Loading...
HomeMy WebLinkAboutCorrespondence CITY OF COLLEGE STATION Planning cf.Development Services 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 19,2006 TO: Steve Arden,Applicant via fax# 846.0652 FROM: Crissy Hard,Staff Planner SUBJECT: GREAT OAKS (MP) Staff reviewed the above-mentioned master plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, May 29, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for June 15, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x 36"copies of the revised master plan; Fifteen (15) 11"x 17"copies of the revised master plan; One (1) Mylar original of the revised master plan;and One (1) copy of the digital file of the master plan on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov;and Upon receipt of the required documents for the Planning& Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed,your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Dr.Lieven J.Van Riet,INDIVISA CORP.via fax#713.652.4926 Mike McClure,McClure&Browne Engineering/Surveying,Inc.via fax#693.2554 Case file#06-00500104 Home of Texas A&M University Page 1 of 1 Crissy Hartl - Fwd: Great Oaks Subdivision From: Mandi Alford To: Planners / Engineers Date: 5/17/2006 7:51 AM Subject: Fwd: Great Oaks Subdivision »> "Randy Trimble" <rtrimble@btutilities.com> 05/16/06 5:04 PM >» Mandi, BTU's requirements for Great Oaks Subdivision are as follows: • Need to show a note granting a 20' electric easement centered on all interior lot lines. • Need to show a note granting a 20' easement along outer perimeter of development. A 16' easement along all public ROW is sufficient. • Need to show a note using the following language granting a "5' wide easement for anchors and guy wires necessary to help support overhead utility lines. Easement will extend 20' beyond any utility easement." • All existing electrical lines need to be shown. Also show the volume and page number of any electric line easements. • Please call BTU Line Design at 821-5770 at least 120 days before power is needed to begin the process for providing power to the area. • The electrical service for this subdivision will be front lot construction. • Please ask the developer to let us know if they want overhead or underground construction within the subdivision. Thanks, Randy Trimble, PE Bryan Texas Utilities PO Box 1000 <77805> 205 E. 28th Street Bryan, TX 77803 (979) 821-5728 (979) 229-3154 (Cell) (979) 821-5796 (Fax) file://C:\Documents and Settings\chartl.CSTX\Local Settings\Temp\XPGrpWise\446AD60... 5/18/2006 JN cCLURE & BROWNE ENGINt,RING/SURVEYING, INC. 1008 Woodcreek Drive,Suite 103•College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net May 26, 2006 5\2-L106 3 '.60 Ms. Crissy Hartl, Staff Planner CITY OF COLLEGE STATION P.O. Box 9960 College Station,Texas 77842 RE: Great Oaks Subdivision Master Plan Resubmittal Dear Ms. Hartl: Attached please find two (2) 24" X 36" copies, fifteen (15) 11" X 17" copies and one (1) mylar original of the Great Oaks Subdivision Master Plan revised per staff review comments dated 5/19/2006. I have the following responses to the PLANNING/ENGINEERING numbered comments: 1. Because a Master Plan is intended to be a conceptual, informal map, please remove all proposed lot lines,right-of-way widths,and infrastructure. This has been revised 2. Staff will require that a street extend to the property to the east to break the block length. If this is not your intent,a variance will be required at the time of preliminary plat. The owner does not wish to extend the street and will request a variance with the submittal of the preliminary plat. 3. Please remove "Las Palomas Subdivision" and the lost lines as the final plat has not been approved. This has been revised Please note one other revision made to the master plan: At the request of the owner Phase 2 has been split into additional phases. Should you have any questions please advise. Very truly yours, M'chael R. McClure,P.E.,R.P.L.S. President MRM/mlm attachments