Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 2 Project: CARTER'S CROSSING PH. 1 (FP) - 06-00500128 PLANNING 1. Please label all of the Adjoiner Easements and PUEs on every lot they as depicted. 2. Please add a note that states all work/maintenance in the adjoiner easement shall be private maintenance. 3. This plat was not sent out for review to our electrical or sanitation departments. Please contact Brent Read with College Station Utilities at 764.5026 and Wally Urrutia with Sanitation at 764.3690 for their comments. The electrical comments below were sent with the original submittal of this project. Reviewed by: Crissy Hart! Date: October 1, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: breadcstx.qov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: June 21, 2007 ENGINEERING COMMENTS NO. 3 1. (Sheet 2) Please explain the intent of the proposed swell at the rear of Lots 1 thru 10 of Block 1. It appear from the surrounding contours the swell will pick up minimal flows from the Appomattox / North Forest intersection and experience a low flow velocity, please verify. 2. (Sheet 5) Please verify a 3.5-ft of cover above all sanitary sewer mains. In areas with less than 3.5-ft of cover, ductile iron and cement stabilized should be utilized. 3. Please provide written verification that the gas pipe line has been moved to the appropriate easement location. Reviewed by: Josh Norton Date: October 1, 2007 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: CARTER'S CROSSING PH.1 (FP) -06-00500128 PLANNING 1. Staff recommends that Grand Oaks Drive and Grand Oaks Cove renamed. This could become confusing as we already have a street named Grand Oaks Circle. Reviewed by:Jennifer Reeves Date:June 23,2006 ENGINEERING FINAL PLAT COMMENTS: 1. Please remove the "Public Drainage Easements" as these areas are proposed Park Land Dedication areas. 2. Please modify General Notes #3 and corresponding note on plat to read more like the note in the preliminary plat. This note needs to tie the "Determined Limits of the Base Flood" to the drainage report submitted by McClure and Browne for Carter's Crossing Phase 1 and 2. 3. Please verify the existence or non-existence of a 30-ft PUE (v1224, p824) along the north side of North Forest Parkway and adjacent to the subject property. 4. Please illustrate and dimension the easement containing the "City of College Station Overhead Electric Line". 5. Should the "60-ft Exxon Esmt" be dimensioned all the way across the plat, as it is not shown to be? 6. Our records indicate the existence of a 40-ft Electrical Easement (v511, p267) which cuts across the center of the subject property and generally located parallel to North Forest Parkway (approx. 300-ft off North Forest Parkway). Please verify the existence of this easement. If easement does exist as our records indicate the easement will need to be formally abandoned thru council. 7. Please clarify and provide the supporting documentation to justify that the abandoned oil/gas field site has been properly abandoned. CONSTRUCTION DOCUMENT COMMENTS: 8. Please provide engineers cost estimate. 9. Please label proposed curb type throughout. 10. (Sheet 3) The 36-in HDPE pipe from Inlet 25 to Out should tie into the channel at least at a 90 degree angle. The pipe may need to be tied into the adjacent headwall. 11. (Sheet 3) Are end road markers needed at the end of Appomattox Dr? 12. (Sheet 4) Please label the end road markers needed at the end of Chestnut and Cypress. 13. (Sheet 5) At Inlet 33 to Out, please extend direct discharge point to the center line of the stream or to point of day light, as well as erosion control measures. 14. (Sheet 7) Please illustrate pressure class for sewer main at the water/sewer conflict at Sta. 122+97. 15. (Sheet 7) It appears that the appropriate separation distance for the water/sewer conflict has not been provided for at Sta. 122+97. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 16. (Sheet 8) For the aerial crossing please note the use of MJ bells with retaining glands, which should be located at the piers. 17. (Sheet 8) Please provide and make reference to the BCS Unified Guidelines, Specs and Detail for the construction of this sewer main extension. 18. (Sheet 8) Please verify design with BCS Unified Guidelines, Specs and Detail. Detail S4-00 illustrates piers as needing to be a min. of 6-ft below grade. 19. (Sheet 8) Please verify minimum cover of 2-ft. 20. (Sheet 8) Please illustrate water/sewer conflict on Sewer Line SE-5. 21. (Sheet 9) On Sewer Line SE-4, remove service connection to main outside of pavement. 22. (Sheet 10) Please provide pressure class of proposed water line casing for the water/sewer conflict at Sta. 220+92.98. 23. (Sheet 12) It appears that the appropriate separation distance for the water/sewer conflict on Waterline WA-4 has not been provided for. 24. (Sheet 12) Please match curb detail with bcsunited.net details. Drainage Report: a. Inlet Numbers: 7B, 8B, 25B, 26B in the drainage report, are not labeled accordingly in the construction documents. b. Inlet Numbers: 6.1, 6.2 in the construction documents are not labeled according in the drainage report. c. In Exhibit C-3, is the inlet size for Inlet 30 to Out a 36-in? d. In Exhibit C-3, Inlet 25B to Out appears to have a high velocity of 20.3 ft/sec. I am unable to find 25B or what is described at 25B to Out in the construction documents. 25. In addition to the following standard comments, if more than 5 acres will be disturbed during construction of this project a NOI must be filed with the state and a copy provided to the CoCS. Storm water management requirements are as follows, any questions may be directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375: Storm Water Discharges from Small Construction Activities The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit(TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit(TXR150000). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the general permit(TXR150000). 4. Sign and post a construction site notice. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 4 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. No notice of intent(NOI), notice of termination (NOT), or fee is required under this option—as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at: http/www.tceq.state.tx.us/assets/public/permitting/waterquality/attachments/stormwater/txr150000.pdf A copy of the construction site notice can be obtained from TCEQ at: http/www.tceq.state.tx.us/assets/public/permitting/waterq uality/attach ments/stormwater/txr152d2.pdf Reviewed by: Josh Norton Date: June 26, 2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. Streetlight easements need to be added to the plat as per the conduit installation drawings. 