HomeMy WebLinkAboutStaff Review Staff Review Comments — No. 1
AGGIELAND BUSINESS PARK (PP) - Preliminary Plat— 06-00500048
PLANNING
1. Rename one or both streets to eliminate duplicate street names.
2. Provide R-O-W acreage.
3. Provide total number of lots.
4. Show and label the College Station Extra-territorial Jurisdiction (ETJ) boundary in
Vicinity Map and preliminary plat.
5. TxDOT Comments: Aggieland Business Park (Prelim. Plat) (FM 60)
Access driveways to FM 60 must meet TxDOT's current"Regulations for Access Driveways to
State Highways". Regulations are primarily based on posted speed limits and distances
between proposed & adjacent access points. Where posted speed limits are 50 MPH or more
the required spacing between access points is 425'. Where driveway spacing is insufficient
joint access will be required or access to an internal street. Appropriate information will be
required for any future permits @ this site, which should include drainage data, etc
Reviewed by: Trey Fletcher Date: March 9, 2006
BRAZOS COUNTY
1. Comments from Brazos County are forthcoming.
Reviewed by: Gary Arnold Date: March 13, 2006
ENGINEERING
1. Denote PUE along Raymond Stotzer Parkway.
2. Drainage pattern (arrows) and proposed drainage easement do not match. (Lot 2)
Reviewed by: Carol Cotter Date: March 9, 2006
ELECTRICAL
1. No Comments
2. To discuss any of the above electrical comments, please contact Tony Michalsky at
979.764.3438.
Reviewed by: Tony Michalsky Date: 3-9-06