HomeMy WebLinkAboutStaff Comments (1111*Irill114
CITY OF COI.i,FGE STATION
Planning d Development Servicer
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
June 22,2006
TO: Ron Lagrone,via fax 690.9532✓
FROM: Lindsay Boyer,Project Manager '
SUBJECT: LAKESIDE VILLAGE (PP) - Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of
staff review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday,July 3, 10:00 a.m., your project will
be placed on the next available Planning and Zoning Commission meeting scheduled for July 20,
7:00 p.m.in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24"x 36"copies of the revised preliminary plat;
Fifteen (15) 11"x 17" copies of the revised preliminary plat;
One (1) Mylar original of the revised preliminary plat;and,
One (1) copy of the digital file of the preliminary plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have not
been addressed, your project will be pulled from the scheduled Planning & Zoning Commission
agenda. Your project may be placed on a future agenda once all the revisions have been made and
the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and
staff report can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: CSC Engineering&Environmental Consultants,via fax 979-778-0820 ✓
Case file#06-00500131
STAFF REVIEW COMMENTS NO. 1
Project:LAKESIDE VILLAGE (PP) - 06-00500131
PLANNING/ENGINEERING
1. No comment
Reviewed by: Lindsay Boyer/Carol Cotter Date: June 22,2006
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes& secondary pedestals as per city specs and design.(pull boxes
& secondary pedestals provided by the city).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan
email to sweidona,cstx.gov
9. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314.
Reviewed by: Sam Weido Date: 6-21-06
Sanitation Comments
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date:June 20,2006