4. Any changes or amendments to the plat should be brought to the attention of College Station Utilities as soon as possible, due to a minimum 6 month lead time for transformers. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to bread(a,cstx.gov . 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Brent Read at 979-764-5026. Reviewed by: Brent Read Date:June 21, 2006 Sanitation Comments 1. Need to show a temporary turnaround at the west-end of Grand Oaks Drive. Reviewed by: Wally Urrutia Date: June 20, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 5 ENGINEERING COMMENTS NO. 2 1. Please modify General Note 3 and associated note within plat. The notes should state that the base flood was determined by the "project drainage report" and in accordance with "City of College Station Drainage Policy and Design Standards" Or some modification of. 2. Please check typo, "15-ft P.D.E" left on in two locations. Reviewed by: Josh Norton Date: July 10, 2006 (-1.#111. dAttgo,re CITY OF COLLEGE STATION olkilo" r"' Ps Planning d Development Services 1101 Texas Avenue, P.O Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM October 1, 2007 TO: Steve Arden, Carter's Crossing Venture via fax# 846.0652 FROM: Crissy Hartl, Staff Planner SUBJECT: CARTER'S CROSSING PH. 1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 15, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 1, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; Parkland Dedication in the amount of $6,802 must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Clement Fojtik, Owner, 1515 Emerald Plaza, College Station, TX 77845 Jeff Robertson, McClure & Browne Engineering via fax# 693.2554 Case file #06-00500128 Home of Texas A&M University q (*ff1114111 CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 27, 2006 TO: Continental Homes of Texas,Via fax 512.345.6080 FROM: Jennifer Reeves,Project Manager SUBJECT: CARTER'S CROSSING PH.1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday July 3rd by 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for July 20, 2006 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; Fifteen (15) 11"x17" copies of the revised final plat; Parkland Dedication in the amount of$ must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: McClure&Browne Engineering/Surveying, Inc.Via Fax 693.2554 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 Case file #06-00500128 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 Mc, URE & BROWNE ENGINEEF G/SURVEYING, INC. 1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 (979)693-3838• Fax:(979)693-2554•Email: McClureBrowne@Verizon.net June 30, 2006 Ms. Jennifer Reeves Project Manager Development Services, City of College Station College Station, TX 77840 Re.: CARTER'S CROSSING PH. 1 Final Plat— Engineering Comments Staff Review Response MBESI#: 1000-0072 Dear Jennifer: Below is the summary of the Staff comments made and our Responses. PLANNING COMMENTS: COMMENT#1: Staff recommends that Grand Oaks Drive and Grand Oaks Cove renamed. This could become confusing as we already have a street named Grand Oaks Circle. ACTION: Done. ENGINEERING COMMENTS: FINAL PLAT COMMENTS: CO T#1: Please remove the `Public Drainage Easements' as these areas are proposed ParkLand Dedication areas. ACTION: Done. OMMENT#2: Please modify General Notes#3 and corresponding note on plat to read more like the note in the preliminary plat. This note needs to tie the 'Determined Limits of the Base Flood' to the drainage report submitted by McClure and Browne for Carter's Crossing Phase 1 and 2. ACTION: Done. CO T#3: Please verify the existence or non-existence of a 30 ft PUE (V1224, P824) along the north side of North Forest Parkway and adjacent to the subject property. ACTION: This right-of-way easement lies within the NORTH FOREST PARKWAY RIGHT-OF-WAY. See attached Boundary Survey for more information. CO NT#4: Please illustrate and dimension the easement containing the 'City of College Station Overhead Electric Line'. ACTION: There is no easement of record for this electrical line. Carter's Crossing Phase One Page 1 of 2 City Comment Response Letter I CO NT#5: Should the '60 ft Exxon Esmt' be dimensioned all the way across the plat, as it is not shown to be? ACTION: The easement is being re-defined to match the limits shown on the plat. OM NT#6: Our records indicate the existence of a 40-ft Electrical Easement which cuts across the center of the subject property and generally located parallel to North Forest Parkway (approx. 300-ft off North Forest Parkway). Please verify the existence of this easement. If easement does not exist as our records indicate the easement will need to be formally abandoned thru council. ACTION: The easement is located along the Northwest line of the property. See the attached Boundary Survey. CO T#7: Please clarify and provide the supporting documentation to justify that the abandoned oil/gas field site has been properly abandoned. ACTION: Attached please find the Phase One Environmental Report indicating there were no sources of environmental concern on the property. If you have any questions or additional comments, please do not hesitate to contact me. Sincerely, _ i Je I- L. R 1bertson, P.E. M ( •re & Browne Engineering/Surveying, Inc. Carter's Crossing Phase One Page 2 of 2 City Comment Response Letter Ckri444 CITY OF COT 1.FGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 10,2006 TO: Continental Homes of Texas,Via fax 512.345.6080 FROM: Jennifer Reeves,Project Manager SUBJECT: CARTER'S CROSSING PH.1(FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Wednesday July 12th by 10:00 a.m., to keep your project your project on the next available Planning and Zoning Commission meeting scheduled for July 20, 2006 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; Fifteen (15) 11"x17" copies of the revised final plat; Parkland Dedication must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov. Upon receipt of the required documents for the Planning&Zoning meeting,your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning& Zoning Commission meeting.Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting,the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: McClure&Browne Engineering/Surveying,Inc.Via Fax 693.2554 Case file #06-00500128 ENGINEERING COMMENTS#2