HomeMy WebLinkAboutstaff review STAFF REVIEW COMMENTS NO. 5
Project: CULPEPPER (DOMINION) REPLAT (FP) - 06-00500066
PLANNING
1. Please resubmit the Plat without the signature block for the City Secretary. Response to the
last review comments stated that it was removed but was not resubmitted.
2. Sheet CO1.1 - The legend is incorrect. Lots 2-A and 2-B seemed to be mixed up as well as
Lots 2-E and 2-F. Lot 2-H does not match what you reflected in the legend.
3. Again, staff will go on record at the Planning and Zoning Commission meeting that we will
not be supporting the building setback variances that are to be requested from the Zoning
Board of Adjustments.
4. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Jennifer Reeves Date: January 19, 2007
STAFF REVIEW COMMENTS NO. 3
Project: CULPEPPER (DOMINION) REPLA.T (FP) -06-00500066
PLANNING
1. Due to the odd shaped lots, please identify the lot lines for each lot with a different color or
different line types and provide a legend. Perhaps some of these questions can be answered with
a 1"=10' scale.
2. Dumpster enclosures are required to be 12' x 12' and for two dumpsters the requirement is 12' x
24'.Please provide the correct size enclosure.
3. Please provide a curb and pavement detail.
4. Staff will not support a plat that is creating lots that cannot meet the required building setbacks.
5. Please remove the City Secretary's signature from the Planning and Zoning Commission
certification.
6. (FYI) Lots 2-J thru 2-F Facing George Bush will be required a front setback, not a side street
setback.The same goes fot Lots 2-A thru 2-D that face Puryear Drive.
7. (FYI) A private access easement is being shown at Domixiik Drive. A driveway cut will not be
permitted at this location.
Reviewed by:Jennifer Reeves Date:January 8, 2007
STAFF REVIEW COMMENTS NO. 3
Project: CULPEPPER (DOMINION) REPLAT (FP) - 06-00500066
PLANNING
1. Due to the odd shaped lots, please identify the lot lines for each lot with a different color or
different line types and provide a legend. Perhaps some of these questions can be answered with
a 1"=10' scale.
2. Dumpster enclosures are required to be 12' x 12' and for two dumpsters the requirement is 12' x
24'. Please provide the correct size enclosure.
3. Please provide a curb and pavement detail.
4. Staff will not support a plat that is creating lots that cannot meet the required building setbacks.
5. Please remove the City Secretary's signature from the Planning and Zoning Commission
certification.
6. (FYI) Lots 2-J thru 2-F Facing George Bush will be required a front setback, not a side street
setback. The same goes for Lots 2-A thru 2-D that face Puryear Drive.
7. (FYI) A private access easement is being shown at Dominik Drive. A driveway cut will not be
permitted at this location.
Reviewed by:Jennifer Reeves Date:January 8, 2007
STAFF REVIEW COMMENTS NO. 3
Project: CULPEPPER (DOMINION) REPLAT (FP) - 06-00500066
PLANNING
1. The driveway variance must go before the Design Review Board and decided before the plat can
proceed,as the location of the access easement does not comply with City Ordinances.
2. Lots 2-A, 2-B, 2-C & 2-D are divided up by the driveway which would be considered as duplex lots. R-3
Zoning District is one of a group of no less than three, nor more than twelve, attached dwelling units.
The R-3 Zoning District does not allow for duplex development.
3. A drainage and access easement is being shown off of Dominik. An access easement will not be
permitted off of Dominik.
4. It appears from looking at the building placement on the construction documents that the required
building setbacks are not going to be feasible, therefore staff cannot not support this plat.
5. The construction documents and reports are still under review and may affect the plat.
Reviewed by:Jennifer Reeves Date: November 13, 2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
2of2
completely new review.
0
August 21, 2006 Gessner
Engineering
City of College Station
Development Services Department
1101 Texas Avenue
College Station, Texas 77840
Re: Dominion on Dominik
Culpepper Plaza Replat (FP) — Final Plat (06-00500066)
GE Job No.: 06-0120
Dear Sirs:
Attached is the revised Final Plat for the proposed Dominion on Dominik project
located at the intersection of George Bush East, Dominik and Puryear Drives.
The revised Final Plat was prepared based upon the comments received from
the Staff Review Comments No. 1 dated July 31 and August 1, 2006.
Responses to each comment are provided in the body of this letter and in the
order presented.
Planning
/1. The building areas were removed from the plat
/2. All lots except the common area are 2,000 square feet in size.
/3. The County of Dallas Certificate was removed from the Plat.
/4. The City Council approval was removed from the Plat.
/ 5. Each Lot Number has been reassigned as requested.cA six foot wide sidewalk will be provided along Dominik and Puryear
ives as requested.
7. The construction plans for the extention of utilities to the site are
attached.
