Attached are the Civil Site Plans for the Boston Pizza project. This project is
situated on a 0.33 acre building pad site (legal description attached) situated in
the University Town Center Subdivision in College Station, Texas. The proposed
project consists of the construction of a commercial building and the associated
sidewalks and utility extensions at an existing building pad site. All the utilities,
storm water facilities and parking have been provided to the site by the
developer.
Please note that the Landscape Plan is not being submitted at this time. It is
currently being prepared by Mr. Alan King with the Land Design Group. Upon
completion, the landscape plan will be submitted for your review under a
separate cover.
It has been a pleasure to submit this information to the Development Services
department. If you have any questions, please contact me.
Sincerely,
Gessner Engineering
A4‘ g, .
A • '. -ogers, P.E.
1712 Southwest Parkway,Suite#105,College Station,Texas 77840•P.O.Box 10763,7 7842-076 3•979.680.8840•FAX 979.680.8841
1400 South Austin Street,Brenham,Texas 77833•979.836.6855•FAX 979.836.6847
www.GessnerEngineering.com
Page 1 of 1
•
Alan Gibbs - Fwd: Boston Pizza Site Plan
From: Alan Gibbs
To: Haver, Chris; McCarty, Benjamin; Reeves, Jennifer; Simms, Lance
Date: 4/11/2006 5:43:15 PM
Subject: Fwd: Boston Pizza Site Plan
Fyi, I've included Lance's previous comment to Abuelo's regarding COs as #2 below.
Ben, let me know what you find out about #4 from the building plans. Thanks.
Alan
>>> Alan Gibbs 4/11/2006 5:40:31 PM >>>
Alton,
I have a few questions regarding the subject Site Plan:
1. Is there a revision(s) between the plans with sealed dates of 3/16 and 3/27?
2. Fyi, a temporary or permanent CO will be issued for Boston Pizza after the structure and site are found to be
in compliance with City codes and ordinances (this includes parking areas, landscaping, drives, etc.). We
acknowledge that the other structures proposed in phase 2B may not be complete at the time a CO is issued for
Boston Pizza. We also realize that the detention area may not be 100% complete. However, the detention area
must be fully functioning as determined by City Engineer prior to the issuance of a CO.
3. The domestic water tap should be off the main not the fire line.
4. Please clarify if there is intended to be two fire sprinkler connections into the building as it appears on the
Site Plan.
5. Please verify the extent of the existing public water line - if any of the fire line has been constructed to date.
A valve is necessary on the fire line as well if it is not already existing.
Please contact me if you would like to discuss further.
Thanks,
Alan
Alan Gibbs, P.E.
Sr. Asst. City Engineer
City of College Station
file://C:\Documents%20and%20Settings\agibbs\Local%20Settings\Temp\GW}00004.HTM 4/11/2006
From: "Chuck Ellison" <Chuck@ellisonlaw.com>
To: "Lance Simms" <Lsimms@cstx.gov>
Date: 12/7/2005 8:59:31 AM
Subject:
Lance
I should be thanking you because as always, you go the extra mile to
help resolve issues. We appreciate your assistance and promptness very
much. You have accurately described our discussion in this e-mail.
Thank you again!
Chuck
Original Message
From: Lance Simms [mailto:Lsimms@cstx.gov]
Sent: Tuesday, December 06, 2005 12:31 PM
To: Chuck Ellison
Cc: Alan Gibbs; Chris Haver; Joey Dunn; Jennifer Reeves; Kim Foutz; Lee
Robinson
Subject: University Town Center
Chuck:
Thanks for meeting with City staff earlier today concerning building
permits and site plan issues related to Abuelos restaurant in Phase 2B,
University Town Center. I wanted to follow-up with a summary of our
discussion.
Slab only permit: The City is willing to issue a slab only permit for
Abuelos provided the site issues identified in the meeting are resolved.
This includes finalizing the location of the backflow prevention device
for the fire sprinkler system and reconciling the civil/architectural
plans. The contractor also needs to amend the building permit
application to request a slab only.
