December 14, 2007
TO: Sam Vernon, Bleyl and Associates via fax# 979.260.3849
FROM: Crissy Hartl for Lindsay Boyer
SUBJECT: Engineering Document Comments for Gateway Office Building
Staff reviewed the above-mentioned engineering documents as requested. The following page
is a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review and approval of the
plans: /
V One (1) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter at
979.764.3570.
Attachments: Staff review comments
pc: R.L. Payne&Associates, via fax#979.696.8114
Case File No. 07-00500302
1101 Texas Avenue, P.O. Box 9960
(irri44, College Station, Texas 77842 fiPhone 979.764.3570/Fax 979.764.3496 l •/CITY OF COLLEGE TATION 0-de� i((��
MEMORANDUM a
December 4, 2007
TO: Sam Vernon, Bleyl and Associates, via email
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: GATEWAY OFFICE BLD (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the followin information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
,_s addressing the comment);
5CP°00 Easement Dedication Sheet and required documents (please allow 4 weeks to
.14 process);
e.' �_t?One (1) landscaping plan
Four lte plans; and -
V Four(4) revised grading plan.
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments
pc: R.L. Payne and Associates, via fax 979-696-8114
Case file #07-00500302
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 1 of 3
m B
Bleyl & Associates 1722 Broadmoor
& Suite 210
A Project Engineering & Management Bryan, TX 77802
December 9, 2007
Lindsay Boyer, AICP, Senior Planner
Planning and Development Services
City of College Station
P 0 Box 9960
College Station, Texas 77842
RE: Gateway Office Building Site Plan
Dear Lindsay,
Following are comments dated December 4th review of this project. Our response is listed in italics.
The Architect provided us building elevations that show a roof height of 30 at the building edges
and a 41 foot high non accessible roof that runs down the center of the building from front to back.
Because of this, the drive width for the new parking area has been increased from 24 feet to 26
feet. This change has been bubbled on the Site Plan and a copy of the Architects elevations is
attached to this letter.
PLANNING
1. Provide a landscape plan and elevations for conceptual site plan review by the Board. Final
floor plans and elevations will be required for final site plan approval. The landscape plan
and elevations will be submitted by the Architect under a separate cover.
2. Provide the gross square footage of the proposed building. The gross square footage is
21,200 SF and is listed on the Site Plan.
3. Provide bicycle parking details. (see Site Design Standards for standard detail) This detail
has been added to the Site Plan.
4. Provide overall building height. The building height is 41' at its maximum point. This
information has been added to the Site Plan.
5. Please note that any changes made to the plans that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review. Noted. See paragraph above.
Bryan Austin Conroe
(979)-268-1125 (512)-328-7878 (936)-441-7833
(979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax
LANDSCAPING
1. Provide a landscape plan that meets the requirements of the covenants and restrictions. It
appears that the original landscape plan for phase 1 used 65 existing trees to meet points,
however it appears that the trees you are reviewing were used in exceeding the minimum
point requirements. Landscaping plans will be submitted by the Architect under a separate
cover.
2. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed
as per City Ordinance 2394. This note will appear on the landscaping plans.
3. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394. This note will appear on the landscaping plans.
ENGINEERING COMMENTS NO. 1
1. Provide Plan and Profile for extension of public water main. A Utility Plan that includes the
profile for the public water main has been submitted for your review.
2. Provide revised Erosion Control and Grading Plan. A revised Erosion Control and Paving,
Grading, and Drainage Plan has been included for your review.
3. Show isolation valve and lockable lid as required on fire suppression line. Make sure
isolation valve is in a PUE. The valve is now shown and the lockable lid is called out in the
General Notes on the Utility Plan.
4. Provide Easement Dedication documents. These will be submitted under a separate cover.
5. Provide Fire Flow Report per Fire Code. A Fire Flow Report is included with this submittal.
SANITATION
1. Sanitation is ok with this project. Thank you.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes. This easement
will be submitted under separate cover.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design. Noted.
2. City will provide drawings for conduit installation. Noted. Thank you.
3. If conduit does not exist at designated transformer, developer to furnish and install conduit as
shown on electrical layout. Noted.
4. Developer pours transformer pad(s) per City specs and design. Noted.
5. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City). Noted. Thank you.
6. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to
bread(a�cstx.gov. This drawing will be emailed.
7. Developer provides load data for project. Noted.
8. To discuss any of the above electrical comments please contact Brent Read, at
979.764.5026. Noted. Thank you.
Please do not hesitate to call me at (979) 268-1125 if you need clarification or additional
information to complete your review.
erely,
MAAf/
am J. Vern , P.E.
Project Manager
Cc: Donald Ball
R.L. Payne and Associates
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
/—� Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
April 3, 2008 /
TO: Brett McCully, Bleyl Engineering; via fax: 260-3849'
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: GATEWAY OFFICE BLD (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
One (1) revised landscaping plan and irrigation plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: R. L. Payne &Associates; via fax: 69 1141
Sam Vernon; via fax: 260-3849
Case file#07-00500302
STAFF REVIEW COMMENTS NO. 2
Project: GATEWAY OFFICE BLD (SP) - 07-00500302
PLANNING
1. FYI: No further permits will be issued until a complete development package in
compliance with the Covenants and Restrictions is approved by the Advisory Board. This
includes a complete site plan, landscape plan, as well as civil and architectural
construction documents per email on January 4, 2008.
2. Existing trees may not count toward points without board approval.
3. Please show the Landscape and Utility Easement (LAUE). Points in the landscape
easement accrue as they would for regular streetscape points, however they may not be
counted toward the point requirements for the Developed Area.
4. Are you replacing the existing trees in the LAUE? The original site plan includes this
area.
5. The landscape points are insufficient. The covenants and restrictions require 60 points
per 1000 s.f. of developed area not 30.
6. All canopy trees must be at least 2.75 caliper inches.
7. All non-canopy trees must be at least 1.5 caliper inches.
8. Blue Agave and Soft Leaf Yucca are not on the approved plant list for College Station. If
they are to be proposed, please provide information that these plant varieties will thrive
in the USDA Hardiness Zone 8, as well as any other information and a picture of the
plants for the Board to consider.
9. What plant material is being used for general groundcover?
10. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock (not loose), or a perennial grass is required in parking lot islands, swales
and drainage areas, the parking lot setback, rights-of-way, and adjacent property
disturbed during construction.
11. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and
installed as per City Ordinance 2394.
12. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
13. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lindsay Boyer Date: April 3, 2008
(*. ff- 444
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 13, 2007
TO: Business Center Advisory Board
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: GATEWAY OFFICE BUILDING Site Plan
Attached is a copy of the site and grading plan for a proposed second building located at 101
Gateway Boulevard. The existing site for Prodigene was approved for construction in 1998 by
the Advisory Board. The applicant is requesting a clearing and grading permit for this area. All
clearing and site work is required to be reviewed by the Business Center Advisory Board
(Covenants and Restrictions Section 4.10)
The proposed plan is to remove 19 trees on the north of the existing building for the
development of Phase 2 located outside of the developed site area. A full site plan with
elevations, and landscaping plans will be required for any additional development and building
permits to be issued.
With the removal, the property will still maintain enough landscaping points to meet minimum
requirements of the Covenants and Restrictions of the Business Park. This permit will also not
affect the protected 0.4 acres along Gateway Boulevard.
Staff recommends approval with the condition that all engineering standards are met for clearing
of the property.
Attachments
1. Site Plan
2. Paving, Grading, and Drainage Plan
3. Preliminary Grading and Erosion Control Plan
Home of Texas A&M University
tirffill11111114
CITY OF COLLEGE STATION
Planning 6 Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 14, 2007
TO: Sam Vernon, Bleyl and Associates via fax# 979.260.3849
FROM: Crissy Hartl for Lindsay Boyer
SUBJECT: Engineering Document Comments for Gateway Office Building
Staff reviewed the above-mentioned engineering documents as requested. The following page
is a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review and approval of the
plans:
One (1) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter at
979.764.3570.
Attachments: Staff review comments
pc: R.L. Payne & Associates, via fax # 979.696.8114
Case File No. 07-00500302
ENGINEERING COMMENTS NO. 2
1. It appears that the looped system is just a loop for the fire line which should be a private
system. Simply extend a fire suppression line from the current line at the front of the
building.
