1 with little to no separation.
12. Provide structural compaction for a trenches under pavement on the plan and profile sheets from
station to station.
13. Describe method to set manholes on existing sanitary lines. Specifically, manhole#2 appears to
need a"dog house" prefabbed connection. Again, this existing line is shown to be unreinforced concrete
which may also need to be considered in this connection.
14. Depict the existing sanitary line tying into manhole#2 in profile. Additionally, provide for a margin of
design or construction error as the existing flowline IN is estimated to be 345.72 and the flowline OUT is
also 345.72. There is a preferred minimum 0.1 ft fall across the manhole.
Lastly, we will need the following for stamping:
-4 complete sets of construction plans
-4 engineer's cost estimates
Alan Gibbs, P.E.
City of College Station
Sr. Asst. City Engineer, Public Works
>>> "Jay Bruckner" <ibbinkleybarfield.com> 10/19/2006 4:18 PM >>>
Alan,
I have made revisions to the drawings per your comments below and have prepared a sewer report. I am
ready to resubmit the drawings. Should I wait until the Developer gets back to me with the Development
Permit Application and the Easement Dedication Application? Or can he send that directly to you?
Regarding the comments for the previous submittal . Our responses are in italics:
1. Provide a complete Development Permit Application
2. Provide a complete Easement Dedication Application for the sanitary
outside the ROW
I have partially filled out both forms and forwarded them to the architect and the developer. I am waiting on
a response.
3. Provide a sewer report
See attached
4. Clarify the FL=343.74 at Sta. 134+25.61
It has been corrected in the revised drawings
5. The manhole at Sta. 131+16.46 does not appear to be necessary
It is necessary to tie in the service for the proposed Factory Apartments. Also, on the revised drawings,
there is a change in slope of the sanitary sewer at this point. This is necessary to handle the extra flow
from the factory apartments.
6. Cleanouts should not be located on public lines
The cleanout at lot 12 has been removed. The cleanout at lot 7 is for the service to the Baptist Student
Union. Not the public line. On the revised drawings, I have clarified this.
7. Public sanitary lines should terminate in manholes
The cleanout at lot 7 is for the service to the Baptist Student Union. Not the public line.On the revised
drawings, I have clarified this.
8. Clarify is consent is needed or obtained for any work on privately
owned property.
None is needed.
9. Clarify the construction sequence to keep the lots in service
during construciton
The proposed sanitary line should be constructed directly north of the existing sanitary sewer, and the
existing kept in service until construction is complete. I have called this out in a note on the revised
drawings.
10. Clarify the clearance between the proposed sanitary and the
existing storm at Sta. 130+40
It has been clarified in the revised drawings.
11. Provide a minimum of a 10 ft separation from any structures to a
public line
See response to number 7.
12. Provide structural compaction for a trenches under pavement
Detail S4-02 has now been cross-referenced onto the plans
13. Describe method to set manholes on existing sanitary lines
Detail has been cross-referenced on revised plans.
14. Depict the existing sanitary line tying into manhole#2
See response to number 13.
15. Clarify depths of existing sanitary services
Depths have been called out on revised plans.
Jay Bruckner, Project Engineer
Civil/Transportation Group
Binkley and Barfield, Inc.
1710 Seamist Drive
Houston, Texas 77008
713-869-3433 ext 223
713-869-6702 (fax)
Mandi Alford - Re: 415 Tauber (I",andonme^`of Public Right of way/easemer'application 1
From: David Coleman
To: Bob Mosley; Eric Hurt; Jeffrey Speed; Mandi ...
Date: 7/17/2006 10:46 am
Subject: Re: 415 Tauber(Abandonment of Public Right of way/easement application
Mandi ... Thanks. I've signed the Abandonment form and given it to Spencer.
Spencer ... Please provide the form to Mandi when you're satisfied that we have all the proper documents
to execute the "land swap."
Thanks, Dave
David M. Coleman, PE
City of College Station
Assistant Director, Water Services Department
979.764-3432 or cell 401.297-9192
>>> Mandi Alford 07/17/06 8:14 AM >>>
Good Morning!!!
Please review the attached and sign, fax back to me at x3496.
Thank you and have a nice day
Mandi Alford - Re: 415 Tauber (Phandonme^'of Public Right of way/easemer•application 1
From: Edward McDonald
To: Alford, Mandi; Mosley, Bob
Date: 7/17/2006 10:16 am
Subject: Re: 415 Tauber (Abandonment of Public Right of way/easement application
CC: Coleman, David; Gibbs, Alan; Hurt, Eric; Mic...
I have our design engineer checking to make sure that what is proposed for abandonment and what we
need to have dedicated will work with the proposed design we currently have ongoing for the Tauber St.
rehabilitation. Initially it appears to be what we need, however, I will hold off confirming that until the
design engineer of record reviews the submittals. As soon as I hear from the design engineer, I will pass
along his comments.
Edward McDonald
City of College Station
Public Works-Engineering Division
2613 Texas Avenue
P.O. Box 9960
College Station,TX 77842
Phone: (979) 764-3528
Fax: (979) 764-3489
Email: emcdonald@cstx.gov
Web: www.cstx.gov
>>> Bob Mosley 07/17/06 10:10 AM >>>
The 2,013 square foot of City row was to be abandoned in return for the 1,018 square foot of dedication of row(the 1,018
square foot is currently private property). Before we abandon the row,the 1,018 square foot needs to be dedicated either
by plat or by separate dedication agreement. Legal can provide the dedication agreement.
>>> Mandi Alford 7/17/2006 8:14 am >>>
Good Morning!!!
Please review the attached and sign,fax back to me at x3496.
Thank you and have a nice day
Mandi Alford - Re: 415 Tauber (ohandonme'4 of Public Right of way/easement application 1
From: Bob Mosley
To: Mandi Alford
Date: 7/17/2006 10:10 am
Subject: Re: 415 Tauber(Abandonment of Public Right of way/easement application
CC: Alan Gibbs; David Coleman; Edward McDonald; ..
The 2,013 square foot of City row was to be abandoned in return for the 1,018 square foot of dedication
of row (the 1,018 square foot is currently private property). Before we abandon the row, the 1,018
square foot needs to be dedicated either by plat or by separate dedication agreement. Legal can provide
the dedication agreement.
>>> Mandi Alford 7/17/2006 8:14 am >>>
Good Morning!!!
Please review the attached and sign,fax back to me at x3496.
Thank you and have a nice day
From: Spencer Thompson
To: Bridgette George; David Coleman
Date: 17-Jul-06 9:01 AM
Subject: Re: 415 Tauber (Abandonment of Public Right of way/easement application
I think the final approval of this abandonment should be part of the Development Agreement along with the dedication of
private property by Radikor for ROW.
thx
st
Spencer G.Thompson,Jr.
Engineering Services
Water Services Department
City of College Station
PO Box 9960
College Station,TX 77842
Ph.979.764.3660 Fx.979.764.3452
www.cstx.gov
>>> Mandi Alford 7/17/2006 8:14 am >>>
Good Morning!!!
Please review the attached and sign,fax back to me at x3496.
Thank you and have a nice day