Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: FRANK VISOSKI (FP-REPLAT) - 06-00500062 PLANNING 1. The construction documents and reports are still under review and may affect the plat. 2. As discussed in the pre application meeting on January 4, 2006, please provide cross access easement. Reviewed by: Jennifer Reeves Date: 04-06-06 ELECTRICAL Developer installs conduit per city specs and design. City will provide drawings for conduit installation. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. Developer to intercept existing conduit at designated transformers and extend as required. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. Developer pours transformer pad(s) per city specs and design. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to wdavis@cstx.gov Developer provides load data for project. Developer provides temporary blanket easement for construction purposes. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 15' Easement to be granted in rear of property along Poplar Street. 10' Easement to be granted to the south right of way line of University Drive, and a 10' easement along the south right of way line along the north property line of Lot 18R. To discuss any of the above electrical comments, please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: April 4, 2006 1. If No Additional Access is Required, No Comment. However, if the entire property is redeveloped only one (1) access drive will be permitted per TxDOT access spacing rules for 40 MPH. Additional access will be to Poplar Street. Appropriate permits will be required for any future work in the ROW @ this site, which should include drainage, etc. Reviewed by: Karl Nelson, TXDOT Date: 04-07-06 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2