Loading...
HomeMy WebLinkAboutStaff Comments ENGINEERING COMMENTS NO. 2 1. Not enough information was provided to adequately review and determine the cost of the public infrastructure on which to bond. I need a full set of water and sewer plans. 2. It appears that a 6 inch line is being extended. From the information provided, I don't thin a single 6" line will provide adequate fire coverage. Only one fire hydrant can provide fire flow off a 6 inch line. 3. Where are the easements on the plat for the extension of water and sewer? 4. An Engineers cost estimate is required for public infrastructure. 5. There is no scale on the construction plans submitted for Posados Cafe. 6. Without the water and sewer construction plans, the Replat cannot be approved and scheduled for P&Z. The Replat will not make the August 3rd Meeting. I will need construction plans by Monday, July 31st for the Replat to make the August 27th P&Z meeting. Reviewed by: Carol Cotter Date: July 20, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 STAFF REVIEW COMMENTS NO.1 Project: GATEWAY (REPLAY) - 06-00500148 PLANNING/ENGINEERING 1. Water and sanitary sewer are required to be extended to Lot 13 and water to Lot 14. Provide engineering documents for the extensions as well as Development Permit application and associated fees. 2. Owner listed on Plat is Corinth Properties, but ownership on the application and tax certificates is listed as Del Mar Baronhead and Gateway Six Partners. What is the relationship? 3. There is already an existing Lot 12 in the Gateway Subdivision. 4. Lot 9 shall be re-platted as Lot 9R. 5. Change year of notary to 2006. 6. Add lot designations to the Final Plat title. 7. Regarding Ownership and Dedication; can you dedicate to the City of College Station, when part of Lot 14 is in Bryan City Limits. 8. The certificate of Ownership and Dedication should refer to the lots being platted and not the existing lot and acreage. 9. Plat application does not have a signature and date. This is required before application is deemed complete. Reviewed by:Jennifer Reeves/Carol Cotter Date:July 10, 2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Provide 20 ft PUE along perimeter of property that was filled. With 10 ft on the sloped side and 10 ft on the filled side. 2. Provide 20 ft PUE along property line and Highway right-of-way from filled area to city limits line. 3. Provide 20 ft by 100 ft PUE along the city limit line from Hwy 6 property corner. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer,developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes&secondary pedestals as per city specs and design.(pull boxes& secondary pedestals provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido@cstx.gov / tmichals(a,cstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314. / Tony Michalsky at 979.764.3438 . Reviewed by: Tony Michalsky/ Sam Weido Date: 7-10-06 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 3 Sanitation Comments 1. Sanitation is ok with this project. Reviewed by:Wally Urrutia Date: July 10, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3