Loading...
HomeMy WebLinkAboutCorrespondence Sincerely, Lindsay Boyer Staff Planner Cc: Chad Grauke,via email cgrauke@cox-internet.com Case File # 06-0500111 1/17/2006 Building and Planning ATTN. PAC Fax#979,764.3496 Total Pages: 3 (Letter+Two Maps) My proposal centers on the property located at 106 College Main in the Northgate area. We would like to turn this property into a bar/lounge, Currently, this property is a retail shop/manufacturer. Holick's is a two-story building of approximately 2900 sq. ft. I plan on making numerous renovations and the end result being a bar both downstairs and upstairs and the same for restrooms. This being my first project like this 1 am asking for help in the following areas: I would like to know what permits 1 will need. What will be required of me? About a fire escape(Holick's not having one at the moment) Before I start doing anything, is it possible for a city inspector to walk through with me. i.e. areas of concern on a city inspector's behalf. If there are any areas of a concern, could a vendor be recommended? Last, but not least if I am going about this in the wrong way, if you could please point me in the right direction, it would be greatly appreciated. Sincerely, Trey Dockins 214.335.5216(cell) trey_dockins9@hotmail.com hotmail.com 2/I'd 96brb9Z6L6T6:01 6b27S022L6 NO3HJJ3ZI:WaId 172:0T 9002-LT-Ntir 4. -ff' CITY OF COLLEGE STATION CITY OF COLLEGE STATION 2006 Submittal Deadline Dates Planning✓Development Services Planning & Zoning City Council Zoning Board of Design Review Board Submittal Deadline Commission Meetings Meetings Adjustment Meetings Meetings 7:00 P.M. 7:00 P.M. 6:00 P.M. 11:00 a.m. 10 A.M. 1s' & 3rd Thursdays 2nd 4th lst Tuesdays 2nd & 4th Fridays 2 & Thursdays Y Monday, November 7 December 8 January 12 December 6 December 9 Monday, December 5 January 5 January 26 January 3 N/A Monday, December 19 January 19 February 9 N/A January 13 Tuesday, January 3 February 2 February 23 N/A Monday, January 9 N/A N/A Tuesday, January 17 February 16 March 9 1664Pcd-krspn Monday, January 23 N/A N/A _ l2 V Monday, January 30 March 2 March 23 1-"/5r (3f9 Monday, February 6 N/A ��// N/A P�/' 5fi� � Monday, February 13 March 16 R.GL � buca I — PCL-"-' Ss muse Monday, February 20 N/A IC �{ , a�1 CQI G>LC�P Monday, March 6 April 6 l ' �L I • kiptc AA,. i 4 C(� Sw\-� Monday, March 20 April 20 Heti k p� C] cI J Monday, April 3 May 4 :JLP r2w / ) 1`je Monday, April 10 N/A 12.-€V� _ - >_ j• 4 f'✓ r Monday, April 17 May 18 N/A Monday, April 24 N/A R-:edMay 12 a Monday, May 1 June ' 6 N/A Monday, May 8 N/i — 61 t h , May 26 Monday, May 15 JunE .'�� A N/A Monday, May 22 N/A I . iA June 9 Monday, June 5 July 6 ' 4 June 23 H •C Monday, June 19 July 20 C i kL 13 i dq N/A 1 After each filing deadline, staff will evaluate r("_-4-11 y b ()cu = there is a large caseload, items will be scheduled on a first-come, first-se' ablished deadline day in no way guarantees that you will be placed on the cor Lo(D QI - 2q`Z fl icil, Zoning Board of Adjustment, or Design Review Board meeting. Staff will lJ Dwing week with the applicant to discuss staff review comments on each projE —______._'__.___..-._." `--- contact Development Coordinator Bridgette George (bgeorge@cstx.gov)at 979 9 L •- Zz--t 20 Site Plans/Cons v 2-C—2�q 7 ates: All site plans, construction documents and dr ase before the Planning and Zoning Commission or City Council, must be submitte ty p p C red after 10:00 a.m. on Monday will not be scheduled for staff review until the / G (..,-,, i deadline will be moved to the next business day at 10:00 a.m.) -II 5- ( o 34, a CITY OF COLLEGE STATION Planning & Development Services June 2, 2006 Mark Sweidan 3815 Stony Creek College Station, TZ 77843 RE: 106 College Main Dear Mr. Sweiden: We have completed our review of your proposed changes to 106 College Main and are denying the request based on the following: • The subject property is a medium priority inF e Northgate Historic Resources Survey and must meet the following standar which are outlines in the Unified Development Ordinance Section 5.6.8.3, uilding Design Considerations for Historic Properties: "The historic character of a roper will be retained and preserved. Distinctive materials or features and sp tial - ationships that characterize a property shall not be removed or altered." The removal of the recessed entry and the display windows would remove the spatial relationship that makes this storefront a unique property that the City wishes to preserve. • Additionally, any new signs must be in compliance with Section 5.6 of the Unified Development Ordinance which does not allow signs to block any architectural detail of the building. This includes the canopy. The new sign is also permitted by a separate permit and have not been approved I would be happy to review any revised proposal that you feel meets the standards of the Unified Development Ordinance, however, the alterations of the symmetry of the building will not be approved by the staff. A waiver process is available through the Design Review Board if the proposal generally conforms to the standards, and preserves the historical appearance and architectural character of the building. If you have any questions, please give me a call at (979) 764-3570.