HomeMy WebLinkAboutCorrespondence March 24, 2006 0 City of College Station Gessner Development Services Department Engineering 1101 Texas Avenue College Station, Texas 77840 Re: Boston Pizza University Town Center Subdivision 940 University Drive East College Station, Texas GE Job No.: 05-0233 Dear Sirs: Attached are the Civil Site Plans for the Boston Pizza project. This project is situated on a 0.33 acre building pad site (legal description attached) situated in the University Town Center Subdivision in College Station, Texas. The proposed project consists of the construction of a commercial building and the associated sidewalks and utility extensions at an existing building pad site. All the utilities, storm water facilities and parking have been provided to the site by the developer. Please note that the Landscape Plan is not being submitted at this time. It is currently being prepared by Mr. Alan King with the Land Design Group. Upon completion, the landscape plan will be submitted for your review under a separate cover. It has been a pleasure to submit this information to the Development Services department. If you have any questions, please contact me. Sincerely, Gessner Engineering A4‘ g, . A • '. -ogers, P.E. 1712 Southwest Parkway,Suite#105,College Station,Texas 77840•P.O.Box 10763,7 7842-076 3•979.680.8840•FAX 979.680.8841 1400 South Austin Street,Brenham,Texas 77833•979.836.6855•FAX 979.836.6847 www.GessnerEngineering.com Page 1 of 1 • Alan Gibbs - Fwd: Boston Pizza Site Plan From: Alan Gibbs To: Haver, Chris; McCarty, Benjamin; Reeves, Jennifer; Simms, Lance Date: 4/11/2006 5:43:15 PM Subject: Fwd: Boston Pizza Site Plan Fyi, I've included Lance's previous comment to Abuelo's regarding COs as #2 below. Ben, let me know what you find out about #4 from the building plans. Thanks. Alan >>> Alan Gibbs 4/11/2006 5:40:31 PM >>> Alton, I have a few questions regarding the subject Site Plan: 1. Is there a revision(s) between the plans with sealed dates of 3/16 and 3/27? 2. Fyi, a temporary or permanent CO will be issued for Boston Pizza after the structure and site are found to be in compliance with City codes and ordinances (this includes parking areas, landscaping, drives, etc.). We acknowledge that the other structures proposed in phase 2B may not be complete at the time a CO is issued for Boston Pizza. We also realize that the detention area may not be 100% complete. However, the detention area must be fully functioning as determined by City Engineer prior to the issuance of a CO. 3. The domestic water tap should be off the main not the fire line. 4. Please clarify if there is intended to be two fire sprinkler connections into the building as it appears on the Site Plan. 5. Please verify the extent of the existing public water line - if any of the fire line has been constructed to date. A valve is necessary on the fire line as well if it is not already existing. Please contact me if you would like to discuss further. Thanks, Alan Alan Gibbs, P.E. Sr. Asst. City Engineer City of College Station file://C:\Documents%20and%20Settings\agibbs\Local%20Settings\Temp\GW}00004.HTM 4/11/2006 From: "Chuck Ellison" <Chuck@ellisonlaw.com> To: "Lance Simms" <Lsimms@cstx.gov> Date: 12/7/2005 8:59:31 AM Subject: Lance I should be thanking you because as always, you go the extra mile to help resolve issues. We appreciate your assistance and promptness very much. You have accurately described our discussion in this e-mail. Thank you again! Chuck Original Message From: Lance Simms [mailto:Lsimms@cstx.gov] Sent: Tuesday, December 06, 2005 12:31 PM To: Chuck Ellison Cc: Alan Gibbs; Chris Haver; Joey Dunn; Jennifer Reeves; Kim Foutz; Lee Robinson Subject: University Town Center Chuck: Thanks