HomeMy WebLinkAboutCost Estimate Ott
Service Mainte- na of ESTIMATE
the Brazos Valley, Inc.
P.O. Box 9855 Date Estimate #
College Station, TX 77842 11/15/2007 1704
Customer
Amberlake Homeowners'Association
P.O. Box 11018
College Station, TX 77842
Description Qty Cost Total
Complete improvements to waterfall on Woodcreek Drive in common area of
Amberlake Homeowners Association in Woodcreek Subdivision in College Station:
Waterfall upgrade: drain waterfall ponds, clean out the basin, install 6 new 1 5,000.00 5,000.001
Aquascape 7500 Pumps--6,700 GPH & 1/2 horsepower, and hardwire pumps to
electrical box. Includes 2 year factory warranty on pumps.
Plant new flowers and shrubs at waterfall and add mulch to beds at waterfall. 1 3,000.00 3,000.00T
Subtotal $8,000.00
Accepted by:
Sales Tax (8.25%) $660.00
Phone # Fax# E-mail
979-776-7785 979-776-0286 servicem@suddenlinkmail.com Total $8,660.00
Service ] [aiitenarrce of ESTIMATE
e Brazos
P.O. BON 9855 5 Date Estimate#
Co/lege Stations, TX 778412
10/5/2007 1691
Customer
Amberlake Homeowners'Association
P.U. Box 11018
College Station,TX 77842
Desczdption Qty Cost Total
Maintenance of Amberlake Homeowners'Association Common Area--Erosion 1 15500.00 15,500.00T
Control of North Lake: install interlocking bulkhead, bordering around the North
Lake to prevent erosion; will install approximately 8"in ground to 3" above normal
lake levels
Accepted by: Subtotal $15,500.00
Sales Tax (8.25%) $1,278.75
Phone# Fax# E-mail _
979-776-7785 979-776-0286 servicem@suddenlinkmali.com Total $16,778.75
Service Maintena of ESTIMATE
the 'Brazos Valley, nc.
P.O. Box 9855 Date Estimate#
College Station, TX 77842 5/2/2007 1638
Customer
Amberlake Homeowners'Association
P.O. Box 11018
College Station, TX 77842
Description Qty Cost Total
Maintenance of Amberlake Homeowners'Association Common Area--Erosion 1 31000.00 31 ,000.001
Control of North and South Lakes: install 2500 In. ft. of interlocking bulkhead,
bordering around both lakes to prevent erosion; will install approximately 8" in
ground to 3" above normal lake levels
back fill with topsoil
b�lkhad
Subtotal $31 ,000.00
Accepted by:
Sales Tax (8.25%) $2,557.50
Phone# Fax# E-mail
979-776-7785 979-776-0286 servicem@suddenlinkmail.com Total $33,557.50
Service Maintenata of ESTIMATE
the Brazos Valley, Inc.
P.O. Box 9855 Date Estimate #
College Station, TX 77842
12/27/2006 1595
Customer
Amberlake Homeowners'Association
P.O. Box 11018
College Station, TX 77842
Description Qty Cost Total
Landscaping of the common area along Woodcreek Drive, north and south of 1 6,000.00 6,000.001
Lake Forest Court:
build 8 beds between existing crape myrtles---37,44,45,40,37,44,44,44 feet long,
using 15 yards of bed mix, planting 75 (3-gallon) Knock-out Rosebushes, will
move the sprinkler heads to the street's curbline.
*Includes 1 year Warranty on plants.
Subtotal $6,000.00
Accepted by:
Sales Tax (8.25%) $495.00
Phone# Fax# E-mail
979-776-7785 979-776-0286 servicem@suddenlinkmail.com Total $6,495.00
TUCKER CONSTRUCTION
7441 Mize Road Bryan,TX 77808 979-412-0223
May 2, 2007
Dan Beltran
Service Maintenance
3810 Harvey Rd
College Station,TX 77845
RE: Wood Creek Pond Erosion Control
Proposal
Dear Dan:
Tucker Construction proposes to provide labor, materials,equipment, and trucking for the
following scope of work:
1. Place approx. 24"gravel ribbon(1/2"to 1 1/2") for 2275 LF(total bank of both
ponds) along waters edge
2. Clean edge so that grass grows back to gravel
Exclusions:
All seeding
Sod
Irrigation
One Lump Sum: $16,850.00
Respectfully Submitted,
Allison Tucker
Tucker Construction
Service Maintenance of ESTIMATE
the, Brazos Valley, Ine.
P.O. Box 9855 Date Estimate #
College Station, TX 77842 11/15/2007 1 704
Customer
Amberlake Homeowners'Association
P.O. Box 11018
College Station, TX 77842
Description Qty Cost Total
Complete improvements to waterfall on Woodcreek Drive in common area of
Amberlake Homeowners Association in Woodcreek Subdivision in College Station:
Waterfall upgrade: drain waterfall ponds, clean out the basin, install 6 new 1 5,000.00 5,000.00T
Aquascape 7500 Pumps--6,700 GPH & 1/2 horsepower, and hardwire pumps to
electrical box. Includes 2 year factory warranty on pumps.
Plant new flowers and shrubs at waterfall and add mulch to beds at waterfall. 1 3,000.00 3,000.00T
Subtotal $8,000.00
Accepted by:
Sales Tax (8.25%) $660.00
Phone # Fax# E-mail
979-776-7785 979-776-0286 servicem@suddenlinkmail.com Total $8,660.00
t�7-303
I(-4 -O7
9:(1S