2. Plans for the existing building showed sanitary extending underneath the building to
serve future expansion. Will this not serve your proposal?
3. Rename SW3P to Erosion Control Plan. SW3P requires additional information.
4. All sheets are labeled "1 of 1".
Reviewed by: Carol Cotter Date: December 14, 2007
B Bleyl & Associates 1722 Broadmoor
& Suite 210
:,- . A Project Engineering & Management Bryan, TX 77802
December 17, 2007
Carol Cotter
Development Engineering
City of College Station
P 0 Box 9960
College Station, Texas 77842
RE: Gateway Office Building Site Plan
Dear Carol,
Following are comments dated December 10th review of this project. Our response is listed in
italics.
ENGINEERING COMMENTS NO. 2
1. It appears that the looped system is just a loop for the fire line which should be a private
system. Simply extend a fire suppression line from the current line at the front of the
building. This change has been made.
2. Plans for the existing building showed sanitary extending underneath the building to serve
future expansion. Will this not serve your purpose? / measured the depth of this cleanout
and it is too shallow to extend.
3. Rename SW3P to Erosion Control Plan. SW3P requires additional information. This sheet
has been renamed.
4. All sheets are labeled "1 of 1". The sheets have been renumbered.
P -ase do not hesitate to call me at (979) 268-1125 if you need clarification or additional
l mation to complete your review.
er\ ,
11141 --
* 0 e non, P.E.
-rojec anager
Cc: Donald Ball
R.L. Payne and Associates
Bryan Austin Conroe
(979)-268-1125 (512)-328-7878 (936)-441-7833
(979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax
•
B
Bleyl & Associates 1722 Broadmoor
Suite 210
Project Engineering & Management Bryan, TX 77802
A
November 26, 2007
Carol Cotter
Planning and Development Services
City of College Station
P 0 Box 9960
College Station, TX 77842
RE: Business Center @ CS Lot 4R BL 3- Site Plan
Dear Carol,
The proposed 3.39 acre Gateway Office Building project site is located approximately
0.60 miles south of William D. Fitch Parkway at the intersection of the northbound
frontage road of State Highway 6 and Gateway Boulevard. The scope of the project
includes a parking lot addition and the construction of a two story, 21,000 square foot
office building. This letter determines the expected water and sewer demand for the
project.
SANITARY SEWER CAPACITY
The peak sanitary demand for the project was determined using the Fixture Unit Method
from the Bryan/College Station Unified Design Manual. This method multiplies each
fixture within the building by a specific loading factor to obtain a total number of fixtures
for the project. This number was then compared against Table II in the sanitary sewer
section of the B/CS Unified Design Manual to determine the peak demand.
Fixture Units:
Fixture Unit
Value
Fixture Type Load Factor
Bathroom
Group 6
Urinal 4 0/14)2.
Service Sink 3
Lavatory 3 r _/
Calculations: q:45
.C
Fixture units are multiplies by a factor of 2 in order to ensure a conservative design
Bryan Austin Conroe
(979)-268-1125 (512)-328-7878 (936)-441-7833
(979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax
(2 Bathroom Group x 6)+(1 Urinal x 4)+(l Service Sink x 3)+(l Lavatory x 4)= 23 Fixtures
(23 fixtures)x(2 stories)x(2)= 92 Fixtures
The calculated value of 92 fixture units was less than the lowest value within Table II so
a trend for Table II was established. From the trend it was determined that a value of 92
fixtures corresponds to 75.80 gpm of peak sanitary sewer demand.
Peak Sanitary Sewer Demand = 75.80 gpm = 0.17 cfs
A 6" sanitary sewer service lead provides more than enough capacity for this peak flow.
A calculation of the flow in a 6" PVC pipe at minimum slope is shown in section 3.1 of
this report.
WATER UTILITIES CAPACITY
The peak water demand was determined using the same method as the peak sanitary
sewer demand. A total of 92 fixtures were used to obtain a peak demand of 75.80 gpm.
Peak Water Demand = 75.80 gpm = 4,548 gph = 0.17 cfs
Assuming:
75% of the 21,000 square foot building is usable office space.
Each person has a personal workspace are of 100 square feet.
Water use per person per day is 50 gallons (from B/CS Unified Design Manual).
