Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: CORNER BAR (SP) -06-00500139 PLANNING 1. Please provide building elevations, color samples and list of materials. These items must be reviewed and approved prior to issuing a building permit. Building Design Standards for Northgate can be found in Section 5.6.B.4 of the Unified Development Ordinance. 2. Provide all street rights-of-way and sidewalk measurements. 3. As previously discussed, 10' sidewalks are required along College Main. Currently, the sidewalks are 8' in width. There is an opportunity to provide the full 10' sidewalk by recessing the structure 2'back. Please provide a 10' sidewalk or submit an application for a waiver to this section of the Northgate Ordinance from the Design Review Board. The application can be downloaded from our website at http://www.cstx.gov/home/index.asp?page=401. 4. Per Section 5.6.B.3, historic buildings should be preserved both structurally and in character. It is staffs opinion that building a structure even with the Sparks Building would have an impact on the historic character; therefore, this addition would also require a variance to the above standards. Please see Section 5.6.B.14.a for a full description of this waiver. 5. If you will not be pursing a variance, provide sidewalk paver details for the sidewalk addition. 6. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right- of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Crissy Hartl Date: June 30, 2006 ENGINEERING COMMENTS NO. 1 1. No comments. Reviewed by: Carol Cotter Date: June 30, 2006 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. Developer shall install 2 -4" PVC conduits from transformer to building service location. 3. City will provide drawings for conduit installation. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer provides load data for project. 7. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 6-27-06 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2