for meeting with City staff earlier today concerning building permits and site plan issues related to Abuelos restaurant in Phase 2B, University Town Center. I wanted to follow-up with a summary of our discussion. Slab only permit: The City is willing to issue a slab only permit for Abuelos provided the site issues identified in the meeting are resolved. This includes finalizing the location of the backflow prevention device for the fire sprinkler system and reconciling the civil/architectural plans. The contractor also needs to amend the building permit application to request a slab only. Full building permit: The City will issue a full building permit for Abuelos after site plan approval. To date, the primary issue delaying site plan approval has been the TxDot permits for the two access points on University Drive East. It is my understanding that you are working with a consultant to expedite the driveway permit process through TxDot. A temporary or permanent CO will be issue or uelos after the structure and site are found to be in compliance with City codes and ordinances (this includes parking areas, landscaping, drives, etc.). We acknowledge that the other structures proposed in phase 2B may not be complete at the time a CO is issued for Abuelos. We also realize that the detention area may not be 100% complete. However, the detention area must be fully functioning as determined by City engineers prior to the issuance of a CO. Thanks again Chuck and please let me know if this summary does not accurately describe our discussion. Lance Simms Assistant Director of Planning & Development Services City of College Station 1101 Texas Avenue College Station, TX 77840 Phone: 979.764.3741 Fax: 979.764.3496 College Station. Heart of the Research Valley. CC: "Alan Gibbs" <Agibbs@cstx.gov>, "Chris Haver" <Chaver@cstx.gov>, "Joey Dunn" <Jdunn@cstx.gov>, "Jennifer Reeves" <JREEVES@cstx.gov>, "Kim Foutz" <kfoutz@cstx.gov>, "Lee Robinson" <LROBINSO@cstx.gov>, "David Scarmardo" <david@scarmardofoods.com>, "Fred Paine" <fred@klingeng.com>, "Barbara Giesenschlag" <Barbara@ellisonlaw.com> Jennifer Reeves - Re: JReeves033006/Bostons/College Station, TX/ Elevation/Color Renderings Page 1 From: Jennifer Reeves To: Terah Rios Date: 3/31/2006 10:39:11 AM Subject: Re: JReeves033006/Bostons/College Station, TX/ Elevation/Color Renderings These colors and elevations look good and can be approved. However, you may want to pass on that the signage is approved separately and will be required to meet Section 5.8.A.2. Signs and Section 7.4 Signs. You may want to look at how the City of College Station calculates the attached signage area and how signs cannot stick out more than 12-inches away from or above the building. Let em know if I can be of any more assistance. Thanks, Jennifer Jennifer Reeves Staff Planner City of College Station jreeves@cstx.gov (979) 764-3570 (979) 764-3496 FAX >>> "Terah Rios"<trios@camargocopeland.com>03/30/06 5:11 PM >>> Jennifer, Please see the attached color rendering as requested for Boston's, College Station, TX. If you need additional information, or have any questions please feel free to call me. Thank you, Terah Rios CamargoCopeland Architects, LLP 14755 Preston Road, Suite 845 Dallas, Texas 75254 PH 972.934.7600 Ext 222 FX 972.934.7601 Jennifer Reeves- Boston Pizza Building Plans Page 1 From: Jennifer Reeves To: arogers@gessnerengineering.com Date: 3/29/2006 1:11:15 PM Subject: Boston Pizza Building Plans Good afternoon Alton - I wanted to mention to you that all of the front buildings of the University Town Center(including Boston Pizza) is located in the Corridor Overlay District and we will also need to review elevation drawings and color samples. (See Section 