HomeMy WebLinkAboutcorrespondence . ,. .. 4/ 71----.. / RABON 1VIErCALF ENGINEERING (979)690-0329 - Homc Q POST OFFICE BOX 9253 (979)690-0329 - FAX '\ COLLEGE STATION,TIXAS 77842 (979)219-4174 - CELL EMAIL: r-m en gineer( jono.com �� -� v 1� i, October 2,2006 Josh Norton,E.I.T., Graduate Engineer City of College Station 1101 Texas Avenue South College Station,TX 77842 RE: Christ United Methodist Church—New Multi-Purpose Worship Building 4201 State Highway No.6,South,College Station,TX Transmittal Letter for 3`d Submission RME No. 198-0272 Dear Josh: Please find attached the following information for the above referenced project: 1. Staff Review Comments No.2 checklist; 2. 1 complete set of Construction Drawings; 3. 1 copy of the Civil Site Plan sheets(C1.1A and C1.1B); 4. 1 copy of the Landscaping Plan sheets(C 1.7A and C1.713); 5. 3 copies of the TxDOT Driveway Permit; 6. 1 Easement Dedication packet for dedication of the proposed Public Utility Easements required for the construction of proposed water and sewer lines; Revisions to the Construction Drawings that have been made, outside of those requested by CoCS staff,are generalized as follows: 1. Relocation of the NW driveway entrance so that the existing "middle" driveway can remain and TxDOT driveway spacing can be met. A Private Joint Access Easement is in the process of being filed. A filed copy will be provided ASAP; 2. Delineation of some parking as an "Add-Alternate" construction. Where relevant, planning items have been illustrated to show that the "Base Bid" and "Add-Alternate" parking scenarios will meet UDO requirements (i.e. parking count, interior island space, etc...). Grading and drainage systems have been adjusted to accommodate both construction scenarios; 3. Extension of the public sanitary sewer to include a portion of sewer plumbing that was previously designed as private; Below are responses to your Staff Review Comments No. 2,dated June 5,2006. PLANNING: 1. This comment was negated with the resolution of a private joint access easement and driveway that was equally common with CUMC and the north property owner; CD1-198-0272-L05 Page- 1 of 2 Christ United Methodist Church,..,ollege Station,TX Rabon Metcalf Engineering Transmittal Letter for 3th Submission October 2.2006 2. As discussed with Lindsey Boyer, the connectivity of the east and west parking lots, either side of the circular drive, will be addressed at a future time with the construction of the Pebble Creek Parkway; 3. Revised as requested; 4. N/A since the middle driveway entrance will remain in place as is; ENGINEERING: ion line and 1. A new fitting configuration is proposed with the revisions to the fire suppress system; 2. Additional gate valve added at Sta. 16+68.97(see sheet C2.2); 3. Detention facility and outlet structure have been modified so that the Post Q is less than the Pre Q(see Supplemental Drainage Letter); 4. Drainage Area Maps X and P have been revised to include a legend (see Supplemental Drainage Letter); 5. The fire suppression line has been modified per our phone conversations to be a private line, tied to the public system, with an isolation valve at that connection (see sheet C1.5A); Please do not hesitate to call if you have any questions. Sincerely, 110.401Wii Rabon A.Metcalf,P E. rabon@rmengineer.com CD1-198-0272-L05 Page-2 of 2 (1 b y S DIP 7-C ri CITY OF COLLEGE STATION Planning d•Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM June 5, 2006 TO: Rabon Metcalf, PE via fax 690-0329 FROM: Trey Fletcher, Senior Planner SUBJECT: CHRIST UNITED METHODIST CHURCH (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit t following information for further staff review: One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Gary Draper (Christ UMC) via mail: 4203 SH 6, CS, TX 77845 Jack Duran, AIA via fax 281-497-7480 Case file#06-00500088 85/03!2806 23:34 9797643496 DOCS DEVELOPMENT SER PAGE 01/03 Cd"1" eaty os Councs STATION Phisadirs Dsys&paletst Samar 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM May 4,2006 TO: Rabon Metcalf, PE via fax:690-0329 FROM: Trey Flotcher,AICP—Project Manager SUBJECT: CHRIST UNITED METHODIST CHURCH(SP)-Site Plan Staff reviewed the above-mentioned eito plan es requested. The following page is a net or stair review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: V One(1)revised site and landscaping plan set. WA Easement Dedication Sheet and required docunx:nta. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit.If there arc comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any quostions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Gary Draper(Christ UMC)via mail:4203 State Highway 6,CS,TX 77845 Jack Duran,AIA via fax:281-497-7480 Cow filo#06-00600088 NOTE Any changes made to the plans,that have not been requested by the Crlof College Stadon,must be explained In your next Dynamite,letter and'bubbled'on your pians.Any arhttlonsl changes on these plans that have not been pointed out to the My.w- constitute a compt.t./y+now review. CITY OF COT I.FGE STATION Planning ei•Development Servicer 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM June 5, 2006 TO: Rabon Metcalf, PE via fax 690-0329 FROM: Trey Fletcher, Senior Planner SUBJECT: CHRIST UNITED METHODIST CHURCH (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Gary Draper (Christ UMC) via mail: 4203 SH 6, CS, TX 77845 Jack Duran, AIA via fax 281-497-7480 Case file #06-00500088 A- L. 4 R ABON METCALF ENGINEERING (979)690-0329 - Home �� POST OFFICE BOX 9253 .- (979)690-0329 - FAX • COLLEGE SCATION,TEXAS 77842 (979)219-4174 - CELL EMAIL: rmengineer@juno.com May 24, 2006 Trey Fletcher, A.I.C.P.,Senior Planner City of College Station 1101 Texas Avenue South College Station, TX 77842 CC: Josh Norton,E.I.T., Graduate Engineer RE: Christ United Methodist Church—New Multi-Purpose Worship Building 4201 State Highway No.6, South,College Station,TX Transmittal Letter for 2' Submission RME No. 198-0272 Dear Trey: Please find attached one complete set of construction plans, and additional revised data, for the above referenced project and one copy of the revised Site Plan sheets and Landscape Plan sheets. Below are responses to your Staff Review Comments No. 1, dated May 4, 2006, and additional comments from the General Contractor (Fretz Construction) and the Architect (Turner Partner Architecture). Revisions to these construction drawings are outlined per sheet and the associated "Staff Comment"number is identified. GENERAL REVISIONS: 1. Planning Note #5—Address has been added to the title block of all sheets; 2. Engineering Note #5 —Please find attached the revised Drainage Report. Drainage Area Maps have been revised to properly illustrate drainage area"X", "P 1", and"P2"; C1.0A& C1.0B—General Construction Notes: 1. Revision of Demolition Note 13(B) to clarify abandonment procedures of existing water line; 2. Addition of Demolition Note 15 - 17 to clarify abandonment procedures of existing water line; 3. Addition of Paving Note (A)(13). Coordination note for construction of the building pad fill extends under the rear parking area; 4. Planning Note #4—A"Key Map"has been added. Sheet Cl.0A along with sheets C 1.2A and C1.2B will constitute as the Site Plan sheets; 5. Planning Note #11 —FYI: See Site Note#3; C1.1A& C1.1B—Existing Site,Demolition,& Erosion Control Plan: 1. Corrected demolition note reference to relocation of existing gas meter; CD1-198-0272-L04 Page- 1 of 4 • Christ United Methodist Church,College Station,TX Rabon Metcalf Engineering Transmittal Letter for 2°d Submission May 24,2006 2. Add "Tree Protection Barricading Fence" for existing trees to be preserved near construction limits where applicable; 3. Adjusted erosion control measures and demolition notes for removal of existing"middle" driveway entrance; 4. Added addition sideslope erosion control blanket to cover the all interior embankments of the proposed detention facility; 5. Engineering Note #4 — FYI: Please find attached a reduced drawing that illustrates the relationship of the proposed building with the existing public utility easement to be abandoned; C1.2A& C1.2B—Civil Site Plan: 1. Planning Note #1 — The existing "middle" driveway entrance is proposed to be demolished and removed. Therefore, TxDOT access point entrance distances are met. CUMC is in the process of filing a Private Joint Access Easement for the adjacent property owner's use of this proposed driveway entrance. Once complete, a filed copy will be provided. Please find attached the revised TxDOT Driveway Permit for this proposed entrance; 2. Planning Note #2 — FYI: Sheet C1.0A should be considered a part of the "Site Plan". The"Site Plan"will be comprised of sheets C 1.0A, C1.2A, and C1.2B; 3. Planning Note #6—Curb & Gutter detail has been added to sheet C1.2B. FYI: All curb and pavement details are contained on Sheet C3.3; 4. Planning Note #7—FYI: All shaded areas are H/C sidewalk ramps for the adjacent H/C parking areas; 5. Planning Note #8—Interior parking island requirements are noted on the drawings along with square-footage, exceeding the required amount, for all applicable interior islands; 6. Planning Note #9—The proposed P.U.E., located on Sheet C1.2B,has been labeled along with additional proposed P.U.E.that is needed for the water line looping; 7. Planning Note #10—Symbol/Line Legend has been added to Site Plan sheets; 8. Engineering Note #2—The fire lane adjacent to the proposed building has been revised to be 27' wide(B.O.C.to B.O.C.)or 26' wide (F.O.C.to F.O.C.); C1.3A& C1.3B—Grading Plan: 1. Additional grading information for re-grading of demolished "middle driveway" and new parking in this area; 2. Engineering Note #6 — Please find attached the revised Drainage Report. FYI: The detention pond has been