Loading...
HomeMy WebLinkAboutStaff Review DESIGN REVIEW BOARD WOLF PEN CREEK DESIGN DISTRICT STAFF REPORT Project Manager: Trey Fletcher Report Date: March 29, 2006 E-mail: tfletcher@cstx.gov Meeting Date: April 7, 2006 Project#: 06-500061 For WOLF PEN CREEK CONDOS (DRB) — DESIGN DISTRICT REVIEW (PROJ) Location: 305 Holleman Dr E Applicant: Jane Kee, Agent for Jim Stewart, Developer Item Summary: The applicant is requesting a site visit by the Design Review Board prior to meeting to review the complete site plan on a future agenda. Through the site visit, the applicant is seeking input regarding the following issues: existing trees, overflow parking, and trail access. In the Wolf Pen Creek (WPC) District, a Conditional Use Permit is required to establish a multi-family development. If a multi-family development incorporates non-residential uses on the first floor, the development is permitted by right. The Conditional Use Permit for this project was approved by the City Council on February 23, 2006 with conditions. A copy of the Ordinance is attached. Being a Conditional Use Permit within a Design District, this project is somewhat unique. Conditional Use Permits are typically approved a detailed site plan and is part of the adopting Ordinance; however, being in Wolf Pen Creek the DRB has significant purview. This includes the following: • Final action on design district site plans • Approve or deny building and sign colors in any designated design district • Hear and decide variance requests to the amount of required parking in WPC • Hear and decide appeals of the Administrator's application of the site plan requirements to assure compliance with site plan review criteria specified in the UDO. Administrator Recommendations: Staff does not have any recommendation regarding this item. The concept plan will be revisited by the Planning & Zoning Commission on April 20th. Subsequent to this meeting, the detailed site plan will be presented to the DRB for necessary review and approvals at which time staff recommendations will be provided at the request of the DRB. Issues/Items for Review: 1. Treatment of the minimum reservation area 2. Relationship of buildings to site 3. Relationship of buildings and site to adjoining area 4. Landscaping Attachments: 1. Cover Letter 2. Conceptual Site plan 3. Ordinance DESIGN REVIEW BOARD WOLF PEN CREEK DESIGN DISTRICT STAFF REPORT Project Manager: Trey Fletcher Report Date: March 29, 2006 E-mail: tfletcher@cstx.gov Meeting Date: April 7, 2006 Project #: 06-500061 For WOLF PEN CREEK CONDOS (DRB) — DESIGN DISTRICT REVIEW (PROJ) Location: 305 Holleman Dr E Applicant: Jane Kee, Agent for Jim Stewart, Developer Item Summary: The applicant is requesting a site visit by the Design Review Board prior to meeting to review the complete site plan on a future agenda. Through the site visit, the applicant is seeking input regarding the following issues: existing trees, overflow parking, and trail access. In the Wolf Pen Creek (WPC) District, a Conditional Use Permit is required to establish a multi-family development. If a multi-family development incorporates non-residential uses on the first floor, the development is permitted by right. The Conditional Use Permit for this project was approved by the City Council on February 23, 2006 with conditions. A copy of the Ordinance is attached. Being a Conditional Use Permit within a Design District, this project is somewhat unique. Conditional Use Permits are typically approved a detailed site plan and is part of the adopting Ordinance; however, being in Wolf Pen Creek the DRB has significant purview. This includes the following: • Final action on design district site plans • Approve or deny building and sign colors in any designated design district • Hear and decide variance requests to the amount of required parking in WPC • Hear and decide appeals of the Administrator's application of the site plan requirements to assure compliance with site plan review criteria specified in the UDO. Administrator Recommendations: Staff does not have any recommendation regarding this item. The concept plan will be revisited by the Planning & Zoning Commission on April 20th. Subsequent to this meeting, the detailed site plan will be presented to the DRB for necessary review and approvals at which time staff recommendations will be provided at the request of the DRB. Issues/Items for Review: 1. Treatment of the minimum reservation area 2. Relationship of buildings to site 3. Relationship of buildings and site to adjoining area 4. Landscaping Attachments: 1. Cover Letter 2. Conceptual Site plan 3. Ordinance