/8. I contacted Wally in Sanitation and he indicated that we will be able to
use two (2), 300 gallon dumpsters for solid waste disposal.
1712 Southwest Parkway,Suite#105,College Station,Texas 77840•P.O.Box 10763,77842-0763•979.680.8840•FAX 979.680.8841
1400 South Austin Street,Brenham,Texas 77833•979.836.6855•FAX 979.836.6847
www.GessnerEngineering.eom
Engineering
1. The detention facilities shall not be situated within the Public utility
easements.
2. Proposed public utility easements have been added between the lots as
depicted on the Final Plat.
3. Construction documents associated with the extension of public utilities
to this site are provided for your review. I have also attached the
engineer's cost estimate for the extension of these public utilities.
4. The proposed location of the private water and sanitary sewer services
are denoted on the construction documents for the City of College Station
Staff review.
5. The construction documents for the extension of the public utility
services are attached for your review as requested.
Electrical
1. The developer shall install the requested conduits per the specs and
design.
2. The developer understands that the City will provide drawings for
conduit installation.
3. The developer shall provide 30 feet of rigid or IMC conduit for riser
poles.
4. The developer shall intercept the existing conduit at the designated
transformer and extend as required.
5. The developer shall furnish and install conduit as shown on the
electrical layout if it does not exist.
6. The developer shall pour the transformer pads as per the City of
College Station specifications and design.
7. The developer shall install pull boxes and secondary pedestals as per
the City of College Station specifications and design.
Gessner Engineering
8. The developer shall provide digital AutoCAD 2000 or later version of the
Final Plat to wdavis(ci to civ when approved.
9. The developer shall provide the load data for the project with the
electrical plans.
10. The developer shall provide a temporary blanket easement with the
construction plan submitted for review.
11. The developer shall provide electric easements for electrical
infrastructure as installed for electric lines (including street lights).
It has been a pleasure to submit this information to the Development Services
department. If you have any questions, please contact me.
Sincerely,
Gessner Engineering
IMF
Alto 'ogers, P.E.
Gessner Engineering
ENGINEERING COMMENTS NO. 2 (Clarification for previous comments NO. 1)
1. Private drainage facilities or detention ponds should not be located in public
utility easements.
2. Public Utility Easements are only desired where public utilities are being
extended or need to be extended in the future.
3. Construction documents are required for the needed extensions of public water
and sanitary sewer mains. Each lot should be adjacent to both water and
sanitary sewer mains. Water main extensions should be looped.
4. Please provide the proposed locations for the private water and sanitary sewer
service lines from the main to each lot on the previously mentioned construction
documents. Private service lines are not allowed to cross adjacent lots.
5. The submittal and review of these construction documents are a requirement of
this final plat being forwarded to P&Z.
Reviewed by: Josh Norton Date: August 1, 2006
ENGINEERING COMMENTS NO. 1
1. Please submit construction documents for require public water and sanitary
sewer infrastructure extensions.
2. Please differentiate public utility easements from private drainage easements,
as it has not been the practice of the CoCS to maintain private detention ponds
or private drainage easements.
Reviewed by: Josh Norton Date: July 28, 2006
STAFF REVIEW COMMENTS NO. 1
Project: CULPEPPER PLAZA REPLAT (FP) - 06-00500066
PLANNING
1. The construction documents and reports are still under review and may affect the plat.
Reviewed by:Jennifer Reeves Date:August 25, 2006
NOTE: Any changes made to the plans,that haze not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on
your plans.Any additional changes on these plans that haze not been pointed out to the City,will constitute a completely new review
2of2
ENGINEERING COMMENTS NO. 2 (Clarification for previous comments NO. 1)
1. Private drainage facilities or detention ponds should not be located in public utility
easements.
2. Public Utility Easements are only desired where public utilities are being
extended or need to be extended in the future.
3. Construction documents are required for the needed extensions of public water
and sanitary sewer mains. Each lot should be adjacent to both water and
sanitary sewer mains. Water main extensions should be looped.
4. Please provide the proposed locations for the private water and sanitary sewer
service lines from the main to each lot on the previously mentioned construction
documents. Private service lines are not allowed to cross adjacent lots.
5. The submittal and review of these construction documents are a requirement of
this final plat being forwarded to P&Z.
Reviewed by: Josh Norton Date: August 1, 2006
STAFF REVIEW COMMENTS NO. 1
Project: CULPEPPER PLAZA REPLAT (FP) - 06-00500066
PLANNING L\
1. Please remove the building area depicted on the plat. Only lot lines need to be shown.
2. Minimum lot area for R-3 is 2000-square feet. Lot is not meeting this area requirement, thus a
variance will be required. The variance request will have to go before the Zoning Board of
Adjustments prior to the Plat moving forward to the Planning and Zoning Commission.
