HomeMy WebLinkAboutfiled plat ‘ff Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
CITY OF COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 8, 2007
TO: Davis Young, Pebble Creek Development via fax# 979.690.6081
FROM: Crissy Hartl, Staff Planner
SUBJECT: PEBBLE CREEK PH 9G (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, October 15, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, November 1, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Nineteen (19) 11"x17" copies of the revised final plat;
Parkland Development fees in the amount of $7,160 must be submitted prior to
the filing of the final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Jeff Robertson, McClure & Browne Engineering/Surveying, Inc. via fax#979.693.2554
Case file #07-00500237
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 2
STAFF REVIEW COMMENTS NO. 1
Project: PEBBLE CREEK PH 9G (FP) - 07-00500237
PLANNING COMMENTS
1. The preliminary plat that was submitted with this Phase is not the approved preliminary plat.
However, Phase 9G is still in general conformance with the approved. Be aware that the
revised preliminary plat will need to be submitted and approved by P&Z before Phase 9H
can be platted as indicated.
2. Phase Line between 9G and 9H is missing on the preliminary plat.
3. Why is the limit of Phase 9H being reduced on the preliminary plat?
4. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
5. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Crissy Hartl, Staff Planner Date: October 5, 2007
ENGINEERING COMMENTS
1. How will Owners of Lots 6, 16 and 17 know that they cannot build a fence across path of
discharge from outfall on their property? Wouldn't it be better to extend outfalls past lot
lines?
2. Please label the PUE between Lots 17 and 18, and the PUE/PDE between Lots 16 and 17.
3. Construction plans and reports are still under review and may affect the plat.
Reviewed by: Carol Cotter Date: October 5, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to
breadcstx.qov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: October 3, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 2