Loading...
HomeMy WebLinkAboutCorrespondence TRANSMISSION VERIFICATION REPORT TIME : 04/1012006 14:27 NAME : COOS DEVELOPMENT SER FAX : 9797643496 TEL : 9797643570 SER. # : BROE2J341073 DATE,TIME 04/10 14:26 FAX NO./NAME 97649601 DURATION : 00:49 PAGE(S) 03 RESULT OK MODE STANDARD ECM (4,4111141 CITY OF COLLEGE STATION Armin a Development Service, 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570/Fax 979,764.3496 MEMORANDUM April 10, 2006 TO: Parviz Vessali via fax 764-9601 FROM: Trey Fletcher, Project Manager SUBJECT: GREENS PRAIRIE CENTER (MP) Staff reviewed the above-mentioned master plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 17th al 10:00 a.m., your project will be placed on the next available Planning & Zoning Commiscion meeting scheduled for May 4th at 7.00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised master plan; Fifteen (15) 11" x 17' copies of the revised master plan; One (1) Mylar original of the revised master plan; and One (11 copy of the digital file of the master plan on diskette or e-mail to Ck#111411114 CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 10, 2006 TO: Parviz Vessali via fax 764-9601 FROM: Trey Fletcher, Project Manager SUBJECT: GREENS PRAIRIE CENTER (MP) Staff reviewed the above-mentioned master plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 17th at 10:00 a.m., your project will be placed on the next available Planning & Zoning Commission meeting scheduled for May 4th at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised master plan; Fifteen (15) 11" x 17" copies of the revised master plan; One (1) Mylar original of the revised master plan; and One (1) copy of the digital file of the master plan on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov; and Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Joe Schultz via fax 764-7759 Case file#06-00500063 Trey Fletcher-SDCSApr3.doc 1 MEMORANDUM To: City of College Station From: Karl Nelson, TxDOT Date: April 7, 2006 Subject: SITE DEVELOPMENT COMMENTS --- April 3, 2006 1. Visoski Subdivision(Replat) (FM 60) - If No Additional Access is Required, No Comment. However, if the entire property is redeveloped only one(1) access drive will be permitted per TxDOT access spacing rules for 40 MPH. Additional access will be to Poplar Street. Appropriate permits will be required for any future work in the ROW @ this site, which should include drainage,etc. 2. Culpepper Plaza (Replat) - No Comment. 3. Jordan Subdivision (Replat)(SH 30) - If No Additional Access is Required, No Comment. However, if entire property is redeveloped only one(1)access drive will be permitted per TxDOT access spacing regulations for 50 MPH. Appropriate permits will be required for any future work in the ROW @ this site,which should include drainage,etc. 4. North Forest Subdivision (Preliminary Plat) (SH 6) - Access driveways to SH 6 EFR must meet TxDOT's current"Regulations for Access Driveways to State Highways". Regulations are primarily based on posted speed limits and distances between proposed &adjacent access points.Where posted speed limits are 50 MPH or greater the required spacing between access points is 425'. Proposed south access drive will not meet reauirements. Access should be to an interior street or shared with the south adjacent property. Appropriate data will be required for any future permits @ this site. 5. Greens Prairie Center(Master Plan) - Access driveways to SH 6 WFR &SH 40 must meet TxDOT's current"Regulations for Access Driveways to State Highways". Regulations are primarily based on posted speed limits and distances between proposed&adjacent access points. Where posted speed limits are 50 MPH or greater the required spacing between access points is 425'. Access should be to an interior street or shared. Trey Fletcher- SDCSApr3.doc ,.. 2 Appropriate data will be required for any future permits @ this site. 6. North Forest Professional Park(Site Plan) (SH 6) - See Comments for Item 4. >>>"Mandi Alford"<Malford(a.cstx.gov> The following attachment is the list of new development projects submitted to Development Services this week. (4/03/06) Mandi Alford Staff Assistant City of College Station Development Services 1101 Texas Avenue College Station,Tx 77840 (979)764-3570 Cu LI 3 ID'. GU TEXCON TRANSMITTAL Date: April 17, 2006 To: Trey Fletcher Development Services City of College Station From: Joe Schultz, P.E. Texcon General Contractors 1707 Graham Road College Station, Texas 77845 Phone: (979) 764-7743 Subject: Revised Master Plan Greens Prairie Center College Station, Texas Remarks: Attached are 2 full-sized copies and 15-11x17 copies of the revised Master Plan for the above-referenced project. We will submit the mylar and the digital file once final approval is given. Please let me know if you need anything else.