July 18,2006
TO: Parviz Vessali,Texas Hotel Management,L.P.Via fax 764.9601
FROM: Jennifer Reeves,Project Manager
SUBJECT: GREENS PRAIRIE CENTER PH 1(FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed.
One (1) set of revised construction documents
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have not
been addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Your project may be placed on a future agenda once all the revisions have been made and the
appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff
report can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Joe Schultz,P.E., Civil Development,Ltd.Via fax 764.7759
Case file #06-00500145
Greens Prairie Center—Phase 1 Final Plat
Response to Staff Review Comments No.1
Engineering comment No.1 - The off-site easement application will be submitted ASAP.
BTU—The easements have been revised as requested.
The other comments have been noted.
Please note that some of the line calls for the plat boundaries were changed by the
surveyor so that the bearings are rotated to the NAD 83 coordinate system.
MEMORANDUM
To: City of College Station
From: Karl Nelson, TxDOT
Date: May 19, 2006
Subject: SITE DEVELOPMENT COMMENTS --- May 15, 2006
1. Gateway Plaza— Ph 2a (Site Plan) (FM 60) - Since No Additional Access
is Required, No Comment.
2. Indian Lakes—Ph 4(Amending Plat) - No Comment.
3. Lions Park(Site Plan) (FM 60) - No Comment.
4. Great Oaks Subdivision (Master Plan) (En) - No Comment.
5. Crescent Point— Ph 2 (Final Plat) (FM 60) - If No Additional Access
is Required, No Comment.
6. Castlegate—Section 7 (Preliminary Plat) - No Comment.
7. Spring Creek Townhomes(Final Plat) - No Comment.
8. Greens Prairie Center(Preliminary Plat) (SH 6) (SH 40) -- Access driveways to SH 40
&SH 6 must meet TxDOT's current"Regulations for
Access Driveways to State Highways".
Regulations are primarily based on posted speed limits
and distances between proposed & adjacent access
points. Where posted speed limits are 50 MPH or more
the required spacing between access points is 425'.
Where driveway spacing is insufficient joint access will
be required or access to internal/external streets.
Developer should verify the location of any Control of
Access Sections along the south ROW SH 40 with respect
to access, etc.
Appropriate information will be required for any future
permits @ this site, which should include drainage data,
etc.
>>> "Mandi Alford"<Malfordacstx.gov>
The following attachment is the list of new development projects
submitted to Development Services this week. (5/15/06)
Mandi Alford
Staff Assistant
City of College Station
Development Services
1101 Texas Avenue
College Station,Tx 77840
(979)764-3570
CITY OF COLT FGE STATION
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842 41 4
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 10,2006
TO: Parviz Vessali,Texas Hotel Management,L.P.Via fax 764.9601
FROM: Jennifer Reeves,Project Manager
SUBJECT: GREENS PRAIRIE CENTER PH 1(FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been addressed and
the following information submitted by Monday July 17th by 10:00 a.m., your project will be placed
on the next available Planning and Zoning Commission meeting scheduled for August 3, 2006 at
7:00 p.m.in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24"x36" copies of the revised final plat;
Fifteen (15) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have not
been addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Your project may be placed on a future agenda once all the revisions have been made and the
appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff
report can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Joe Schultz,P.E., Civil Development,Ltd.Via fax 764.1159
Case file#06-00500145
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 1
Page 1 of 2
Jennifer Reeves - RE: Greens Prairie Center Phase 1
From: Carol Cotter
To: Joe Schultz
Date: 7/18/2006 4:29 PM
Subject: RE: Greens Prairie Center Phase 1
CC: Alan Gibbs; Jennifer Reeves
Joe-
Our policy is that if off-site utility extension is required for platting, then the associated easements are also
required. Most recently, Indian Lakes Phase 9 and Las Palomas were not taken to P&Z until the Easement
Dedication documents were submitted and approved by our legal department.
Carol Cotter
Engineering Services
City of College Station
(979) 764-3570 Fax:(979) 764-3496
ccotter@cstx.gov
>>> "Joe Schultz" <Joe@CDLBCS.com> 7/18/2006 4:04 pm >>>
Do we need to change the pue labels and bring you new copies tomorrow?
We will have the easement application ready soon, why do we need the off-site pue for P &Z approval, why not
just have it before we file the plat.
I would greatly appreciate your consideration to allow the plat to continue through the approval process while
the easement dedication is ongoing.
thanks
Joe
From: Carol Cotter [mailto:Ccotter@cstx.gov]
Sent: Tuesday, July 18, 2006 3:56 PM
To: Joe Schultz
Cc: Jennifer Reeves
Subject: Greens Prairie Center Phase 1
Joe-
You submitted all required copies of plat for the P&Z meeting. However, as previously commented, the Final
Plat will not be approved and got to P&Z until the required off-site PUEs are dedicated. In addition, please label
the PUEs requested by BTU as PUE and BTU easement. Please call if you have any questions.
Carol
Carol Cotter
Engineering Services
City of College Station
(979) 764-3570 Fax:(979) 764-3496
ccotter@cstx.gov
file://C:\Documents and Settings\jreeves\Local Settings\Temp\GW}00001.HTM 7/18/2006
Page 1 of 3
Jennifer Reeves - Fwd: RE: Greens Prairie Center plats
From: Mandi Alford
To: Planners/ Engineers
Date: 7/6/2006 4:39 PM
Subject: Fwd: RE: Greens Prairie Center plats
Mandi Alford
Staff Assistant
Planning and Development Services
City of College Station
www.cstx.gov
malford@cstx.gov
"Life is a book and you are its author. You determine its plot and pace and you - only you -turn the pages."
