HomeMy WebLinkAboutStaff Comments RESPONSE TO STAFF REVIEW COMMENTS (dated 12-14-2007) Project: SUMMIT CROSSING (PP) - 07-00500301 PLANNING 1. Sidewalks have been shown down the entire length of Harvey Road as requested. The existing 20' PUE is now also noted as a public access easement and the sidewalk is within this easement, as shown on the plat. 2. Sidewalks have been shown to be extended through the Common Areas along Durango Drive as requested. RESPONSE TO STAFF REVIEW COMMENTS (dated 12-3-2007) Project: SUMMIT CROSSING (PP) - 07-00500301 PLANNING 1. A revised Page 2 of the application is being submitted. 2. The mylar of the Master Plan is included with this re-submission. 3. There are 126 lots. 4. Zoning notation of adjacent property has been corrected. 5. Note 7 has been added. 6. Boundary calls have been corrected/added. 7. Note 6 has been revised. 8. A sidewalk is not proposed through the detention pond. Detention area has been labeled as Common Area No. 3. Other sidewalks have been revised. 9. Fire hydrants have been clarified with an additional label. 10. This area has been labeled as a common area. 11. Gross density is 126 lots for 14.03 acres is 8.98 DU/acre. 12. Pipeline information has been clarified. ENGINEERING COMMENTS NO. 1 1. This alley will be 20' wide pavement with no parking in the alley right-of-way. Note 8 has been added. 2. Noted. 3. With the 20' alley pavement width and 10' PUE, there will be 12' of space for utilities, which is adequate. 4. The sewer report will be submitted with the construction drawings. 5. All common areas have labels. 6. Note 5 has been revised. All other comments have been noted. CITY OF COLLEGE STATION Planning d Development Servicer 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM December 3, 2007 TO: Jim Easterly, via fax 776-4747 FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: SUMMIT CROSSING (PP) - Preliminary Plat Staff reviewed the above-mentioned Preliminary Plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, December 10th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for January 3rd, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24" x 36" copy of the revised Preliminary Plat; and Nineteen (19) 11" x 17" copies of the revised Preliminary Plat. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. Please note that a Mylar original of the revised preliminary plat will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Joe Shultz, Civil Development, Ltd, via fax 764-7759 Case file #07-00500301 STAFF REVIEW COMMENTS NO. 1 Project: SUMMIT CROSSING (PP) - 07-00500301 PLANNING 1//1. Please complete page 2 of the application regarding parkland dedication due prior to filing of II the Final Plat. 42. Has the mylar of the master plan been submitted? I cannot find any record of it, if not, I please submit. +3. Provide total number of lots in the notes or title block. /4. Adjacent property is not zoned M-1. Our ownership records show the adjacent property to the west as Crescent Pointe Ltd. the property is zoned R-4 and C-1. 1/5. Provide current zoning on the property. /6. There seem to be a number of calls missing from the boundary. Please provide complete calls. 17. Clarify note 6. All building setbacks must be in compliance with the Unified Development Ordinance for townhomes since no modifications were requested with the rezoning. ® Are the sidewalks not extending through the detention area? Who is maintaining the detention area? It needs a lot and block or to be labeled as a common area. 9. Please show fire hydrants. c/(0. What is the 0.05 Acres with the sidewalk to the park? Common Area? Part of the lot? It is unclear. /11. Gross density exceeds the maximum allowed in the Comprehensive Plan of 9 DU per acre A (park area was not included in gross density calculation). 2. Are there any pipelines in the pipeline easement? If so, please give size of line, design pressure and product transported through the line. Reviewed by: Lindsay Boyer, Project Manager Date: November 30, 2007 ENGINEERING COMMENTS NO. 1 1. Please address the alley parallel and closest to SH 30 in regards to fire coverage. As fire will not use SH 30 for fire coverage, it appears that the alley will need to be used as a fire lane. Please address how parking will be handled on this alley, as any cars parking in the alley would not allow for fire truck access. 2. Additional easement may be needed by utilities once the construction documents have been submitted. 3. The proposed utilities located adjacent to alleys appear to only have 11 feet once the proposed PUE and ROW area not covered by pavement is accounted for, please address. 4. Please verify that the proposed sewer main sizing will adequately serve the entire sewer shed, as not to cut off any upstream adjacent properties from being served. 5. Please verify that all common areas have been labeled. 6. Please add drainage and access areas to note #5. Reviewed by: Josh Norton Date: December 3, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 12-3-07 FIRE 1. Buildings over 30 feet will be required to have a fire sprinkler system. 2. Fire Department connections for the fire sprinkler systems will have to be within a 100 feet of a fire hydrant. Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: 30 November 2007 SANITATION 1. Will need to conform to UDO ordinance regarding dumpster placement for this type of development. Reviewed by: Wally Urrutia Date: November 29, 2007