5.8.A.3. Building Colors in the UDO). Give me a call if you have any questions or shoot me an email. Thanks, Jennifer Jennifer Reeves Staff Planner City of College Station jreeves@cstx.gov (979) 764-3570 (979) 764-3496 FAX Jennifer Reeves - Boston Pizza Site Plan - Page 1 From: Jennifer Reeves To: arogers@gessnerengineering.com Date: 3/29/2006 12:42:23 PM Subject: Boston Pizza Site Plan Alton - Per our meeting this morning in my office. The Boston Pizza site plan that was submitted does not match the stamped approved University Town Center site layout. This plan will not be reviewed at this time. I will be waiting for your resubmittal after you get the correct site layout from Fred at Kling Engineering. Thanks so much for coming over to discuss this project. I look forward to your next submittal. Please feel free to call me if you have any questions. Thanks, Jennifer Jennifer Reeves Staff Planner City of College Station jreeves@cstx.gov (979) 764-3570 (979) 764-3496 FAX SPENCER J. BUCHANAN ASSOCIATES, INC. A TERRACON COMPANY Geotechnical • Materials • Ci Design • Consulting Bryan, Texas 206 North Sims Street, 77803/P.O. Box 672, 77806/(979) 822-3767 Letter of Transmittal TO: MR ISRAEL KOITE CITY OF COLLEGE STATION POST OFFICE BOX 9960 COLLEGE STATION TEXAS 77842-0960 PROJECT: North Project NoSA1071020 nal Park Please find the followin• items enclosed as indicated: COPIES PAGES DATED TEST RESULTS v IN-PLACE DENSITYTS ID FLEXIBLE BASE MATERIAL TEST REPORT 0 CONCRETE REPORT [] SUMMARY OF LABORATORY TEST DATA ❑ OPTIMUM MOISTURE/DENSITY RELATIONSHIP __1111111111 v THICKNESS OF ASPHALTIC CONCRETE TEST REPORT __11111111111 0ASPHALTIC CONCRETE TEST REPORT 111.111111111111 2/15/07 ® LIME-TREATED/CRUSHED STONE SUBGRADE DEPTH TEST 11111111111111 2/15/07 ® MISCELLANEOUS SERVICES I SAMPLE PICK-UP SHEET [] SOIL-CEMENT TEST 'EPORT Signed: Robin Corr February 21, 2007 C D L1(3611) Wet_ April 3, 2006 Cityof College Station Gessner Development Services Department Engineering 1101 Texas Avenue College Station, Texas 77840 Re: Boston Pizza University Town Center Subdivision 940 University Drive East College Station, Texas GE Job No.: 05-0233 Dear Sirs: Attached are the revised Civil Site Plans for the Boston Pizza project. This project is situated on a 0.33 acre building pad site (legal description attached) situated in the University Town Center Subdivision in College Station, Texas. The proposed project consists of the construction of a commercial building and the associated sidewalks and utility extensions at an existing building pad site. All the utilities, storm water facilities and parking have been provided to the site by the developer. It has been a pleasure to submit this information to the Development Services department. If you have any questions, please contact me. Sincerely, Gessner Engineering 0 OF•TF AA ` ALTON G. ROGERS do$ • Af •-0• t •,50833 ;Q Alton G. Rogers, P.E. �o� ' oo� ``�� l�SSioNAL FNS 1712 Southwest Parkway,Suite#105,College Station,Texas 77840•P.O.Box 10763,77842-0763.979.680.8840•FAX 979.680.8841 1400 South Austin Street,Brenham,Texas 77833•979.836.6855•FAX 979.836.6847 www.GessnerEngineering.com Gessner Engineering LETTER OF TRANSMITTAL TO: City of College Station Development Services FROM.: Alton G. Rogers, P.E. DATE: November 14, 2004 SUBJECT: Boston Pizza NUMBER OF SETS: 1 I SITE PLAN / COPY OF GROUND LEASE ADDITIONAL COMMENTS: This information is being submitted for the referenced project predevelopment meeting on November 21, 2005 at 2 PM. 1712 Southwest Parkway,Suite#105 College Station,Texas 77842•P.O.Box 10763,77842-0763 Phone 979-680-8840•Fax 979-680-8841 1400 South Austin Street,Brenham,Texas 77833 •Phone 979-836-6855•Fax 979-836-6847 www.GessnerEngineering.com