- Beth Mende Conny
>>> "Randy Trimble" <rtrimble@btutilities.com> 7/6/2006 4:39 PM >>>
Mandi,
After reviewing the Final Plat for Greens Prairie Center Phase I, the request for a 15'PUE on all lot
lines fronting existing or future street ROW's does not appear along Arrington Road or along Greens
Prairie Road. It does, however show up along SH40.
That 15' easement is a necessity for BTU.
Thanks,
Randy
From: Randy Trimble
Sent: Tuesday, May 16, 2006 4:09 PM
To: 'Mandi Alford'
Cc: Gary Samford
Subject: RE: Greens Prairie Center plats
Mandi,
Here are the comments for Phases 1, 2A, 3 and 4 only:
• Please show a 15' PUE on all lot lines
fronting existing or future street
file://C:\Documents and Settings\jreeves\Local Settings\Temp\GW}00001.HTM 7/7/2006
Page 2 of 3
ROW's.
• Please show a 20' PUE on the
remaining lot lines -- the 20' PUE may
be shown as centered on the common
lot lines of Phases 1 and 2a and Phases
3 and 4.
Thanks,
Randy
From: Mandi Alford [mailto:Malford@cstx.gov]
Sent: Tuesday, May 16, 2006 7:58 AM
To: Elton Abbott; kimberly.winn@atmosenergy.com; pcorley@bc911.org; Kim Hoesel; jbeard@bcsmpo.org;
Randy Trimble; Shawndra Green;jimp@bvsbdc.org; Days Inn; clint@clarkewyndham.com; cmetest@cox-
internet.com; mike.lavender@cox.com; Clark Ealy; David Norton; Alan Gibbs; Anne Hazen; Adrian Welsh; Bruce
Albright; Bridgette George; Becky McNair; Bob Mosley; Barbara Steptoe; Celia Hernandez; Connie Hooks;
Cabrina Scott; Charles Wood; David Coleman; David Giordano; Donald Harmon; Dennis Maloney; David Massey;
David Moore; Eric Dotson; Ed Feldman; Eric Hurt; Glenn Brown; Harvey Cargill; Jerry Duffey; John Happ; Jon
Hubach; Jeff Kersten; James Massey; Jennifer Reeves; John Woody; Ken Fogle; Kim Foutz; Kristan Weaver;
Mark Smith; Pete Cater; Pete Vanecek; Ronnie Horcica; Roxanne Nemcik; Ric Ploeger; Ron Silvia; Sven Griffin;
Shelia McQueen; Scott Mears; Steve Smith; Tom Brymer; Tony Michalsky; Winnie Garner; Jennifer Mascheck;
Jay Page; Karl Nelson; George Lea; Shelly Taylor; gbrewer@fnb-bcs.com; Joe Salvato; mholmgreen@fnb-
bcs.com; Nora Thompson; Steve Hilton; Sharon @ Days Inn; Jon; Ed Clarkson; Daniel Westerheim;
belinda_fikes@mcgraw-hill.com; Joe Vargo; Newell@Newellsdesigns.com; James Drews; Mark Dudley; Charles
White; Joe Bethany; Rod Weis; Paul; The Plan Room; Tracy.Holland@verizon.com; Tim Williams; Jim Survant;
Ann@wicksoncreek.com
Cc: Spencer Thompson
Subject: Fwd: Greens Prairie Center plats
Please review revised plat for Greens Prairie. Comments are due back on 5/22/06
Thanks
Mandi Alford
Staff Assistant
Planning and Development Services
City of College Station
www.cstx.gov
malford@cstx.gov
"Life is a book and you are its author. You determine its plot and pace and you - only you - turn the pages."
- Beth Mende Canny
>>> Adrian Welsh 05/15/06 4:51 PM >>>
file://C:\Documents and Settings\jreeves\Local Settings\Temp\GW}00001.HTM 7/7/2006
MEMORANDUM
To: City of College Station
From: Karl Nelson, TxDOT
Date: July 7, 2006
Subject: SITE DEVELOPMENT COMMENTS --- July 3, 2006
1. KFO Addition (Site Plan) - No Comment.
2. Castlegate Subdivision—Sect. 12 (Amending Plat) - No Comment.
3. Crescent Pointe(Site Plan) (SH 30) - Appropriate data will be
required for any future permits(work) @ this site,
which should include drainage data, etc.
4. Greens Prairie Center— Ph 1 (Site Plan) (SH 40) - See Previous Comments.
(May 15, 2006)
5. Castlegate Section 7— Ph 1 (Final Plat) - No Comment.
6. Williams Creek Subdivision— Ph 5 (Final Plat) - No Comment.
7. Gateway Subdivision (Replat) (SH 6) - If No Additional Access is
Required, No Comment.
>>> "Mandi Alford"<Malford0,cstx.cgov>
The following attachment is the list of new development projects
submitted to Development Services this week. (7/03/06)
Mandi Alford
Staff Assistant
City of College Station
Development Services
1101 Texas Avenue
College Station, Tx 77840
(979)764-3570