3. Please remove the County of Dallas Certificate off of the Plat. The subject property is located in
Brazos County.
4. Please remove the Approval of City Council Certificate off of the Plat. This certificate is not
required.
5. Please assign each lot a lot number or a letter and block for identification. (Example: Lotl-R,
Block A)
6. A 6-foot sidewalk will be required along Puryear Street and the existing side walk along George
Bush East will need to be finished out with this development.
7. The construction documents and reports are still under review and may affect the plat..
8. This project will not be required a site plan, how will trash pick up be handled? (Please contact
Wally in Sanitation @ 764.3841)
Reviewed by:Jennifer Reeves Date:July 25,2006
ENGINEERING COMMENTS NO. 1
1. Please submit construction documents for require public water and sanitary sewer
infrastructure extensions.
2. Please differentiate public utility easements from private drainage easements, as it
has not been the practice of the CoCS to maintain private detention ponds or private
drainage easements.
Reviewed by: Josh Norton Date: July 28, 2006
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and install
conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes & secondary pedestals as per city specs and design.
(pull boxes & secondary pedestals provided by the city).
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 2
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan
email to wdavis@cstx.gov
9. Developer provides load data for project.
10. Developer provides temporary blanket easement for construction purposes.
11. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
12. To discuss any of the above electrical comments, please contact Weldon Davis at
979.764.5027.
Reviewed by: Weldon Davis Date: July 25, 2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 3
STAFF REVIEW COMMENTS NO. 5
Project: CULPEPPER(DOMINION) REPLAT(FP)-06-00500066
PLANNING
1. Please resubmit the Plat without the signature block for the City Secretary. Response to the
last review comments stated that it was removed but was not resubmitted.
2. Sheet CO1.1 - The legend is incorrect. Lots 2-A and 2-B seemed to be mixed up as well as
Lots 2-E and 2-F. Lot 2-1-i does not match what you reflected in the legend.
3. Again, staff will go on record at the Planning and Zoning Commission meeting that we will
not be supporting the building setback variances that are to be requested from the Zoning
Board of Adjustments.
4. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Jennifer Reeves Date: January 19, 2007
STAFF REVIEW COMMENTS NO. 1
Project: CULPEPPER PLAZA REPLAT(FP) -06-00500066
PLANNING
1. Please remove the building area depicted on the plat. Only lot lines need to be shown.
2. Minimum lot area for R-3 is 2000-square feet. Lot is not meeting this area requirement, thus a
variance will be required. The variance request will have to go before the Zoning Board of
Adjustments prior to the Plat moving forward to the Planning and Zoning Commission.
3. Please remove the County of Dallas Certificate off of the Plat. The subject property is located in
Brazos County.
4. Please remove the Approval of City Council Certificate off of the Plat. This certificate is not
required.
5. Please assign each lot a lot number or a letter and block for identification. (Example: Lotl-R,
Block A)
6. A 6-foot sidewalk will be required along Puryear Street and the existing side walk along George
Bush East will need to be finished out with this development.
7. The construction documents and reports are still under review and may affect the plat..
8. This project will not be required a site plan, how will trash pick up be handled? (Please contact
Wally in Sanitation @ 764.3841)
Reviewed by:Jennifer Reeves Date:July 25,2006
ENGINEERING COMMENTS NO. 1
1. Please submit construction documents for require public water and sanitary sewer
infrastructure extensions.
2. Please differentiate public utility easements from private drainage easements, as it
has not been the practice of the CoCS to maintain private detention ponds or private
drainage easements.
Reviewed by: Josh Norton Date: July 28, 2006
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and install
conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes & secondary pedestals as per city specs and design.
(pull boxes & secondary pedestals provided by the city).
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 2
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan
email to wdavis@cstx.gov
9. Developer provides load data for project.
10. Developer provides temporary blanket easement for construction purposes.
11. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
12. To discuss any of the above electrical comments, please contact Weldon Davis at
979.764.5027.
Reviewed by: Weldon Davis Date: July 25, 2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 3
ENGINEERING COMMENTS NO. 2 (Clarification for previous comments NO. 1)
1. Private drainage facilities or detention ponds should not be located in public utility
easements.
2. Public Utility Easements are only desired where public utilities are being
extended or need to be extended in the future.
3. Construction documents are required for the needed extensions of public water
and sanitary sewer mains. Each lot should be adjacent to both water and
sanitary sewer mains. Water main extensions should be looped.
4. Please provide the proposed locations for the private water and sanitary sewer
service lines from the main to each lot on the previously mentioned construction
documents. Private service lines are not allowed to cross adjacent lots.
5. The submittal and review of these construction documents are a requirement of
this final plat being forwarded to P&Z.
Reviewed by: Josh Norton Date: August 1, 2006