increased in size to have a higher volume capacity. Therefore, the discharge rate from the detention facility will not exceed pre-development flows; C1.4A& C1.4B—Drainage Plan: 1. Revised roof drain line sizes at varies locations; C1.5A& C1.5B—Private Utility Plan: 1. Added replacement and extension of existing fire hydrant near the former "middle" driveway entrance so that fire hydrant is in an acceptable proximity to the fire lane; 2. Added 4"private sanitary sewer line to the west side and rear of the building for 2" stub- out from choir rooms; CD1-198-0272-L04 Page-2 of 4 Christ United Methodist Church,College Station,TX Rabon Metcalf Engineering Transmittal Letter for 2nd Submission May 24,2006 C1.6A& C1.6B-Paving Plan: 1. Additional paving information for new parking area at former "middle driveway" location; C1.7A& C1.7B-Landscape Plan: 1. Sheet C1.7B was expanded to show all of site; C2.1 -Water Line"Wl" & "W2"-Plan/Profile: 1. Added In-Line Blow-Off Assembly at Water Line"W 1" Sta. 3+70; 2. Engineering Note #3 - Included additional water line for water line looping. Due to looping of the water line all previously proposed 12"was reduced to 8" in size; 3. Please find attached the revised Hydraulic Analysis that included the water line looping; C2.2-Water Line"W1"-Plan/Profile: 1. New construction sheet added to illustrate water line looping; C2.3-Sanitary Sewer"Sl" & Water Line"WV-Plan/Profile: 1. Formally sheet C2.2; 2. New construction information added to illustrate water line looping; 3. Engineering Note #1 -FYI: The surveyor only provided one flowline for this manhole. No drop connection should be required; C3.1 -Site& Parking Details: (No changes) C3.2-Drainage Details: 1. Clarified dimensions of Storm Sewer Junction Box, Area Grate Inlet, and Curb Inlet details; 2. Restrictor size at outlet of detention facility was reduced to be 42" in diameter; C3.3-Paving Details: 1. Deleted seal coat note on H.M.A.C. Pavement detail; C3.4-Miscellaneous Details: (No changes) C3.5-Erosion Control Details: (No changes) C3.6-Landscape Notes & Details: 1. New construction sheet added containing Landscape and Irrigation Notes and landscape details that were once on sheet C1.7B; 2. Planning Note #3-FYI: Refer to Irrigation Note #5; 3. Landscaping/Streetscaping/Buffer Note #1 - Add "Tree Protection Barricading Fence" for existing trees to be preserved near construction limits where applicable; 4. Landscaping/Streetscaping/Buffer Note #2-Landscape plan encompasses both proposed and existing landscaping for the entire site; 5. Landscaping/Streetscaping/Buffer Note #3-FYI: Refer to Landscaping Note#9; 6. Landscaping/Streetscaping/Buffer Note #4-FYI: Refer to Landscaping Note#2; CD1-198-0272-L04 Page-3 of 4 Christ United Methodist Church,College Station,TX Rabon Metcalf Engineering Transmittal Letter for 2nd Submission May 24,2006 7. Miscellaneous Note #1 —FYI: Refer to Irrigation Note#2; 8. Miscellaneous Note #2—FYI: Refer to Irrigation Note#3; Please do not hesitate to call if you have any questions. Sincerely, / 40m.IOW wow- Rabon A. Metcalf, P.E. rmengineer@verizon.net CDI-198-0272-L04 Page-4 of 4 MEMORANDUM To: City of College Station From: Karl Nelson, TxDOT Date: May 1, 2006 Subject: SITE DEVELOPMENT COMMENTS --- April 24, 2006 1. Christ United Methodist Church (Site Plan) (SH 6) - Access driveways to the SH 6 EFR must meetTxDOT's current "Regulations for Access Driveways to State Highways". Regulations are primarily based on posted speed limits and distances between proposed & adjacent access points. Where posted speed limits are 50 MPH or greater the required spacing between access points is 425'. Proposed north access drive will not meet requirements. Shared access with the north adjacent property would be an option, but the proposed driveway would have to be shifted approximately 65' north with shared access to the Church's property. This would also appear to meet the access spacing requirements to the existing driveway on the north adjacent property/ Appropriate data will be required for any future permits @ this site. >>> "Mandi Alford"<MalfordAcstx.cgov> The following attachment is the list of new development projects submitted to Development Services this week. (4/24/06) Mandi Alford Staff Assistant City of College Station Development Services 1101 Texas Avenue College Station, Tx 77840 (979)764-3570 CITY OF COLLEGE STATION ..,�, Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM May 4, 2006 TO: Rabon Metcalf, PE via fax: 690-0329 FROM: Trey Fletcher, AICP— Project Manager SUBJECT: CHRIST UNITED METHODIST CHURCH (SP)-Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan set. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Gary Draper(Christ UMC) via mail: 4203 State Highway 6, CS, TX 77845 Jack Duran, AIA via fax: 281-497-7480 Case file#06-00500088 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P