Full building permit: The City will issue a full building permit for
Abuelos after site plan approval. To date, the primary issue delaying
site plan approval has been the TxDot permits for the two access points
on University Drive East. It is my understanding that you are working
with a consultant to expedite the driveway permit process through TxDot.
A temporary or permanent CO will be
issue or uelos after the structure and site are found to be in
compliance with City codes and ordinances (this includes parking areas,
landscaping, drives, etc.). We acknowledge that the other structures
proposed in phase 2B may not be complete at the time a CO is issued for
Abuelos. We also realize that the detention area may not be 100%
complete. However, the detention area must be fully functioning as
determined by City engineers prior to the issuance of a CO.
Thanks again Chuck and please let me know if this summary does not
accurately describe our discussion.
Lance Simms
Assistant Director of Planning & Development Services City of College
Station
1101 Texas Avenue
College Station, TX 77840
Phone: 979.764.3741
Fax: 979.764.3496
College Station. Heart of the Research Valley.
CC: "Alan Gibbs" <Agibbs@cstx.gov>, "Chris Haver" <Chaver@cstx.gov>, "Joey Dunn"
<Jdunn@cstx.gov>, "Jennifer Reeves" <JREEVES@cstx.gov>, "Kim Foutz" <kfoutz@cstx.gov>, "Lee
Robinson" <LROBINSO@cstx.gov>, "David Scarmardo" <david@scarmardofoods.com>, "Fred Paine"
<fred@klingeng.com>, "Barbara Giesenschlag" <Barbara@ellisonlaw.com>
Jennifer Reeves - Re: JReeves033006/Bostons/College Station, TX/ Elevation/Color Renderings Page 1
From: Jennifer Reeves
To: Terah Rios
Date: 3/31/2006 10:39:11 AM
Subject: Re: JReeves033006/Bostons/College Station, TX/ Elevation/Color Renderings
These colors and elevations look good and can be approved. However, you may want to pass on that the
signage is approved separately and will be required to meet Section 5.8.A.2. Signs and Section 7.4 Signs.
You may want to look at how the City of College Station calculates the attached signage area and how
signs cannot stick out more than 12-inches away from or above the building. Let em know if I can be of
any more assistance.
Thanks,
Jennifer
Jennifer Reeves
Staff Planner
City of College Station
jreeves@cstx.gov
(979) 764-3570
(979) 764-3496 FAX
>>> "Terah Rios"<trios@camargocopeland.com>03/30/06 5:11 PM >>>
Jennifer,
Please see the attached color rendering as requested for Boston's, College
Station, TX. If you need additional information, or have any questions
please feel free to call me.
Thank you,
Terah Rios
CamargoCopeland Architects, LLP
14755 Preston Road, Suite 845
Dallas, Texas 75254
PH 972.934.7600 Ext 222
FX 972.934.7601
Jennifer Reeves- Boston Pizza Building Plans Page 1
From: Jennifer Reeves
To: arogers@gessnerengineering.com
Date: 3/29/2006 1:11:15 PM
Subject: Boston Pizza Building Plans
Good afternoon Alton - I wanted to mention to you that all of the front buildings of the University Town
Center(including Boston Pizza) is located in the Corridor Overlay District and we will also need to review
elevation drawings and color samples. (See Section 5.8.A.3. Building Colors in the UDO). Give me a call if
you have any questions or shoot me an email.
Thanks,
Jennifer
Jennifer Reeves
Staff Planner
City of College Station
jreeves@cstx.gov
(979) 764-3570
(979) 764-3496 FAX
Jennifer Reeves - Boston Pizza Site Plan - Page 1
From: Jennifer Reeves
To: arogers@gessnerengineering.com
Date: 3/29/2006 12:42:23 PM
Subject: Boston Pizza Site Plan
Alton - Per our meeting this morning in my office. The Boston Pizza site plan that was submitted does not
match the stamped approved University Town Center site layout. This plan will not be reviewed at this
time. I will be waiting for your resubmittal after you get the correct site layout from Fred at Kling
Engineering. Thanks so much for coming over to discuss this project. I look forward to your next submittal.
