Loading...
HomeMy WebLinkAboutStaff Comments (14bfrff4" CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 3, 2007 TO: Jim Easterly via fax 776-4747 FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: SUMMIT CROSSING (PDD) — Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit by December 5th at 10 am to be scheduled for the next available Design Review Board (DRB) meeting on Friday, December 14th, 11:00 a.m. in the City Hall Administrative Conference Room, 1101 Texas Avenue: Eight (8) revised site plans. The agenda and staff report for your project can be accessed at the following web site on Tuesday the week before the DRB meeting. http://www.cstx.gov/home/index.asp?page=31 Please note that additional construction documents will be required once the DRB has approved the Site Plan, so that they can be stamped approved. If you have any questions or need additional information, please call me at 979.764.3570. pc: Case file no. 07-00500300 Staff Review Comments No. 1 SUMMIT CROSSING (PDD) - 07-00500300 PLANNING 1. No comment. Reviewed by: Lindsay Boyer Date: November 30, 2007 FIRE 1. Buildings over 30 feet will be required to have a fire sprinkler system. 2. Fire Department connections for the fire sprinkler system shall be within a 100 feet of a fire hydrant. Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: 30 November 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 12-3-07 SANITATION 1. Sanitation is ok with this concept plan. Reviewed by: Wally Urrutia Date: November 29, 2007