Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS Project: VERIZON WIRELESS (CUP) - 06-00500050 PLANNING 1. This is not an approved stealth design, therefore the tower must comply with tower separation and thoroughfare setback requirements. Harvey Road is a Major Arterial on the city's Thoroughfare Plan. 2. Provide evidence that this tower site meets the tower separation requirement of 3,500 feet on the map showing the proposed tower site and one-mile radius. 3. The thoroughfare setback requirement, based on the 80-foot tower, the setback imposed is the tower height multiplied by a factor of 3, or 240 feet from the centerline of the right-of-way of the thoroughfare. 4. This application may not be referred to the Planning & Zoning Commission/City Council as scheduled unless the above requirements are addressed appropriately. However, if you wish to proceed as is, Staff will recommend denial because the proposed tower conditions are not in compliance with the UDO, 'gi Landscaping is required, what landscaping is proposed? 6. The UDO requires at least four views for the visual impact analysis, only two were provided. 7. Provide elevation of tower and false wall/sign. 8. Provide with tower inventory with information required in Sec. 6.8.T.8.b of the UDO. 9. The grid plan or propagation map should show the `search ring'that was required for siting of the proposed facility. C Site plan refers to a 15-foot building line and see note 14. Please explain. Note 14 was not found. Reviewed by: Trey Fletcher Date: 3-22-2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. ELECTRICAL Developer installs conduit per city specs and design. City will provide drawings for conduit installation. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser. Developer to intercept existing conduit at designated transformers and extend as required. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. Developer pours transformer pad(s) per city specs and design. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to wdavis(acstx.qov Developer provides load data for project. Developer provides temporary blanket easement for construction purposes. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). To discuss any of the above electrical comments, please contact Weldon Davis at 979.764.5027 Reviewed by: Weldon Davis Date:3/14/06