HomeMy WebLinkAboutstaff review STAFF REVIEW COMMENTS NO. 3
Project: GATEWAY PH 2A (SP) -06-00500101
PLANNING
1. End islands will be required at the end of every parking row. It appears that the new parking ends with
just a curb and not an end island. Please adjust accordingly.
Reviewed by:Jennifer Reeves Date:August 31,2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. 2 of 2
STAFF REVIEW COMMENTS NO.2
Project: GATEWAY PH 2A (SP) - 06-00500101
PLANNING
1. Please make sure that all other pages in the set of construction, grading, erosion
control, site and landscape plans match the new site layout at the rear of the
proposed buildings where additional parking is being proposed as well as the phase
lines.
2. Please make sure all dumpster enclosures are a minimum of 12'x12' and screened
with a masonry wall with gates. If bollards are being proposed in side of the
enclosures please make sure that the bollards are at least 12'x12' apart as well.
3. Please provide a dumpster detail with dimensions.
4. As previously requested, please provide a note on the site plan stating weather or
not the subject property is located within the 100-year flood plain or not referencing
FEMA/FIRM map number.
Reviewed by: Jennifer Reeves Date: June 1, 2006
ENGINEERING COMMENTS NO. 2
1. Add inlet protection to inlet near area of construction and/or staging.
2. Appropriate thrust blocking is required on fire suppression lines, especially with the
90° bends that are proposed in the 6" lines. Are the 6" lines necessary for the fire
suppression? If you are planning to reduce down at the building anyway, you could
reduce down after the isolation valve.
3. PVC fire suppression lines shall be C-909.
4. Structural backfill is required on fire suppression lines under pavement.
5. Show water meter locations. They must be located within a PUE.
6. Did not receive the updated drainage report requested with the previous comments.
Reviewed by: Carol Cotter Date: June 2, 2006
0
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY PH 2A (SP)—06-00500101
(Please be aware that this review is for Phase 2A only)
/PLANNING
i1. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
i. Suchscreening shall be coordinated with the building architecture and scale to maintain a
unified appearance.
It appears that the 28 parking spaces that are dedicated to Wings & More restaurant are
being counted as part of the required parking for this development...? The 28 spaces
dedicated toward Wings & More cannot be counted for this development.
. Please provide a phase on the site plan 20-feet beyond the proposed construction limits.
4. Please show phase line for Phase III.
Please note on the site plan weather or not the subject property is located within the 100-year
flood plain or not referencing FEMA/FIRM map number.
✓ Show fire lanes as existing.
Please identify existing and proposed fire hydrants.
LANDSCAPING/STREETSCAPING/BUFFER
4. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way, and adjacent property disturbed during construction.
Reviewed by: Jennifer Reeves Date: May 16, 2006
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as
per City Ordinance 2394.
2. All Back Flow devices must be installed and tested upon installation as per City Ordinance
2394.
ENGINEERING COMMENTS NO. 1
1. Show existing infrastructure as existing and not proposed.
2. Per recent ordinance, the fire suppression lines are now private and do not require a
PUE nor plan and profile. However, the design, construction and installation of the
fire suppression line shall be in compliance with all applicable City Codes and the
BCS Unified Design Guidelines, Specifications and Details (to public standards).
3. On the fire suppression line, an isolation valve is required just inside the PUE. Also
note on the plans that fire suppression lines shall have a lockable lid on the isolation
valve. The lockable lid shall, at a minimum supply protection as the AMP or USA,
LL562 Locking Lid. Alternate lockable lids shall be approved by College Station
Utilities Director or his designee.
4. Provide an updated drainage report and plan sheet for the added storm sewer
constructed with Phase I.
Reviewed by: Carol Cotter Date: May 16, 2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review. P.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric
lines
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and
install conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan
email to sweidocstx.qov
8. Developer provides load data for project.
9. To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 5-17-06
Sanitation Comments
1. Interior clearance (inside Screen) of trash compactor needs to be 29ft deep by 16ft wide.
Reviewed by: Wally Urrutia Date: May 16, 2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained
in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review. P.