HomeMy WebLinkAboutstaff review STAFF REVIEW COMMENTS NO. 1
Project: PLAZAS AT ROCK PRAIRIE (PP) - 06-00500074
PLANNING
1. Please update the date of preparation in the title block to reflect the recent submittal.
2. Please add the `Commercial' label to Lot 3 as it is intended to be developed as a commercial
lot.
3. Rock Prairie Road is classified as a Major Arterial on the City's Thoroughfare Plan and
therefore requires 120' of right-of-way. Please dedicate half of the additional required
ROW (15').
4. It appears there to be a 25' building line with volume and page number that may be
associated with deed restrictions. If there are deed restrictions associated with this plat,
please submit them to our office.
5. Please add a note to the plat stating all setbacks will be in compliance with the Unified
Development Ordinance.
6. Please remove all certification statements as they will be required for the final plat.
7. Please update the General Notes references to `Harris County Clerk' with `Brazos County
Clerk'.
Reviewed by: Crissy Hartl Date: April 18,2006
ENGINEERING
1. Although you show an existing private access easement (v3922p282) near the southern
corner of the property,a driveway will not be permitted at this location as it does not meet
spacing requirements.
2. Dedicate a 20' PUE along eastern boundary of property over private sewer easement. Our
records show this line is actually public.
Reviewed by: Carol Cotter Date:April 21,2006
ELECTRICAL
1. For complete comments please see site plan for Plazas at Rock Prairie Project #06
00500080.
2. To discuss any of the above electrical comments,please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 04-21-06
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. Page 2 of 2