STAFF REVIEW COMMENTS NO.1
Project: SONOMA (MP) -06-00500133
PLANNING
1. Remove all roads that are not thoroughfares from the Master Plan.
2. The entire legal lot of record must be included on a Master Plan. Please include the remainder of the tract
east of SH 40 in this Master Plan.
Reviewed by: Lindsay Boyer,Staff Planner Date: July 21,2006
TxDOT
1. Access driveways to SH 40 must meet TxDOT's current"Regulations for Access to State Highways".
Regulations are primarily based on posted speed limits and distances between proposed&adjacent access
points.Where the posted speed limit is 50 MPH or more the required spacing between access points is
425'.Appropriate data will be required for any future permits (work) in the ROW @ this site,which
should include drainage data, etc.
Review by: Karl Nelson Date:July 21,2006
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: July 19,2006
FIRE
1. No Comments at this time
Reviewed by: Steve Smith Date: 07/20/2006
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines (including street
lights).
3. If applicable the following easements will be required.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer,developer to furnish and install conduit as shown
on electrical layout.
6. Developer pours transformer pad(s)per city specs and design.
7. Developer installs pull boxes& secondary pedestals as per city specs and design.(pull boxes&
secondary pedestals provided by the city).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
bread@cstx.gov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments,please contact Brent Read at 979-764-5026.
Reviewed by: Brent Read Date: July 19,2006