Please feel free to call me if you have any questions.
Thanks,
Jennifer
Jennifer Reeves
Staff Planner
City of College Station
jreeves@cstx.gov
(979) 764-3570
(979) 764-3496 FAX
SPENCER J. BUCHANAN ASSOCIATES, INC.
A TERRACON COMPANY
Geotechnical • Materials • Ci
Design • Consulting
Bryan, Texas
206 North Sims Street, 77803/P.O. Box 672, 77806/(979) 822-3767
Letter of Transmittal
TO: MR ISRAEL KOITE
CITY OF COLLEGE STATION
POST OFFICE BOX 9960
COLLEGE STATION TEXAS 77842-0960
PROJECT: North Project NoSA1071020 nal Park
Please find the followin• items enclosed as indicated: COPIES PAGES DATED
TEST RESULTS
v IN-PLACE DENSITYTS
ID FLEXIBLE BASE MATERIAL TEST REPORT
0 CONCRETE REPORT
[] SUMMARY OF LABORATORY TEST DATA
❑ OPTIMUM MOISTURE/DENSITY RELATIONSHIP __1111111111
v THICKNESS OF ASPHALTIC CONCRETE TEST REPORT __11111111111
0ASPHALTIC CONCRETE TEST REPORT 111.111111111111 2/15/07
® LIME-TREATED/CRUSHED STONE SUBGRADE DEPTH TEST 11111111111111 2/15/07
® MISCELLANEOUS SERVICES I SAMPLE PICK-UP SHEET
[] SOIL-CEMENT TEST 'EPORT
Signed:
Robin Corr
February 21, 2007
C D
L1(3611)
Wet_
April 3, 2006
Cityof College Station Gessner
Development Services Department Engineering
1101 Texas Avenue
College Station, Texas 77840
Re: Boston Pizza
University Town Center Subdivision
940 University Drive East
College Station, Texas
GE Job No.: 05-0233
Dear Sirs:
Attached are the revised Civil Site Plans for the Boston Pizza project. This
project is situated on a 0.33 acre building pad site (legal description attached)
situated in the University Town Center Subdivision in College Station, Texas.
The proposed project consists of the construction of a commercial building and
the associated sidewalks and utility extensions at an existing building pad site.
All the utilities, storm water facilities and parking have been provided to the site
by the developer.
It has been a pleasure to submit this information to the Development Services
department. If you have any questions, please contact me.
Sincerely,
Gessner Engineering
0 OF•TF AA
` ALTON G. ROGERS do$
•
Af •-0• t •,50833 ;Q
Alton G. Rogers, P.E. �o� ' oo� ``��
l�SSioNAL FNS
1712 Southwest Parkway,Suite#105,College Station,Texas 77840•P.O.Box 10763,77842-0763.979.680.8840•FAX 979.680.8841
1400 South Austin Street,Brenham,Texas 77833•979.836.6855•FAX 979.836.6847
www.GessnerEngineering.com
Gessner
Engineering
LETTER OF TRANSMITTAL
TO: City of College Station
Development Services
FROM.: Alton G. Rogers, P.E.
DATE: November 14, 2004
SUBJECT: Boston Pizza
NUMBER OF SETS: 1
I SITE PLAN
/ COPY OF GROUND LEASE
ADDITIONAL COMMENTS:
This information is being submitted for the referenced project predevelopment meeting on
November 21, 2005 at 2 PM.
1712 Southwest Parkway,Suite#105 College Station,Texas 77842•P.O.Box 10763,77842-0763
Phone 979-680-8840•Fax 979-680-8841
1400 South Austin Street,Brenham,Texas 77833 •Phone 979-836-6855•Fax 979-836-6847
www.GessnerEngineering.com