Loading...
HomeMy WebLinkAboutCorrespondence (111411111 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 27, 2006 TO: Nantucket, Ltd. - Phyllis Hobson, via fax: 979.846.0652 FROM: Jennifer Prochazka, Senior Planner SUBJECT: SOUTH HAMPTON PH 4 (FP-REPLAT) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 3, 2006 at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, April 20, 2006 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. 4:7)Two (2) 24"x36" copies of the revised final plat; C Fifteen (15) 11"x17" copies of the revised final plat; n Parkland Dedication must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to - sgriffin@cstx.gov and awelsh@cstx.gov; and V Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all • the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me or Carol Cotter at 979.764.3570. N, Attachments: Staff review comments / cc: Texcon - Joe Schultz, P.E., via fax: 979.764.7759 v Case file #06-00500057 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 TXCON at) - ��t TRANSMITTAL Date: April 3, 2006 To: Jennifer Prochazka Staff Planner, Development Services City of College Station From: Ginger Urso, P.E. Texcon General Contractors 1707 Graham Road College Station, Texas 77845 Phone: (979) 764-7743 Subject: Final Plat -Revised South Hampton, Phase 4 and Nantucket, Phase 7 College Station, Texas Remarks: Attached are 2 full sized copies and 15•-11"x17" copies of the Revised Final Plat for the above-mentioned project, as well as our response to Staff Comments No. 1. The mylar of the Final Plat and the digital file will be provided if there are no further revisions required for this plat. Let me know if you have any questions or need any additional information. rD l K TRANSMITTAL Date: November 22, 2006 To: Carol Cotter Graduate Engineer City of College Station From: Joe Schultz, P.E. Civil Developmen , td. 2900 Longmire D ive, Suite K College Station, Texas 77845 Phone: (979) 764-7743 Subject: Addendum to Drainage Report South Hampton, Phase 4 &Nantucket, Phase 7 College Station, Texas Remarks: Attached are two copies of the Addendum to the Drainage Report which identifies the existing and proposed minimum finished floor elevations as discussed in yesterday's meeting. Please let me know if you need anything else. cc: Bob Mosley, P.E. Alan Gibbs, P. E. Phyllis Hobson From: Alan Gibbs To: Cotter, Carol; Koite, Israel; Mosley, Bob Date: 10/27/2006 2:04:37 PM Subject: Fwd: RE: South Hampton 4 We are accepting the Letter of Credit for 2 months. Kent claims they will be complete in the timeframe. Israel -As we approach Dec 26, 2006 please keep us informed if the LOC needs to be extended. Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works >>> Deborah Grace 10/27/2006 1:28:28 PM >>> You got it. Thanks! >>>Alan Gibbs 10/27/06 1:24 PM >>> fyi Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works >>>Alan Gibbs 10/27/2006 1:24:18 PM >>> Grace, Please process this plat and file the Letter of Credit. Note the expiration is only 2 months for your tickler file. Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works >>> "Kent Laza" < KLaza(a�CDLBCS.com > 10/27/2006 1:09:14 PM >>> Yes. I think it can be done easily. Original Message From: Alan Gibbs Jmailto:Aaibbs(a cstx.govl Sent: Friday, October 27, 2006 12:26 PM To: Kent Laza Cc: Joe Schultz Subject: Re: South Hampton 4 Do you expect the required test data and foreseeable punchlist to be completed as well before Dec 26 so a letter of completion can be granted? Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works >>> "Kent Laza" < KLaza( CDLBCS.com > 10/27/2006 9:33:49 AM >>> Alan, In regard to the expiration date on the Letter of Credit, two months should be more than enough. Last week when I was there, the crews were compacting the base. I'm told they got densities and primed it before the rains. If we get a few days of good weather to dry out the asphalt should go down in a day. The only other items on the list are minor things that are either finished by now or can be finished with a couple of days of good weather. I would expect everything to be done by the first or second week in November. Kent College Station. Heart of the Research Valley. ..._._........ . Deborah Grace- Re: South Hampton Phase 4 FP-Replat Page 1 From: Bob Mosley To: Chrystal Hamilton; Deborah Grace Date: 10/23/2006 10:54:09 AM Subject: Re: South Hampton Phase 4 FP-Replat They were submitting an estimate for unfinished infrastructure so they could provide a financial guarantee. >>> Deborah Grace 10/23/2006 10:52 am >>> Thanks much! Once you get it fax me a copy. They are wanting the plat filed. >>> Chrystal Hamilton 10/23/06 10:51 AM >>> I do not have the LOC. >>> Deborah Grace 10/23/06 10:46 AM >>> Has the infrastructure been accepted?