The average water demand is:
Average Water Demand = 21,000 x 0.75 x 50 gpm =100 = 7875 gpd
or 14.5 gpm per 9 hour day
PIPE FLOW CALCULATIONS
Calculate the Flowrate of a 6" Diameter PVC Sanitary Sewer Line
Using the Manning formula:
1.486 AR Z 1
�= 3S 2
n
Where:
Q = flowrate, cfs
n = roughness coefficient, using 0.011 for PVC pipe
A = cross-section area of pipe, sq. ft.
R = hydraulic radius, ft.
S = slope, ft/ft (minimum slope per B/CS Unified Guidelines)
Calculate area:
A = Tr r2
A = 0.196 sq. ft.
Calculate hydraulic radius:
R _ A
P
717„2
R =
271- r
R =1=0.125
2
Calculate full flow capacity assuming a minimum slope:
_ 1.486 2 '
Q 0.011 (0.196)(0.125)3 (0.008)-i
Q = 0.59 cfs
DRAINAGE
Construction of this phase will add approximately 23,700 square feet of impervious
cover. This results in an increased runoff of approximately 3.2 cfs during a 10% event
and 4.3 cfs increase during the 1% event.
The new parking areas will tie in to the existing parking areas. The existing grading
scheme uses the parking lot to collect and route stormwater into the Alum Creek Basin
existing stream section AC-1.
A drainage study and master plan was prepared prior to the development of The
Business Center at College Station and as was pointed out at the Pre-application
Conference, this second phase construction is accounted for in that original plan.
Please contact me with any questions, or if you require any additional information to
complete your technical review of this project.
Scerely,
-.PSEFTk. ``‘�
am Ver n, P.E. % SAM J. VERNON
Project Manager j 99353 i
jl$O,�.11�CENS��• �/
1�c0NA = _ /
B Bleyl & Associates 1722 Broadmoor
ihk.& Suite 210
A Project Engineering & Management Bryan, TX 77802
November 26, 2007
Lindsay Boyer, AICP, Senior Planner
Planning and Development Services
City of College Station
P 0 Box 9960
College Station, TX 77842
RE: Business Center @ CS Lot 4R BL 3- Site Plan
Dear Lindsay,
A grading and erosion control plan was submitted for review on November 12, 2007. The
Developer would like to begin removing underbrush and select trees to begin the construction of
Phase II of this site.
Following are comments dated November 19th review of this project. Our response is listed in
italics.
PLANNING
1. The subject tract is located in the City of College Station Business Center and is subject to
its Covenants and Restrictions. I have emailed all applicants a copy of these restrictions.
Received. Thank you.
2. The proposed area for clearing and grading is a protected area from the original site plan
(see Section 12.20 of Covenants and Restrictions for definition of protected area). The only
clearing permitted in protected areas is up to 50% of understory vegetation, with the
remaining vegetation left within the dripline of trees. All clearing must be done by hand only.
Canopy trees may not be removed. If you wish to remove this area from the protected area,
it must be in compliance with the Covenants and Restrictions for the Business Center and
reviewed by the Business Center Advisory Board. The original site plan for this tract was
completed and approved in 1998 showing a future second phase consisting of a second
building and parking. A portion of Phase I parking needed to convey stormwater to the
creek was even built northward in anticipation of the future building. This subject was
brought up at the PreApplication Conference on September 26`h where it was confirmed that
this was Phase ll of the approved, original site plan. Jennifer Prochazka was the Planner
present at this meeting.
3. All site work must be approved by the Business Center Advisory Board. Noted.
4. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review. Noted. 014°2;1
Bryan Austin q t (k) Conroe
(979)-268-1125 (512)-328-7878 (936)-441-7833
(979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax
ENGINEERING COMMENTS NO. 1
1. How will you ensure that there will be no fill placed in the floodplain at the western end of
proposed fill? The proposed 274' elevation is very close to the floodplain line near the
small drainage draw. A retaining wall will be built to accomplish this. The structural
details will be submitted as part of the architectural plans.
Please contact me with any questions you may have concerning these responses, or if you
require any other information before issuing a Clearing and Grading permit.
cerely,
1g
'am J. Ve on, P.E.
Project Manager
Cc: Donald Ball