HomeMy WebLinkAboutCost Estimate _ t _
(12/20/2007) Barbara Moore- Raintree c'in xls Page 1
Raintree Sign Cost Estimate
Item
Site Prep Elevate sign about 1' 0" $1,500
Limestone road base
Cement Stablized sand
Grade Select fill
Final Grade Top soil $450
Grass
Concrete Base 3000 ppsi $2,800
Pad, upright
Steel rebar
Form matl
Stone Austin stone $2,245
Stone angle $1,000
Cap per D Wood $160
Cylex per D Wood $1,650
per D Wood $500
Logo Includes letters $2,253
per D Wood
Installation $200
Tax $202
Crepe Myrtles 4-15 gal $900
Sub Total $13,860
Overheads Insurance, elec,water 8.00% $1,109
trash , cleanup
Profit 4.00% NC
$14,969